Forwards Case Study Rept AEOD/C503, DHR Removal Problems at Us Pwrs. Rept Makes Several Recommendations Based Upon Potential Safety Significance of loss-of-DHR Events
ML20136D883
Person / Time
Issue date: 12/23/1985
From: Heltemes C
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Pate Z
INSTITUTE OF NUCLEAR POWER OPERATIONS
Shared Package
ML20136D889 List:
References
REF-GTECI-A-45, REF-GTECI-DC, TASK-A-45, TASK-OR NUDOCS 8601060310
Download: ML20136D883 (4)


Text

~. -

nec a 3 mm Dr. Zack.Pate, President

~ Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339

Dear Dr. Pate:

SUBJECT:

CASE STUDY REPORT -- DECAY HEAT REMOVAL PROBLEMS AT U.S. PRESSURIZED WATER REACTORS Following resolution of peer review comments, we have completed the enclosed case stu: y report on decay heat removal problems at U.S. pressurized water reactors. 'Between 1976 and 1983, 130 loss-of-DHR events were reported to have

. occurred during approximately 500 reactor years of operation. Total loss of

.:the DHR systems under certain conditions could lead to core uncovery, and resultant fuel damage. The results of scoping analyses of total loss-of-DHR scenarios presented in the study indicate that for certain postulated events, unless timely corrective actions are taken, core uncovery could result on the order of one to three hours.- To date, no serious damage has resulted from the loss-of-DHR system events that have occurred at U.S. PWRs. However, many of the events which have occurred thus far may serve as important precursors to morelseriousevents.

AE00's analysis of operating data indicates that the underlying or root causes of most of the loss-of-DHR system events are human factors-deficiencies involving procedural inadequacies and personnel errer. Most of.the errors 3

't'

.were committed.during maintenance, testing and repair operations.

The leading category of loss-of-DHR events (37 of 130) was the ' automatic.

closure of the suction / isolation valves, most of which resulted from human

errogs.
The report makes several recommendations based upon the potential safety significance of loss-of-DHR events.

Implementation of those recommendations

~

?should significantly improve DHR system reliability and availability. The recommendations-include:

improving human factors by upgrading coordination, planning, and administrative control of surveillance, maintenance, and testing operations which are performed during shutdown; providing operator aids to assist in determining time available-for DHR recovery and to assist operators in. trending parameters during loss-of-DHR events; upgrading the training and qualification requirements for operations and maintenance staff; requiring the use of reliable, well-analyzed methods for measuring reactor vessel-level e

during shutdown modes; modifying plant design to remove autoclosure interlocks-and/or power to the DHR suction / isolation valves during periods which do not

[

b L

f[s S N

B601060310 851223 P

EPSIg PDR ORG

Dr. Zack Pate require valve motion; and clarifying plant technical specifications to elimi-nate ambiguities associated with operating mode definitions.

The report acknowledges NRC's ongoing efforts to address shutdown decay heat removal requirements (Unresolved Safety Issue A-45). The AE0D recommenda-tions are applicable to A-45, and should be considered in the resolution of this generic issue.

As you may know, AE0D reports do not represent an official NRC position or the position of the responsible NRC program office. Our reports are one input to an ongoing review and evaluation process, and any recommendation contained in our final report will be considered and perhaps modified or eliminated by the responsible NRC office.

A copy of the case study report and this letter are being placed in the Public Document Room at 1717 H Street, N.W., Washington, D.C. 20555.

If you have any questions regarding this study, please feel free to contact Dr. Hal Ornstein at (301)492-4439.

Sincerely, Original Signed by:

C. J. Holte es, Jr.

C. J. Heltemes, Jr., Director Office for Analysis and Evaluation of Operational Data

Enclosure:

As stated cc w/ enclosure:

See attached Distribution PDR AE0D CF ROAB CF ROAB SF H0rnstein KBlack WLanning TIppolito

}

CHeltemes.

gns KSeyfrit for g,

r o L1c l6 0FC :R

' :DD:ROAB

D:ROA

_____:h__h_____e_pSC: ROB g

TIphg,d

_ _ :..g.,______:

olit

CHe iemes NAME :H0rnstein:jz WLaW DATE :11/F/85
11M /85
1%/1 /85
11fy'}/85 0

0FFICIAL RECOPD COPY t

1

\\

  • Mr. R. Crouse, Chairman Mr. C. McNeill, Jr.

B & W Owners' Group Vice President, Nuclear Toledo Edison Company Public Service Electric & Gas Co.

Edison Plaza P.O. Box 236 300 Madison Avenue Hancocks Bridge, N.J. 08038 i

Toledo, Ohio 43652 Mr. W. Stewart, Vice President Mr. J. Sheppard, Chairman Nuclear Operations Westinghouse Owners' Group Virginia Electric and Power Company Carolina Power and Light Company P.O. Box 26666 336 Fayecteville Street Richmond, Virginia 23261 Raleigh, North Carolina 27602 Mr. J. Dolan, Vice President Mr. R. Wells, Chairman Indiana and Michigan Electric Co.

CE Owners' Group clo American Electric Service Corp.

Northeast Utilities Service Company 1 Riverside Plaza P.O. Box 270 Columbus, Ohio 43215 Hartford, Connecticut 06101 Mr. J. Griffin Mr. R. Borsum Sr. Vice President of '.nergy Supply Babcock & Wilcox Arkansas Power and Light Co.

Nuclear Power Generation Division P.O. Box 551 o

Suite 220 Little Rock, Arkansas 72203 7910 Woodmont Avenue Bethesda, MD 20814 Mr. R. Dieterich, Mgr.

Sacramento Municipal Utility Dist.

Mr. R. Crouse, Vice President 6201 S Street Nuclear P.O. Box 15830 Toledo Edison Company Sacramento, California 95852 Edison Plaza - Stop 712 300 Madison Avenue Mr. K. Baskin, Vice President Toledo, Ohio 43652 Nuclear Engineering Safety and Licensing Department Mr. H. Tucker, Vice President Southern California Edison Co.

Nuclear Production P.O. Box 800 Duke Power Company 2244 Walnut Grove Avenue P.O. Box 33189 Rosemead, California 91770 422 Church Street Charlotte, N.C. 28242 Mr. B. Withers, Vice President Portland General Electric Co.

Mr. W. Wilgus, Vice President 121 S. W. Salmon Street Nuclear Operations Portland, Oregon 97204 Florida Power Corporation P.O. Box 14042; M.A.C. H-2 Mr. L. Ferrar St. Petersburg, Florida 33733 Director of Nuclear Licensing Commonwealth Edison Company Mr. A. Lundvall, Vice President P.O. Box 767 Supply Chicago, Illinois 60690 Baltimore Gas and Electric Company G & E Building Mr. J. Shiffer, Vice President P.O. Box 1475 Nuclear Power Generation Baltimore, Maryland 21203 Pacific Gas and Eiectric Co.

77 Beale Street San Francisco. California 94106

Mr. R. Kober, Vice President Mr. B. Hardocci Electricity and Steam Production.

c/o K. Canady, Mgr.

Rochester Gas and Electric Corporation Nuclear Engineering 89 East Avenue Duke Power Company Rochester, N.Y.14649 P.O. Box 33189 Charlotte, N.C. 28242

.Mr.~ E. Rahe Mr. K. Canady, Mgr.

Nuclear Safety Department Duke Power Company Nuclear Technology Division P.O. Box 33189 Westinghouse Electric Corp.

Charlotte, N.C. 28242 Box 355 Pittsburgh, PA. 15230 Dr. P. McGill, President.

Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095 Mr. R. Colombo Sacramento Municipal Utility District 6201 S Street P.O. Box 15830 Sacramento, California 95852 Mr. G. Bair, Reactor Engineer Trojan Nuclear Plant P.O. Box 439 9*

Ranier, Oregon 97048 Mr. R. F. Saunders Surry Power Station P.O. Box ~315 Surry, Virginia 23883 Mr. W. Smith, Jr., Plant Mgr.

-Indiana & Michigan Electric Co.

Donald C. Cook Nuclear-Plant P.O. Box 458 Bridgman, Michigan 49106 Mr. J. Enos, Manager Licensing--

Arkansas Power and Light Co.

P.O. Box 551-Little Rock, Arkansas 72203 Mr. D. Lomax, Plant Licensing Supervisor-Arkansas Power and Light Co.

P.O. Box 551 Little Rock, Arkansas 72203