Forwards Insp Repts 50-295/97-04 & 50-304/97-04 on 970203- 07.No Violations Noted
ML20136E004
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 03/06/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mueller J
COMMONWEALTH EDISON CO.
Shared Package
ML20136E009 List:
References
NUDOCS 9703130085
Download: ML20136E004 (2)


See also: IR 05000295/1997004

Text

- . . . _ . .. . . .- . - - .- -. _

.

9

4 *

l

March 6, 1997 l

Mr. J. H. Mueller

Site Vice President

Zion Generating Station

i Commonwealth Edison Company

j 101 Shiloh Boulevard

1 Zion, IL 60099

SUBJECT

NRC INSPECTION REPORTS NO. 50-295/97004(DRS); 50-304/97004(DRS)

Dear Mr. Mueller:

.

On February 7, 1997, the NRC completed an inspection at your Zion Units 1 and

2 reactor facilities. The enclosed report presents the results of that (

'

inspection.

!

During the one week inspection )eriod, we found your safeguards program to be

,

satisfactory to protect public lealth and safety. We noted that security

4

officer and access control inspector personnel shortages were sliminated and

! that overtime was significantly reduced. We are concerned, however that a

drill conducted by your security training staff identified an appare,nt

programmatic weakness in the quality of searches conducted by warehouse i

j

personnel prior to packages being permitted into the Protected Area.

l

j No violations of NRC requirements were identified during this inspection.

4

'

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(2). This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21. Consequently, our report of

this inspection will not be placed in the NRC Public Document Room.

l

.

I

\

l

,

i

Enclouuro Cor>ts

la

controlled

. S.ERN,5)

9703130085 970306

gDR ADOCK 05000295

PDR -

- - _ _ _ __

.

ON

J. H. Mueller -2- fiarch 6,1997

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/s/ M. Leach (for)

Geoffrey E. Grant, Director

Division of Reactor Safety

Docket Hos. 50-295; 50-304

Licenses No. DPR-39; DPR-48

Enclosure: Inspection Reports 50-295/97004(DRS); 50-304/97004(DRS)

(SAFEGUARDS INFORMATION)

cc w/ encl: T. J. Maiman, Senior Vice President,

Nuclear Operations Division

D. A. Sager, Vice President, Generation Support

H. W. Keiser, Chief Nuclear Operating Officer

G. K. Schwartz, Station Manager

W. Stone, Regulatory Assurance Supervisor

I. Johnson, Acting Nuclear Regulatory Services Manager

NRR/DRIS/RSGB9D

NMSS/HIGDON/4E4

cc w/ encl w/o

SAFEGUARDS INFORMATION: Document Control Desk - Licensing

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attorney General

Mayor, City of Zion

State Liaison Officer, Wisconsin

State liaison Officer

Chairman, Illinois Commerce Commission

Distribution:

Docket File w/o encl SRIs, Zion, Braidwood DRP w/o encl

PUBLIC IE-04 w/o enti Byron w/o encl

OC/LFDCB w/o enci DRS w/o enci

LPM, NRR w/o encl TSS w/o encl

G. E. Grant, RIII w/o enc 1 CAA1 w/o encl

A. B. Beach, RIII w/o encl RIII PRR w/o encl

R. A. Capra, NRR w/o encl

W. L. Axelson, RIII w/o encl Enf. Coordinator, RIII w/o encl

DOCUMENT NAME: A:ZIO96018.DRS

receive a copy of this document, buseate in the box:

"C' = Copy without 2+tachment/ enclosure "E' s Copy with attachment / enclosure

0FFICE RIII w RIII , RIII N RIII W

JBelaher:jp

,

NAME

JCreed & M M0apas DM/-ov- MLeach/GGran W

DATE 02/sh/97 02/2 4 /97 / 02/ n /97 02,/oc /97

0FFICIAL REC 0k0 COPY

Enclosure con

'

4e Is Decontrollod

- - - _ _ _ _