?? Y' APPENDIX A-r 7
' Kansas Gas'and Electric Company Docket: 50-482/85 '
_ olf Creek Generating Station ~
License: ' NPF-421 W
p
=-
a.
"During an NRCfinspection. conducted during -Octpber 1985,- a violatio'niof-NRC requirements ' was. identified. The violation involved the failure to isolate a e
s nonseismic' sight glass ~ level gage.
In accordance with the " General Statement.of Policy.and. Procedure for:NRC Enforcement Actions,"
,10 CFRrPart 2, Appendix'C (1985), the. violation is listed below:
J'
- Nonseismic Sight Glass Level Gage N'ot Isolated
<10 CFR-Part 50, Appendix.B,; Criterion V states','in part, " Activities r
s
. affecting quality.,shall be prescribed by documented ~ instructions, Lprocedures, or. drawings = of a type appropriate to the circumstances...."
y.
The Checklist (CKL) EG-120, Revision 5, " Component Cooling Water System -
Valv'e, Switch, and Breaker Lineup,!' has been established in accordance with 10 CFR Part 50; Appendix B, Criterion V.
~
l Contrary to the above, CKL EG-120 was inappropriate to the circumstances in.that Valves EG-V 160, 161, 171, and 172 were opened in accordance twith Checklist A of CKL EG-120 when the valves should have been closed
.due to the'1evel gage between-the valves being nonseismic.
This is"a Severity Level-IV violation.(Suppleme.nt I.D).(50-482/8537-01).
+
.Pursua' t to the provisions of 10 CFR 2.201,~ Kansas Gas and Electric Company n
is.hereby required to submit to this'0ffice, within 30 days of the date of
-the >1etter transmitting this Notice, a written statement-or explanation in reply, including:
(1) the reason for-the violation'if admitted, (2) the
. corrective steps which have been taken and the results achieved; (3). the corrective. steps which will be taken to avoid further violations; and-h.
'(4) thefdate when full ~ compliance will be' achieved.,Where good cause.is shown, consideration will be given to extending the response time.
e Dated at Arlington,: Texas '
'k -
this Ja/ day of 4 //em 1986.
u f,
t
=
8601070423'86 j82 POR ADOCK O PDR G