ML20136E547

From kanterella
Jump to navigation Jump to search
Forwards Shipping Schedule to Continue Shipments of Spent Fuel from Oconee to McGuire Nuclear Station.Mode of Transit Will Be truck-trailer.Carrier Will Be Tri-State Motor Transit Co.W/O Schedule
ML20136E547
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/25/1985
From: Wyke T
DUKE POWER CO.
To: Mcguire D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
26021, NUDOCS 8511210514
Download: ML20136E547 (1)


Text

DUKE POWER COMPANY TELEPHONE: AREA 704

' 0 80*3318' GENEllAL OFFICES 37s.4at:

422 SOUTH CHURCH STREET CIultLorrE. N. C. 2S242 f, _ 34,7 OTO00 SbT9004-7%f D%r*

h[-b m \\ 1%

hp(

October 25, 1985 4

RECElVEQ s g.

USNRC Region II C

NOV a 885 > D Director, Office of Inspection and Enforcement

7 d.S. NUCLEAR REGULATORf *S P

P. O. Box 2203

'o car.nS310:1 Atlanta, Georgia 30303 PWS3

f. tail Section

$y

-..,.3 Attention: Dave McGuire x N._/

Subj ect:

Notification of Spent Fuel Shipments This letter and attached shipping schedule are provided to inform the Co=nission of Duke Power Company's intent to con-tinue shipments of spent fuel from Oconee Nuclear Station to McGuire Nuclear Station. Duke Power Company will be both ship-per and receiver. The mode of transit will be truck-trailer and the carrier will be Tri-State Motor Transit Company.

We will notify you by telephone of schedule changes in excess of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

In compliance with 10 CFR 73.37, all schedule change notifications will reference the attached schedule only.

T. F. Wyke, Chief Engineer Mechanical and Nuclear Division D. 5. S f

9 By:

J. F. Norris, Jr., Supervising Design Engineer O

Fuel Cycle Operations

%g 4rg '

1 GRW:dyh 9

M0y B yg A Attachment 4

cc:

W. R. _ Cross _

Dlg d

EhTyl'diNflYmlE3NRC-Washington) 2 E. II. Geddie-

'd ww, Y.

~

.A, e g.s s 1

i<

8BA"AB8MBia8ljgv J6M/

F