ML20136C133
| ML20136C133 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 11/13/1985 |
| From: | Butler W Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20136C137 | List: |
| References | |
| NUDOCS 8511210032 | |
| Download: ML20136C133 (5) | |
Text
.
gerarg k,
UNITED STATES
+"
[
,g NUCLEAR REGULATORY COMMISSION r.
wAsmwaTow. o. c.aossa
\\..... p COMMONWEALTH EDISON COMPANY DOCKET NO. 50-374 LA SALLE COUNTY STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 16 License No. NPF-18 1.
The Nuclear Regulatory Comission (the Comission or the NRC) having found that:
A.
The application for amendment filed by the Comonwealth Edison Company, dated August 28, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Comission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-18 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.16 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
g12go P
a---
w e
-- -*~
- =
--*g-
- - - - - + - -
3.
This' amendment is effective as of the date Unit 1 initiates its first refueling outage.
FOR THE NUCLEAR REGULATORY COMMISSION Original signed my Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing
Enclosure:
Changes to the Technical Specifications Date of Issuance: NOV 13 3 I
i i
f I
h h //
- Previously concurred:
ADj./L g
.LB#2/DL/LA
. LB#2/DL/PM OELD LB#2/DL/BC
- EHylton
- ABournia:lb
-TWoodhead NRButler THI vak 10/24/85~
'10/24/85 10/25/85 10/24/85-l$/'//8 l' Y/
-=m---i..
a
-mm --
ENCLOSURE TO LICENSE AMENOMENT NO.16 FACILITY OPERATING LICENSE NO. NPF-18 DOCKET NO. 50-374 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain a vertical line indicating the area of change.
REMOVE INSERT 3/4 8-1 3/4 8-1 3/4 8-la o
G y
3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES A.C. SOURCES - OPERATING LIMITING CONDITION FOR OPERATION
- 3. 8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERA 8LE:
a.
Two physically independent circuits between the offsite transmission network and the ensite Class IE distribution system, and b.
Separate and independent diesel generators
- 0, lA, 2A and 2B with:
l 1.
For diesel generator 0, lA and 2A:
a)
A separate day fuel tank containing a minimum of 250 gallons of fuel, b)
A separate fuel storage system containing a minimum of 31,000 gallons of fuel.
2.
For diesel generator 28, a separate fuel storage tank / day tank containing a minimum of 29,750 gallons of fuel.
3.
A separate fuel transfer pump.
j APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
With either one offsite circuit or diesel generator 0 or 2A of the a.
above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveil-lance Requirements 4.8.1.1.la. within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and 4.8.1.1.2a.4.,
for one diesel generator at a time, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least two offsite circuits and diesel generators 0 and 2A to OPERA 8LE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
With one offsite circuit and diesel generator 0 or 2A of the above required A.C. electrical power sources inoperable, demonstrate the OPERA 8ILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.la. within I hour, and 4.8.1.1.2a.4., for one diesel generator at a time, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable A.C.
sources to OPERA 8LE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Restore at least two offsite circuits and diesel generators 0 and 2A to OPERA 8LE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
l l
l
- See page 3/4 8-1(a).
l LASALLE - UNIT 2 3/4 8-1 Amendment No.16
~
ELECTRICAL POWER SYSTENS t
LINITING CONDITION FOR OPERATION (Continued) i 5
l l
I "For a 30 day period for each diesel generator 0 and 1A during the Unit 1 first refueling outage, with Unit 1 in operational condition 4 or 5 or defueled, only 3 diesel generators, 28 and 2A, and either 0 or IA are required to satisfy the
]
standby AC onsite power requirements for Unit 2.
Surveillance requirements, 4.8.1.1.la and 4.8.1.1.2a.4 shall be performed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to removal of the 0 or IA diesel generator from service.
During each 30 day period the remaining 3 diesel generators will be verified 1 operable at least once per day (in addition to any testing required by Table 4.8.1.1.2-1).
The control cir-cuit for the unit cross-tie circuit breakers between buses 142Y and 242Y shall be temporarily modified to allow the breakers to be closed with the diesel generator feeding the bus.
In the event these conditions are not met, Unit 2 will be brought to HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and COLD SHUT 00WN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
The provisions of Technical Specification 3.0.4 do not i
apply.
I 1The ters verify as used in this context means to administrative 1y check by examining logs or other information to determine if certain components are out-cf-service for maintenance or other reasons.
It does not mean to perform the surveillance requirements needed to demonstrate the OPERA 8ILITY of the j
components.
l i
l LASALLE - UNIT 2 3/4 8-la Amendment No.16 i
_