ML20136E963
| ML20136E963 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 12/30/1985 |
| From: | Kister H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil Public Service Enterprise Group |
| Shared Package | |
| ML20136E965 | List: |
| References | |
| NUDOCS 8601070172 | |
| Download: ML20136E963 (1) | |
See also: IR 05000354/1985056
Text
m
-
C
.
r
.
DEC 3 01985
Docket No. 50-354
Public Service Electric and Gas Company
ATTN: Mr. Corbin A. McNeill, Jr.
Vice President - Nuclear
Nuclear Ad:ninistration Building
P.O. Box 236
Hancock's Bridge, New Jersey
08038
Gentlemen:
Subject:
Inspection No. 50-354/85-56
This letter transmits the findings of the October 28 - December 1, 1985 inspec-
tion of Hope Creek Generating Station by Mr. A. R. Blough and Mr. J. Lyash.
Those findings have been discussed with Mr. A. Giardino of your staff.
No violations of NRC requirements-were found, and you need not reply.
Your cooperation with us is appreciated.
Sincerely,
Orihinal Signed sy,
Harry B. Kister, Chief
Projects Branch No. 1
Division of Reactor Projects
Enclosure:
NRC Inspection Report No. 50-354/85-56
cc w/ enc 1:
-A. E. Giardino, Manager, Quality Assurance Engineering and Construction
R. L. Mitti, General Manager, Nuclear Assurance and Regulation
Public Document' Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State 'of New Jersey
bec w/ enc 1:
E. Conner, RI
R. Fuhrmeister, RI
"
B601070172 851230
ADOCK O
34
0
0FFICIAL RECORD COPY
IR HC 85-56 - 0001.0.0
12/16/85 2 5 0l
RI-
RI:DRP
P
i \\
E
JStrosnider
HRis er
12/l7/85
. 12/[l/85
12g85
_.
. - . . , ._,
_.___ _ __
,
. . _ _
-._ _. .