ML20136E547
| ML20136E547 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 10/25/1985 |
| From: | Wyke T DUKE POWER CO. |
| To: | Mcguire D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 26021, NUDOCS 8511210514 | |
| Download: ML20136E547 (1) | |
Text
DUKE POWER COMPANY TELEPHONE: AREA 704
' 0 80*3318' GENEllAL OFFICES 37s.4at:
422 SOUTH CHURCH STREET CIultLorrE. N. C. 2S242 f, _ 34,7 OTO00 SbT9004-7%f D%r*
h[-b m \\ 1%
hp(
October 25, 1985 4
RECElVEQ s g.
USNRC Region II C
NOV a 885 > D Director, Office of Inspection and Enforcement
- 7 d.S. NUCLEAR REGULATORf *S P
P. O. Box 2203
'o car.nS310:1 Atlanta, Georgia 30303 PWS3
- f. tail Section
$y
-..,.3 Attention: Dave McGuire x N._/
Subj ect:
Notification of Spent Fuel Shipments This letter and attached shipping schedule are provided to inform the Co=nission of Duke Power Company's intent to con-tinue shipments of spent fuel from Oconee Nuclear Station to McGuire Nuclear Station. Duke Power Company will be both ship-per and receiver. The mode of transit will be truck-trailer and the carrier will be Tri-State Motor Transit Company.
We will notify you by telephone of schedule changes in excess of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
In compliance with 10 CFR 73.37, all schedule change notifications will reference the attached schedule only.
T. F. Wyke, Chief Engineer Mechanical and Nuclear Division D. 5. S f
9 By:
J. F. Norris, Jr., Supervising Design Engineer O
Fuel Cycle Operations
%g 4rg '
1 GRW:dyh 9
M0y B yg A Attachment 4
cc:
W. R. _ Cross _
Dlg d
EhTyl'diNflYmlE3NRC-Washington) 2 E. II. Geddie-
'd ww, Y.
~
.A, e g.s s 1
i<
8BA"AB8MBia8ljgv J6M/
F