Forwards Insp Rept 50-482/97-04 on 970111-0222 & NOV
ML20136E238
Person / Time
Site: Wolf Creek 
Issue date: 03/10/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20136E243 List:
References
NUDOCS 9703130152
Download: ML20136E238 (5)


See also: IR 05000482/1997004

Text

_.

. - - .

. . . _ .

- . _ _ . . - . . .

m__.

- .

.,

[g""8%k

NUCLEAR REGULATORY COMMISSION

UNITED STATES

'

REoloN IV

,.

,

3'.,*/f

511 RYAN PLAZA DRIVE, SulTE 400

%9

AR LINGToN, TEXAS 760118064

MAR I 01997

Otto' L. Maynard, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, Kansas 66839

SUBJECT: NRC INSPECTION REPORT 50-482/97-04 AND NOTICE OF VIOLATION

Dear Mr. Maynard:

An NRC inspection was conducted January 11 through February.22,1997, at your Wolf

Creek Generating Station reactor facility. The enclosed report presents the scope and

results of that inspection.

During this inspection, five violations were identified in tne engineering, maintenance,

operations, and plant support areas. Violation A is of concern because it is an example

where your corrective action evaluation was not sufficiently broad to identify this issue

during your preparation of Licensee Event Report 50-482/96 10. Violations B, C, and D

are of concern because they demonstrate continued problems in controlling activities

-

associated with the turbine-driven auxiliary feedwater pump. While the plant staff

identified some of the examples of these violations, and others were self-revealing,

enforcement discretion is not considered appropriate for these violations because of the

number of significant problems that you have had with the turbine-driven auxiliary

feedwater pump during the past year. After reviewing your responses to these three

violations, we will consider whether a management meeting is needed to further discuss

the continuing problems with activities associated with the turbine-driver auxiliary

l

feedwater pump. Violation E is of concern because you inadvertently reduced your

emergency planning effectiveness, and your corrective actions were not prompt in that the

shif t supervisor was not informed of the error in the emergency action levels for 7 days.

These violations are cited in the enclosed Notice of Violation (Notice), and the

circumstances surrounding the violations are described in detail in the enclosed report.

Please note that you are required to respond to this letter and should follow the

instructions specified in the enclosed Notice when preparing your response. The NRC will

use your response, in part, to determine whether further enforcement action is necessary

to ensure compliance with regulatory requirements.

Two unresolved items were identified concerning your use of vendor technical manuals and

cold overpressure mitigation associated with the installation of your normal charging pump.

- 1

in the first case, we understand that you are obtaining additional information regarding the

level of detail used in the review that resulted in your corisidering your vendor technical

manuals as design documents, in the second case, we will be reviewing the

j

1

/

/

9703130152 970310

PDR

ADOCK 05000482

&Q&Q,Q

G

PDR

__

_

.

.

Wolf Creek Nuclear Operating

2-

Corporation

j

circumstances that may have created the potential for inadequate cold overpressure

mitigation during a plant cooldown. These issues are discussed in Sections E1.1 and

'

E1.2 of the enclosed inspection report.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosures, and your response will be placed in the NRC Public Document Room (PDR).

To the extent possible, your response should not include any personal privacy, proprietary,

or safeguards information so that it can be placed in the PDR without redaction.

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

,

0

i

L

.

'

A

l

Arthur T. Howell lil, Acting Director

p

Division of Reactor Projects

Docket No.: 50-482

License No.: NPF-42

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-482/97-04

cc w/ enclosures:

Chief Operating Officer

Wolf Creek Nuclear Operating Corp.

P.O. Box 411

Burlington, Kansas 66839

Jay Silberg, Esq.

Shaw, Pittman, Potts & Trowbridge

2300 N Street, NW

Washington, D.C. 20037

Supervisor Licensing

Wolf Creek Nuclear Operating Corp.

P.O. Box 411

Burlington, Kansas 66839

.

Wolf Creek Nuclear Operating

-3-

Corporation

. Chief Engineer

Utilities Division

Kansas Corporation Commission

1500 SW Arrowhead Rd.

Topeka, Kansas 66604-4027

. Office of the Governor

State of Kansas

Topeka, Kansas 66612

' Attorney General

Judicial Center

301 S.W.10th

2nd Floor

Topeka, Kansas 66612-1597

County Clerk

Coffey County Courthouse

Burlington, Kansas 66839-1798

j

,

Public Health Physicist

Division of Environment

Kansas Department of Health

and Environment

Bureau of Air & Radiation

Forbes Field Building 283

Topeka, Kansas 66620

Mr. Frank Moussa

Division of Emergency Preparedness

2800 SW Topeka Blvd

Topeka, Kansas 66611-1287

1

. . -

- - - . - --

- . .

.

. - - _ - . _ . _ -

-.

. - - .

. . . . _ . .

-

. . .

. . . -

1

-

'

.

i

,

Wolf Creek Nuclear Operating

-4-

MAR I O 1997

Corporation

i

.

.

1

E Mail report to T. Boyce (THB)

'

E-Mail report to NRR Event Tracking Oystem (IPAS)

E-Mail report to Document Control Desk (DOCUESK)

1

E-Mail report to Richard Correia (RPC)

.,

E-Mail report to Don Taylor (DRT)

bec to DCD (IE01)

,

4

bec distrib, by RIV:

)

Regional Administrator

Resident inspector (3)

DRP Director

SRI (Callaway, RIV)

Branch Chief (DRP/B)

DRS-PSB

'

Project Engineer (DRP/B)

MIS System

1

Branch Chief (DRP/TSS)

RIV File

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

a

i

f

DOCUMENT.NAME: R:\\_WC\\WC704RP.JFR

To receive copy of docurnent, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

SRI:RIV

C:DRP/B

AD:p

l

l

JFRingwald:sa, @

WDJohnsorp ATO6welig

_

02/27/97

}QAU 03/p,/97 p

03/g/97

OFFICIAL RECORD COPY

l

r

-

-

_- -

.

.

Wolf Creek Nuclear Operating

-4-

MAR I 01997

Corporation

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Don Taylor (DRT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector (3)

DRP Director

SRI (Callaway, RIV)

Branch Chief (DRP/B)

DRS-PSB

Project Engineer (DRP/B)

MIS System

Branch Chief (DRP/TSS)

RIV File

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

4

l

l

l

I

DOCUMENT NAME: R:\\_WC\\WC704RP.JFR

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures "N" = No copy

SRI:RIV

l

C:DRP/B

AD:[tipp

l

l

JFRingwald:sa, p

WDJohnsong AT$%velig

'

02/27/97

FLA" 03/r /97 9

03/ts/97

'

OFFICIAL RECORD COPY

/

p