Text
_.
. - - .
. . . _ .
- . _ _ . . - . . .
m__.
- .
.,
[g""8%k
NUCLEAR REGULATORY COMMISSION
UNITED STATES
'
REoloN IV
,.
,
3'.,*/f
511 RYAN PLAZA DRIVE, SulTE 400
%9
MAR I 01997
Otto' L. Maynard, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, Kansas 66839
SUBJECT: NRC INSPECTION REPORT 50-482/97-04 AND NOTICE OF VIOLATION
Dear Mr. Maynard:
An NRC inspection was conducted January 11 through February.22,1997, at your Wolf
Creek Generating Station reactor facility. The enclosed report presents the scope and
results of that inspection.
During this inspection, five violations were identified in tne engineering, maintenance,
operations, and plant support areas. Violation A is of concern because it is an example
where your corrective action evaluation was not sufficiently broad to identify this issue
during your preparation of Licensee Event Report 50-482/96 10. Violations B, C, and D
are of concern because they demonstrate continued problems in controlling activities
-
associated with the turbine-driven auxiliary feedwater pump. While the plant staff
identified some of the examples of these violations, and others were self-revealing,
enforcement discretion is not considered appropriate for these violations because of the
number of significant problems that you have had with the turbine-driven auxiliary
feedwater pump during the past year. After reviewing your responses to these three
violations, we will consider whether a management meeting is needed to further discuss
the continuing problems with activities associated with the turbine-driver auxiliary
l
feedwater pump. Violation E is of concern because you inadvertently reduced your
emergency planning effectiveness, and your corrective actions were not prompt in that the
shif t supervisor was not informed of the error in the emergency action levels for 7 days.
These violations are cited in the enclosed Notice of Violation (Notice), and the
circumstances surrounding the violations are described in detail in the enclosed report.
Please note that you are required to respond to this letter and should follow the
instructions specified in the enclosed Notice when preparing your response. The NRC will
use your response, in part, to determine whether further enforcement action is necessary
to ensure compliance with regulatory requirements.
Two unresolved items were identified concerning your use of vendor technical manuals and
cold overpressure mitigation associated with the installation of your normal charging pump.
- 1
in the first case, we understand that you are obtaining additional information regarding the
level of detail used in the review that resulted in your corisidering your vendor technical
manuals as design documents, in the second case, we will be reviewing the
j
1
/
/
9703130152 970310
ADOCK 05000482
&Q&Q,Q
G
__
_
.
.
Wolf Creek Nuclear Operating
2-
Corporation
j
circumstances that may have created the potential for inadequate cold overpressure
mitigation during a plant cooldown. These issues are discussed in Sections E1.1 and
'
E1.2 of the enclosed inspection report.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosures, and your response will be placed in the NRC Public Document Room (PDR).
To the extent possible, your response should not include any personal privacy, proprietary,
or safeguards information so that it can be placed in the PDR without redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
,
0
i
L
.
'
A
l
Arthur T. Howell lil, Acting Director
p
Division of Reactor Projects
Docket No.: 50-482
License No.: NPF-42
Enclosures:
2. NRC Inspection Report
50-482/97-04
cc w/ enclosures:
Chief Operating Officer
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
Burlington, Kansas 66839
Jay Silberg, Esq.
Shaw, Pittman, Potts & Trowbridge
2300 N Street, NW
Washington, D.C. 20037
Supervisor Licensing
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
Burlington, Kansas 66839
.
Wolf Creek Nuclear Operating
-3-
Corporation
. Chief Engineer
Utilities Division
Kansas Corporation Commission
1500 SW Arrowhead Rd.
Topeka, Kansas 66604-4027
. Office of the Governor
State of Kansas
Topeka, Kansas 66612
' Attorney General
Judicial Center
301 S.W.10th
2nd Floor
Topeka, Kansas 66612-1597
County Clerk
Coffey County Courthouse
Burlington, Kansas 66839-1798
j
,
Public Health Physicist
Division of Environment
Kansas Department of Health
and Environment
Bureau of Air & Radiation
Forbes Field Building 283
Topeka, Kansas 66620
Mr. Frank Moussa
Division of Emergency Preparedness
2800 SW Topeka Blvd
Topeka, Kansas 66611-1287
1
. . -
- - - . - --
- . .
.
. - - _ - . _ . _ -
-.
. - - .
. . . . _ . .
-
. . .
. . . -
1
-
'
.
i
,
Wolf Creek Nuclear Operating
-4-
MAR I O 1997
Corporation
i
.
.
1
E Mail report to T. Boyce (THB)
'
E-Mail report to NRR Event Tracking Oystem (IPAS)
E-Mail report to Document Control Desk (DOCUESK)
1
E-Mail report to Richard Correia (RPC)
.,
E-Mail report to Don Taylor (DRT)
bec to DCD (IE01)
,
4
bec distrib, by RIV:
)
Regional Administrator
Resident inspector (3)
DRP Director
SRI (Callaway, RIV)
Branch Chief (DRP/B)
DRS-PSB
'
Project Engineer (DRP/B)
MIS System
1
Branch Chief (DRP/TSS)
RIV File
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
a
i
f
DOCUMENT.NAME: R:\\_WC\\WC704RP.JFR
To receive copy of docurnent, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
SRI:RIV
C:DRP/B
AD:p
l
l
JFRingwald:sa, @
WDJohnsorp ATO6welig
_
02/27/97
}QAU 03/p,/97 p
03/g/97
OFFICIAL RECORD COPY
l
r
-
-
_- -
.
.
Wolf Creek Nuclear Operating
-4-
MAR I 01997
Corporation
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Don Taylor (DRT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector (3)
DRP Director
SRI (Callaway, RIV)
Branch Chief (DRP/B)
DRS-PSB
Project Engineer (DRP/B)
MIS System
Branch Chief (DRP/TSS)
RIV File
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
4
l
l
l
I
DOCUMENT NAME: R:\\_WC\\WC704RP.JFR
To receive copy of document, indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N" = No copy
SRI:RIV
l
C:DRP/B
AD:[tipp
l
l
JFRingwald:sa, p
WDJohnsong AT$%velig
'
02/27/97
FLA" 03/r /97 9
03/ts/97
'
OFFICIAL RECORD COPY
/
p