Forwards Insp Repts 50-498/85-08 & 50-499/85-08 on 850501-0630.No Violation or Deviation Noted.One New Unresolved Item Identified
ML20136E648
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/31/1985
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20136E652 List:
References
NUDOCS 8601070086
Download: ML20136E648 (2)


See also: IR 05000498/1985008

Text

"

x. m

-

,

,

7,;

, ,

yn < g.. . .

.

-

,

,

16 --[ - DEC 311985

,.

, . I; a -

m4

'"

E :In' Reply; Refer To:

m* Dockets: . =.'50-498/85-08

'

' 50-499/85-08

' -

,

, ,

~

F* 5 Houston Lighting & Power Company l 4

ATTN: ~J.:H. Goldberg-

.

"< Group Vice President, Nuclear

P.I0.' Box'1700

Houston, Texas 77001.

' Gentlemen:'!

-

- -

a, .

'This refers to the inspection conducted by Mr. D. R. Carpenter of this office

during ;the period May 1 - June 30, .1985, of activities authorized by NRC

y, Construction Permits CRRP-128 and 129 for the. South Texas Project, Units 1 and

3. , g 2,'and to the discussion of our findings with members of your staff at the

s,S . donclusion of the' inspection.

.

hreasexaminedduring"theunannouncedinspectionincludedsitetours; licensee 1

-

, - action on previously, identified items; plant maintenance; inplace protection i *

of equipment; operator training and simulator, and startup activities. Within

'

,,

' these areas. .the. inspection consisted of selective examination of procedures

? Jand representative records, interviews with personnel, and' observations by the

,

"

C'. inspectors. These findirqs are documented in the enclosed inspection report.

' ~

' Within the scope of the inspection, no violations or deviations were

-

? identified.

c %s , ,

J , t ,

~ 0ne'new unresolved item was identified and is discussed in paragraph 4 of

i this enclosed inspection report. -

f '

,

'Should you have any questions concerning this inspection, we will be pleased to ,

discuss them with you.

l

Sincerely,

'

,

Ori;;lnal signea e,

. .l. E. Gaguardo

t

J. E. Gagliardo, Chief

Reactor Projects Branch

%

Enclosure:

Appendix - NRC Inspection Report

50-498/85-08

50-499/85-08

a

cc w/ enclosure: (cont.onnextpage)

a .

RPB

5

i RIV: SRI RP

l DRCarpente ir GL able JEGagli 'Jd

! ///#/85 /s./4/85 fy/30/ i

k (

! g601070006 B Q 490

PDR ADOCK O DR

o

.

\(o\oll

i

,

i

Houston Lighting & Power Company -2-

i

Houston Lighting & Power Company

ATTN: M. Wisenberg, Manager,'

Nuclear Licensing

P. O. Box 1700

Houston, Texas 77001

Brian Berwick, Esquire

Asst. Attorney General

'

Environmental Protection Div.

P. 0. Box 12548, Capitol Station

Austin, Texas 78711

Lanny Alan Sinkin

Citizens Concerned About

Nuclear Power, Inc.

Christic Institute

1324 North Capitol Street

Washington, D.C. 20002

Charles Bechhoefer, Esquire

Chairman, Atomic Safety & Licensing'

Board

U.S. Nuclear Regulatory Comission

Washington, DC 20555

Dr. James C. Lamb, III

313 Woodhaven Road

Chapel Hill, North Carolina 27514

Frederick J. Shon

Administrative Law Judge

Atomic Safety and Licensing Board

+ U.S. Nuclear Regulatory Comission

Washington, DC 20555

Ray Goldstein, Esquire

Gray, Allison and Becker

100 Vaughn Building

807 Brazos

Austin, Texas 78701

Texas Radiation Control Program Director

bec distrib. by RIV:

  • RPB DRSP
  • Rc,ident Inspector-OPS R. D. Martin, RA
  • Resident Inspector-CONST. *SectionChief(RPB/C)
  • R&SPB * MIS SYSTEl1
  • RIV File *0. Weiss,LFMB(AR-2015)
  • RSTS Operator R. Pirfo, ELD '
  • R. G. Taylor, RPB/C *RSB
  • w/766

_ _ _ _ _ _ _ _ _ _ _ - _