ML20136C544
| ML20136C544 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/30/1979 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 3--3-A-3, 3-0-3-A-3, NUDOCS 7909260280 | |
| Download: ML20136C544 (2) | |
Text
-_
~>
~
7 ( & I', t
~
- c. ;
a ed,&
.ie,ngo RE5 "
?fg,/
. f?"" ' " -
. N o ?c U y G p
+
y
-(3li";B pppy g s
I.M...W..O..r.,
)
.s-August 30, 1979
- & R c1EatY 1
e. '
ih:, ~ xh-l c
File:
3 3 -a-3 4 x
y
,,,,aena
- s. Iewd 1
Mr. J. F. O'Reilly : Y~
L umG Director e
'e EM g U.S.
Nucitar Regulatory Comeiselon h
,,., g:
Office of Inspection & Enforcement Jutte 3100 dA 101 Marietta Street. ~
M' 2
Atlants, CA 30303
- 7.. - 'y I
4 Subjects Crystal River Unit 3 Docket No. 50-302-Operating Licenea No. DFR-72 IF.Bulletin 79-14.
l i
Dcor Mr. O'Reillys: -
l l
This letter is to request en exemption from the inspection requireecnte of I
l it Bulletin 79-14 se it applies to the Reactor Building Sprey System ring i
-, headcra at Crystal River Unit 3.
~
S.',
m
~
j 2-In our le t teir of A,usue t.13. -1977, we indicated that we were utilizary the present cutage at CRf 3 to guaract the inoccessible esfety-related systeen J
located inside the contairment in accordance with IE Bulletin 79-14.
As of this date, Florida Power. Corporation hoe cospleted the inspection of four (4) of the nine (9) KB spray rings located in the top of the contatteent g
building.
Rings rnmebered 4.~ 7. 8,' end 9 have been inspected in accordance j
with TTC's Icepection Frogram and the requiremente of IE Eulletin 79-14.
t 1
The detailed inspection of the sprey rings requir'ed three (3) days for each rirg se they are entrenely difficult to reach for inspection due to their j
location in the top of the containment building.
Our post esperience indi-cotes that the inspection of the ressining five (5) errey rinas would re-quire an additional fiftcen (15) days inside contairnent.
i l
riorida Power Corp' oration hereby requeste en amen) tion fron the inspectio'n 1
of the r'essining five (5) apray rings.
This exemption is justified for the ic11owins reasoner
\\
1.
The physical location of the spray ripse see the.extrese working conditions (radiation and high tesperature) inside the contain-ment building at CRf3 requires a lengthy and difficult i
inspection.
p pg j 2.
Ricas numbered 4. 7. O, and 9 have been inspected and inre vera no deviations between the drawings and the as-built" configurs-t, tion of the piping.'
l o.nor., mi.i. 3= n,.;;:e.,sei.o
., o.ea. u. a esiem, no.. wn. eis-es. sis.
_-/
. u..
s ~.-
s, Mr. J. P. O'Reilly
,e
,9;
.c?
Fage,Two
{
m v.
- Aguet 30,1979 '!
.s 3 s "JD the spray system and theref orRiegs 74 and #7'were us Q*
3.
a'
)
nput
.I Visual ins e this inputto the scienic scelysis for 4.
probleme.. pection of the remaining date has been verified.
rinas shows no obviove 5.
The ring supportoLinspected r 6.
Due to the location of the sprepresent 60% or ttw rirs surporte p
motion was recorded and verified dey rings, entcv' eive as-built' inf o piping feb sheets and field weld during construction and 'the tiooce inform us r-of your:f, ata sheets are available.
.j s-oyotene inside the containing Buildtethe inspection activities request written confirlastion of erps is neativa cor'riction.n cs ineccessible oefety rela t
{
codo la our AV5ust 23.1979 roval ofj this request, and the request We also
- letter, i
Yery truly yours, e'
~'
FLORIDA FCVEP, COPJ07AT10N JJ,. o d l
u e AtuD6M Ha n eg o r
- wa r t W. F. Ste
~
Nucione Operations i
NCSenhD3 i
}
s e
e g,
c:.
- .))
O 8
.,,,,t g
- t.,* '
,y
+
1*