MONTHYEARML20195E9011998-11-0404 November 1998 Comment Supporting Proposed Rule Re Reporting Requirements in 10CFR72.Concurs with NRC Conclusion That Test Rept & Subsequent Holding Period,Unnecessary ML20195B3551998-11-0303 November 1998 Comment on Proposed Rules 10CFR50 & 140 Re Financial Requirements for Permanently Shutdown Nuclear Power Reactors ML20198Q4531998-01-13013 January 1998 Comment Supporting Proposed Rules 10CFR50 & 140 Re Financial Protection Requirements for Permanently Shutdown Nuclear Power Reactors ML20198Q6311998-01-13013 January 1998 Comment on Proposed Rule 10CFR50 & 70 Re Criticality Accident Requirements. Trojan Staff Recommends Proposed Rule Be Revised to Clarify Applicability for Plants That Received NRC Staff Actions ML20136D5481997-03-0606 March 1997 Order Approving Application Re Planned Merger of Portland General Corp,Parent Holding Company for Portland General Electric,W/Enron Corp ML20134L3401997-01-22022 January 1997 Resolution 96-R-85, Resolution Supporting Merger of Centerior Energy Corp & Ohio Edison Under New Holding Co Called Firstenergy ML20058L5881993-11-19019 November 1993 Exemption from 10CFR50.120 Training Rule Requirements ML20058A6101993-11-17017 November 1993 Exemption from Certain Requirements of 10CFR50.54(w) Which Requires Licensee to Obtain & Maintain Min of $1.06 Billion of Decontamination Insurance Coverage ML20058M7001993-09-30030 September 1993 Exemption from 10CFR73.55 Requirements Re Physical Protection in Nuclear Power Reactors for Plant ML20057D9931993-09-30030 September 1993 Exemption to Portions of 10CFR50.54(q) That Apply to Operating Plants & Sections of 10CFR50.47(b) & 10CFR50 App E.Exemption Will Become Effective When Permanently Defueled Emergency Plan Implemented ML20126H4641992-12-29029 December 1992 Exemption from 10CFR50 App E (IV)(F)(2) to Defer Licensee Conducting Its Annual Emergency Plan Exercise Scheduled for 921215 Until First Quarter of 1993 ML20198D3231992-05-0707 May 1992 Exemption from Requirements of 10CFR50,Appendix J,Section III.d.2.(b)(ii) Re Containment Air Lock Pressure Test ML20246K1221989-07-0505 July 1989 Comment Opposing Proposed Rule 10CFR50, Acceptance of Products Purchased for Use in Nuclear Power Plant Structures,Sys & Components. NRC Guidance on Subj of Procurement Would Be More Appropriate than New Regulations ML20235S5401989-02-24024 February 1989 Comment Opposing Proposed Rules 10CFR50 & 55 Re Educ & Experience Requirements for Senior Reactor Operators & Supervisors at Nuclear Power Plants.Questions Ability of Proposed Rule to Achieve Objective ML20235R6861989-02-21021 February 1989 Comment on Proposed Rule 10CFR50 Re Maint Programs for Nuclear Power Plants.Rule Should Not Be Implemented Until Realistic Determination of Impact of Rule on Industry Has Been Made ML20206M8271988-11-21021 November 1988 Comments on Proposed Rule 10CFR26 Re Fitness for Duty Program.Numarc Recommendation That Proposed 300% Sample Size Excessive & That 100% Annual Sample Size Will Be Sufficient Supported ML20195E8711988-10-31031 October 1988 Comment Supporting Proposed Rule 10CFR20 Re Disposal of Waste Oil by Inceneration.Urges Commission to Finalize Rulemaking in Present Form & Ensure That Limited Capacity of Low Level Waste Disposal Sites Be Used Efficiently ML20155D5391988-10-0303 October 1988 Temporary Exemption from Schedular Requirements of Property Insurance Rule Effective 881004 (10CFR50.54) ML20150A9001988-07-0404 July 1988 Comment Opposing Proposed Rule 10CFR50 Re leak-before-break Technology.Further Use of Subj Technology for ECCS Would Reduce Safety Assurances & Safety Benefits.Experience Shows That pipe-thinning Progresses Faster than Expected ML20150F1391988-07-0202 July 1988 Comment Opposing Proposed Rule 10CFR50 Re Expansion of Applicability of Leak Before Break Technology to Functional & Performance Requirements for ECCS & Environ Qualification ML20150A9051988-06-30030 June 1988 Comment Opposing Proposed Rule 10CFR50 Re leak-before-break Technology for safety-related Equipment.Nrc Reliance on leak-before-break Is Irrational Response to Very Real Safety Problem.Nrc Should Implement Mandatory Piping Insp ML20153F6071988-04-29029 April 1988 Application for Amend to Indemnity Agreement B-78.Util Changing Business Name & Merging W/Up&L Merging Corp ML20153F6371988-02-24024 February 1988 Rebuttal Testimony of Jd Tucker Re Application of Pacificorp for Consent to Transfer of Licenses ML20153F7831988-02-24024 February 1988 Rebuttal Testimony of Jh Landon Re Application of Pacificorp for Consent to Transfer of Licenses ML20153F6561988-02-24024 February 1988 Rebuttal Testimony of Dp Steinberg Re Application of Pacificorp for Consent to Transfer of Licenses ML20153F7351988-02-24024 February 1988 Rebuttal Testimony of Vr Topham Re Application of Pacificorp for Consent to Transfer of Licenses ML20153F7001988-02-24024 February 1988 Rebuttal Testimony of OT Colby Re Application of Pacificorp for Consent to Transfer of Licenses ML20153F6681988-02-24024 February 1988 Rebuttal Testimony of RM Boucher Re Application of Pacificorp for Consent to Transfer of Licenses ML20153F6281988-01-0808 January 1988 Testimony of Jh Landon Re Application of Pacificorp for Consent to Transfer of Licences ML20153F6461988-01-0808 January 1988 Prefiled Testimony of Jd Tucker Re Application of Pacificorp to Consent to Transfer of Licenses ML20153F7171988-01-0808 January 1988 Prefiled Testimony of Fd Reed Re Pacificorp for Consent to Transfer of Licenses ML20153F7631988-01-0808 January 1988 Testimony of OT Colby Re Application of Pacificorp for Consent to Transfer of Licenses ML20153F9761988-01-0808 January 1988 Prefiled Testimony of Dp Steinberg Re Application of Pacificorp for Consent to Transfer of Licenses ML20153F6821988-01-0808 January 1988 Testimony of RM Boucher Re Application of Pacificorp for Consent to Transfer of Licenses ML20236S2891987-11-12012 November 1987 Exemption from Requirements of 10CFR50,App R,Section III.G.2 Re Fire Protection of Safe Shutdown Cables & Equipment Located Inside Containment Bldg ML20212N2471986-11-0303 November 1986 Partially Withheld Petition to Suspend OL Due to Util Failure to Disclose Conditions That Undermine Safety in Case of Seismic Event.Directors Should Issue Order Under 2.206 to Show Cause Why OL Should Not Be Suspended ML20126H5251981-04-0303 April 1981 Notification of New Address for Coalition for Safe Power. Certificate of Svc Encl ML20062J5401980-10-22022 October 1980 Brief in Support of Exceptions to ASLB 800711 Initial Decision & to Aslab 800904 Order.Urges That Decision Be Modified to Include Accelerated Reporting Conditions & That Oral Argument Be Held Re Exceptions.W/Certificate of Svc ML20126D1541980-04-0303 April 1980 Transcript of 800403 Evidentiary Hearing,Phase 2,in Portland,Or.Pp 4,454-4,497 ML20126D0281980-04-0101 April 1980 Transcript of Phase Two Evidentiary Hearing in Portland,Or. Pp 3913-4123 ML20126D2461980-03-22022 March 1980 Response to NRC Third Set of Interrogatories,Phase II of Control Bldg Proceeding.Expresses Concerns Re Effect of Noise in Work Areas & Effect of Vibration on Instruments,Not Mentioned in SER ML20126C0331980-03-11011 March 1980 Transcript of 800311 Hearing in Portland,Or.Pp 3,451-3,590 ML20126A8641979-12-29029 December 1979 Transcript of 791229 Hearing in Portland,Or.Pp 3426-3450 ML20244A6471979-04-17017 April 1979 Licensees' Response to 790402 Request of PA Public Util Commission for Hearing & Petition to Intervene Re 790313 Show Cause Order.Urges NRC to Hold Ruling in Abeyance. Certificate of Svc Encl ML20148J1371978-12-18018 December 1978 Intervenor ST of Or'S Motion for an Extension of Time in Which to File Exceptions to the 781005 Order of Aslb. Motion Granted 781023 ML20147J2331978-12-14014 December 1978 Transcript of Hearing on 781214 in Saleam or in the Matter of Portland Gen Elec.Pp 2883-2996 ML20147J2301978-12-13013 December 1978 Transcript of Hearing on 781213 in the Matter of Portland Gen Elec at Salem,Or.Pp 2739-2882 ML20150E7821978-12-12012 December 1978 Transcript of Hearing on 781212 at Salem,Or.Pp 2574-2738 ML20147E1261978-12-11011 December 1978 Transcript of 781211 Hearing in Salem,Or.Pp 2390-2573 ML20062E0271978-11-20020 November 1978 Proposed Findings Submitted by St of or Per ASLB Request of 781103.Suggested That Scope of the Hearing Should Be Limited & That Control Bldg Sheer Walls Are of Strength to W/Stand Earthquake.Cert of Svc Encl 1998-11-04
[Table view] Category:ORDERS
MONTHYEARML20136D5481997-03-0606 March 1997 Order Approving Application Re Planned Merger of Portland General Corp,Parent Holding Company for Portland General Electric,W/Enron Corp ML20062D3481978-11-0606 November 1978 Cross-examination or Testimony Re Analysis & Review by Licensee Poge of safety-related Matls in Control-Auxiliary- Fuel Bldg Complex Will Be Taken at 781211 Hearing.Nrc Given Time to Reply to Interrogs.Proposed Findings Due 781120 ML20150A6581978-09-21021 September 1978 Order Re Responses to NRC Interrogatories by Coalition for Safe Pwr & Consolidation.Cfsp Must:Respond W/In 14 Days to S1,S2,E1,G1,G2,G3,G8 & All Other Interrogatories;Clarify the Status of Spokesmen.Motion for Reconsideration Is Denied ML20062B3721977-09-15015 September 1977 Order Rescinding ASLB 780808 Memorandum & Order.Spent Fuel Storage Pool Presently Contaminated & Affects Installation & Use of New Spent Fuel Storage Racks 1997-03-06
[Table view] |
Text
-
f 1 7590-01 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
PORTLAND GENERAL ELECTRIC COMPANY ) Docket No. 50-344
)
(Trojan Nuclear Plant) )
)
ORDER APPROVING APPLICATION REGARDING THE PLANNED MERGER OF PORTLAND GENERAL CORPORATION, THE PARENT HOLDING COMPANY FOR PORTLAND GENERAL ELECTRIC, WITH ENRON CORPORATION l
I. l Portland General Electric Company (PGE or the licensee) owns a i
67.5-percent interest in the Trojan Nuclear Plant (TNP) located on the west i bank of the Columbia River in Columbia County, Oregon. PGE holds Facility Operating License No. NPF-1 issued by the U.S. Nuclear Regulatory Commission (NRC) pursuant to Part 50 of Title 10 of the Code of Federal Regulations (10 CFR Part 50) on November 21, 1975. Under this license, PGE has the authority to possess and maintain but not operate TNP. PGE is currently a wholly owned subsidiary of Portland General Corporation (PGC).
II.
By letter dated August 20, 1996, as supplemented by letters dated October 16, 1996, and October 30, 1996, PGE informed the Commission that PGE's parent company, PGC, has agreed to a merger with Enron Corporation (Enron), subject to certain conditions. Those conditions include approval by i
9703120400 970306 4 FDR ADOCK 05000344 W PDR
.e , -
4 , - --. .
1 e 9
I the shareholders of the companies and obtaining appropriate governmental i
approvals which do not impose terms or conditions that would be reasonably l 1
likely to have an adverse effect on PGE or Enron.
1 In.the August 20, 1996, submittal, as supplemented by letters dated i October 16, 1996, and October 30, 1996, PGE requested the Commission's consent
- l to the planned merger to the extent necessary under Sections 81, 101, and 184
- of the Atomic Energy Act, and under 10 CFR 50.80 and 10 CFR 30.34. Notice of this application was published in the Federal Register on January 16, 1997 '
i j (62 FR 2399). Under the agreement and plan of merger, the businesses of Enron
- and PGC would be combined by means of the reincorporation of Enron as an
- Oregon corporation through the merger of Enron with and into a wholly owned
! Enron subsidiary (hereinafter referred to as the " Merger Company"), and the i
j merger of PGC into the Merger Company. The shareholders of Enron will become shareholders of the Merger Company, and likewise the shareholders of PGC will
- become shareholders of the Merger Company on a one-for-one basis. The Merger Company will be known as Enren. PGE will continue to be headquartered in i Portland, Oregon and senior management will remain in place. The merger will I,9t affect PGE's status as a regulated public utility in the State of Oregon.
i After the merger, PGE will continue to be the NRC licensee for TNP and no direct transfer of the operating license or interests in the unit will result from the merger. Direct control of the possession-only license for TNP now held by PGE and its co-owners will remain with PGE and the same co-owners, and j will not be affected by the planned merger. ,
1 I
i
_ . _ _ . . _ _ . . . _ . _ . _ ~ . . _ . _ - _ . . _ . _ _ _ _ . = _ . . ~ _ .- .. - - - _ - -
Under 10 CFR 50.80, no license shall be transferred, directly or indirectly, through transfer of control of the license, unless the Comission shall give its consent in writing. Upon review of the information submitted in the letter of August 20, 1996, and supplemental letters dated October 16, il i
1996, and October 30, 1996, and other information before the Comission, the i
{ NRC staff has determined that the proposed merger will not affect the I
qualifications of PGE as holder of the license, and that the transfer of
! control of the license for TNP, to the extent effected by the merger, is otherwise consistent with applicable provisions of law, regulations, and 1
orders issued by the Comission, subject to the conditions set forth herein. l These findings are supported by a safety evaluation dated March 6,1997.
An Environmental Assessment and Finding of No Significant Impact was published in the FEDERAL REGISTER on March 5, 1997 (62 FR 10094).
III.
Accordingly, pursuant to Sections 161b, 1611, 1610, and 184 of the Atomic Energy Act of 1954, as amended, 42 USC 56 2201(b), 2201(i), 2201(o) and 2234, and 10 CFR 50.80, IT IS HEREBY ORDERED that the Comission approves the application regarding the merger agreement between PGC and Enron subject to the following: (1) PGE shall continue to fund its decomissioning trust funds in accordance with the schedule stated in the licensee's Post-Shutdown Decomissioning Activities Report (PSDAR), and (2) PGE will provide the Director, NRR, with at least 60 days prior notice of a transfer (excluding grants of security interests or liens), from PGE to its parent or to any other affiliated company, of facilities for the production, transmission, or
4 distribution of electric energy having a depreciated book value exceeding 10 percent of PGE's consolidated net utility plant, as recorded on PGE's books of account; provided, however, this condition (2) shall not apply once (a) PGE has completed all major decommissioning activities, as that term is defined in 10 CFR 50.2, or (b) PGE's external decomissioning trust fund has been funded in an amount sufficient to pay PGE's share of site radiological decomissioning costs as estimated in the PSDAR. Any such notice to the 1
Director, NRR, shall be exempt from public disclosure to the extent permitted by the NRC's regulations implementing the Freedom of Information Act. In addition, should the merger between PGC and Enron not be consumated by December 31, 1997, this Order shall become null and void, provided, however, an application and good cause shown, such date may be extended.
This Order is effective upon issuance.
IV.
By April 14, 1997, any person adversely affected by this Order may file a request for a hearing with respect to issuance of the Order. Any person requesting a hearing shall set forth with particularity how that interest is adversely affected by this Order and shall address the criteria set forth in 10 CFR 2.714(d).
If a hearing is to be held, the Comission will issue an order designating the time and place of such hearing.
The issue to be considered at any such hearing shall be whether this Order should be sustained.
1 .
I
- 4 Any request for a hearing must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001,
. Attention: Docketing and Services Branch, or may be delivered to 11555
, Rockville Pike, Rockville, Maryland between 7:45 am and 4:15 pm Federal workdays, by the above date. Copies should be also sent to the Office of the General Counsel and to the Director, Office of Nuclear Reactor Regulation, i
j U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and to J
j Mr. Douglas R. Nichols, Esq., Assistant General Counsel PGE,121 S.W. Salmon i Street, Suite 1300, Portland, Oregon 97204.
l For further details with respect to this Order, see PGE's application dated August 20, 1996, and supplemental letters dated October 16, 1996, and 4
October 30, 1996, which are available for public inspection at the
- Commission's Public Document Room, Gelman Building, 2120 L Street, N.W.,
{ Washington, D.C., and at the TNP local public document room located at the Branford Price Millar Library, Portland State University, Portland, Oregon 97207.
j Dated at Rockville, Maryland, this 6th day of March 1997.
FOR THE NUCLEAR REGULATORY COMMISSION i
a ue . ector Office of Nuclear Reactor Regulation J