Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20216F4891999-09-17017 September 1999 Comment Supporting NEI Comments Re Proposed Rules 50 & 72 Re Certain Reporting Requirements for Nuclear Power Reactors. Expresses Concern Re Proposed Reporting Requirement 10CFR50.73(a)(2)(ii)(c) Re Significantly Degraded Component ML20206A0541999-04-26026 April 1999 Memorandum & Order.* All Petitioners to Intervene Have Withdrawn Their Petition,Proceeding Terminated.With Certificate of Svc.Served on 990426 ML20205S0031999-04-23023 April 1999 Affidavit of JW Yelverton Supporting Proposed License Transfer & Conforming Amends.Util Requests That Designated Documents Be Withheld from Public Disclosure,Per 10CFR2.790 (a)(4) & 10CFR9.17(a)(4) ML20203G7821999-02-16016 February 1999 Petition of Local 369 & 387,Utility Workers Union of America,AFL-CIO for Leave to Intervene & Request Hearing.* Requests That Hearing Be Scheduled on Commission Consideration to Approve Transfer.With Certificate of Svc ML20153C1411998-09-20020 September 1998 Comment on Proposed Rule 10CFR2 & 51 on Subpart M Re Transfer of Operating License ML20100M5251996-03-0101 March 1996 Comment on Proposed Rule 10CFR20 Re Rept Requirements for Unauthorized Use of Licensed Radioactive Matl.Proposed Rule Change Wording Concerning What Conditions Must Be Met to Require Reporting Inexact ML20101B9931996-03-0101 March 1996 Comment Opposing Proposed Rule 10CFR20 Re Reporting Requirements for Unauthorized Use of Licensed Radioactive Matls BECO-95-125, Comment Supporting Pr 10CFR60,72,73 & 75 Re Safeguards for Spent Nuclear Fuel1995-12-14014 December 1995 Comment Supporting Pr 10CFR60,72,73 & 75 Re Safeguards for Spent Nuclear Fuel ML20093B5971995-10-0303 October 1995 Comment on Proposed Bulletin 95-XX & Reg Guide DG-1038, Debris Clogging of BWR ECCS Suction Strainers. Endorses BWROG Comments ML20086A8791995-06-14014 June 1995 Comment Supporting Proposed Rule 10CFR73 Re NRC Initiative to Eliminate Requirement to Post Security at Primary Containment Entrance During Refueling & Major Maint Periods ML20082Q5511995-04-21021 April 1995 Comment on Proposed Rules 10CFR170 & 171 Re Fee Schedules for FY95 Revisions.Endorses NEI Comments ML20082M3251995-04-14014 April 1995 Comment Supporting Proposed Draft Policy Statement Re Freedom of Employees in Nuclear Industry to Raise Concerns W/O Fear of Retaliation ML20078L2151995-02-0303 February 1995 Comment Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operations for Nuclear Power Reactors ML20078S6631994-12-19019 December 1994 Comment Supporting Proposed GL Re Reconsideration of NPP Security Requirements for an Internal Threat ML20076L2561994-10-24024 October 1994 Comments on Proposed Rule 10CFR2 Re Reexamination of NRC Enforcement Policy.Endorses Response Submitted by Nuclear Energy Institute ML20062M4241994-01-0303 January 1994 Comment Supporting NUMARC Position on Proposed Rule Re Protection Against Malevolent Use of Vehicles at NPPs ML20059C3721993-12-29029 December 1993 Exemption from DAC Values for Kr-89 & Xe-137 in Table 1 of App a to 10CFR20.Approves Use of Proposed Values in Request When Determining Whether Area Requires Posting as Airborne Radioactivity Area BECO-93-166, Comment Supporting NUMARC Petition for Rulemaking to Amend 10CFR21,PRM 21-21993-12-28028 December 1993 Comment Supporting NUMARC Petition for Rulemaking to Amend 10CFR21,PRM 21-2 ML20058P1811993-12-14014 December 1993 Director'S Decision 93-20 Denying Petition to Delaying Startup Until Hardware Modifications Designed to Eliminate Errors in Reactor water-level Measurement Made ML20058D6561993-11-19019 November 1993 Director'S Decision Under 10CFR2.206 Denying Petition Requesting That NRC Reconsider 910730 Decision Giving Unanimous Approval of Task Force Recommendation Re Reasonable Assurance Finding Re EP for Plant ML20057C1281993-09-13013 September 1993 Memorandum & Order (Termination of Proceeding).* W/Certificate of Svc.Served on 930916 ML20057C0951993-09-13013 September 1993 Memorandum & Order (Termination of Proceeding).* Informs of Petitioner Withdrawal of Motion to Intervene & Request for Hearing,Therefore Board Terminates & Dismisses Proceeding Herein.W/Certificate of Svc.Served on 930914 ML20057A1531993-09-0202 September 1993 NRC Staff Response to Ma Atty General Withdrawal of Motion to Intervene & Request for Hearing.* NRC Does Not Object to Atty General Withdrawal.Licensing Board Should Issue Order Dismissing Proceeding.W/Certificate of Svc ML20056G5081993-08-26026 August 1993 Commonwealth of Ma Atty General Withdrawal of Motion to Intervene & Request for Hearing.* W/Certificate of Svc ML20056E6871993-08-13013 August 1993 Memorandum & Order (Extension of Time).* Petitioner Suppl W/ Contentions Should Be Filed by 930827 & Licensee Response to Suppl Should Be Filed within 10 Days Thereafter.W/ Certificate of Svc.Served on 930813 ML20046D0251993-08-11011 August 1993 Joint Motion to Extend Date for Filing Petitioners Contentions.* Parties Jointly Request That Board Extend Date for Filing Petitioner Contentions from 930813 to 930827. W/Certificate of Svc ML20056C8601993-07-16016 July 1993 Memorandum & Order (Extension of Time).* Petitioner Suppl W/ Contentions Should Be Filed by 930813,util Response to Suppl within 10 Days After Svc & NRC Response to Suppl within 15 Days After Svc.W/Certificate of Svc.Served on 930719 ML20056C8971993-07-15015 July 1993 Joint Motion to Extend Date for Filing Petitioners Contentions.* W/Certificate of Svc ML20045D2201993-06-0808 June 1993 Response of Boston Edison Co to Commonwealth of Ma Atty General Request for Hearing & Petition to Intervene.* Util Will Defer Further Response Until Petitioner Files Suppl Re Specific Contentions.Certificate of Svc Encl ML20045D2271993-06-0808 June 1993 Response of Boston Edison Co to Ma Atty General Request for Hearing & Petition to Intervene.* W/Certificate of Svc & Notices of Appearance ML20045A6721993-05-27027 May 1993 State of Ma Atty General Request for Hearing & Petition to Intervene Re Plant Proposed Amend to License DPR-35 Increasing Allowed Fuel Assembly Storage Cells.* W/Certificate of Svc ML20045A6741993-05-27027 May 1993 Notice of Appearance.* Notice of Appearance of Undersigned for State of Ma Atty General BECO-92-135, Comments on Proposed NRC Generic Communication,Augmented Inservice Insp Requirements for Mark I & Mark II Steel Containments,Refueling Cavities & Associated Drainage Sys1992-12-21021 December 1992 Comments on Proposed NRC Generic Communication,Augmented Inservice Insp Requirements for Mark I & Mark II Steel Containments,Refueling Cavities & Associated Drainage Sys ML20115A6581992-10-0505 October 1992 Comments on Proposed Changes to SALP Program BECO-92-073, Comment Opposing Draft Rev 3 to Reg Guide 01.0091992-07-10010 July 1992 Comment Opposing Draft Rev 3 to Reg Guide 01.009 BECO-92-072, Comment Supporting Proposed Rule 10CFR50 Re Receipt of Byproduct & SNM1992-07-10010 July 1992 Comment Supporting Proposed Rule 10CFR50 Re Receipt of Byproduct & SNM ML20086K8791991-10-31031 October 1991 Petitions Commission to Reconsider 910730 Approval of Task Force Recommendation Stating That NRC Did Not Need to Reconsider NRC Reasonable Assurance Finding Re Emergency Preparedness for Pilgrim Station ML20135A4581991-06-12012 June 1991 Transcript of 910612 Meeting in Plymouth,Ma Re Pilgrim Task Force Public Hearing.Pp 1-148.W/certificate & Title Page BECO-91-067, Comment Opposing Proposed Rules 10CFR71,170 & 171, Rev of Fee Schedules;100% Fee Recovery1991-05-13013 May 1991 Comment Opposing Proposed Rules 10CFR71,170 & 171, Rev of Fee Schedules;100% Fee Recovery ML19332G5121989-12-0101 December 1989 Comment on Draft Reg Guide,Task DG-1001, Maint Programs for Nuclear Power Plants. Util Endorses Nuclear Power Industry Comments & NUMARC Position ML20235A9561988-12-0909 December 1988 Transcript of 881209 Meeting in Rockville,Md W/Public Officials Having Responsibility for Emergency Planning for Pilgrim Nuclear Power Plant.Related Info Encl.Pp 1-185 ML20205E1531988-10-14014 October 1988 Transcript of 881014 Meeting in Rockville,Md Re Discussion/ Possible Vote on Facility Restart.Pp 1-104.Supporting Documentation Encl ML20205J3531988-10-0505 October 1988 Transcript of 881005 Meeting in Rockville,Md Re Status of Readiness for Restart of Facility.Pp 1-94 ML20155D9391988-10-0505 October 1988 Second Interim Director'S Decision DD-88-17 Under 10CFR2.206 Re Request for Proceeding to Modify,Suspend or Revoke Ol.Portion of Petition Re Mgt Issues Denied.Portion Re Emergency Preparedness Issues to Be Addressed Later ML20206G9181988-09-29029 September 1988 Transcript of NRC 880929 Technical Meeting in Plymouth,Ma Re Review of Proposed Restart of Facility & NRC 881005 Meeting W/Util in Rockville,Md Re Readiness of Restart ML20153H0381988-08-26026 August 1988 Transcript of ACRS Ad Hoc Subcommittee on Pilgrim Restart 880826 Meeting in Plymouth,Ma.Pp 1-232.Related Documentation Encl ML20235T8761988-08-25025 August 1988 Rev 0 to Pilgrim Station Evacuation Time Estimates & Traffic Mgt Plan Update.* Apps A,B & M Encl ML20235T7301988-08-15015 August 1988 Rev 4 to Massachussetts Civil Defense Agency Area II Radiological Emergency Response Plan for Pilgrim Nuclear Power Station.* ML20235T6901988-07-28028 July 1988 Rev 5 to City of Taunton Radiological Emergency Response Plan for Pilgrim Nuclear Power Station.* Related Info Encl ML20247N7531988-07-28028 July 1988 Petition for Rulemaking PRM-50-53 Requesting NRC Action to Review Undue Risk Posed by BWR Thermal Hydraulic Instability.Nrr Should Issue Order Requiring All GE BWRs to Be Placed in Cold Shutdown for Stated Reasons 1999-09-17
[Table view] Category:NOTICES
MONTHYEARML20236T1911987-11-13013 November 1987 Receipt of Petition for Director'S Decision Under 10CFR2.206.* Requested Order Barring Plant Restart Not Immediately Necessary Since Plant Shut Down & Will Not Be Restarted W/O NRC Determination of Safety Issues ML20134C8601985-08-13013 August 1985 Notice of Appeal of ASLB 850719 Order Dismissing 850629 Petition for Leave to Intervene.Svc of Process Encl ML20127A0591985-08-0101 August 1985 Notice of Aslab Constitution.As Rosenthal,Chairman & WR Johnson & Gj Edles,Members.Served on 850802 ML20128M4181985-07-18018 July 1985 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20129D3681985-07-12012 July 1985 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20129D3461985-07-12012 July 1985 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20129D3201985-07-12012 July 1985 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20128K1591985-07-0808 July 1985 Notice of ASLB Constitution.Ps Bloch,Chairman & Ga Linenberger & J Harbour,Members.Served on 850709 ML20042A3901982-03-19019 March 1982 Notice of Intent to File Brief by 820331 in Response to NRC & Licensee Responses to 820217 Petition to Intervene. Certificate of Svc Encl ML20010C8401981-08-14014 August 1981 Notice of 810904 Depositions of Rh Cunningham,Rj Merlino & Util Employee W/Described Knowledge.Existence,Methodology & Results of Studies Re 10 & 30-mile Evacuation Radius to Be Addressed.W/Certificate of Svc.Related Correspondence ML20010C8451981-08-14014 August 1981 Notice of 810902 Deposition of Persons Designated by NRC to Have Knowledge of Methodology & Results of Analysis of Accident Consequences & Feasibility of Protective Actions. W/Certificate of Svc.Related Correspondence ML19256E2421979-09-0707 September 1979 Withdrawal of Appearance of Mb Meyer on Behalf of Commonwealth of Ma.Certificate of Svc Encl ML19261D6741979-05-24024 May 1979 Notification of Appearance on Behalf of Ma Governor Ofc of Energy Resources ML19246B7041979-05-23023 May 1979 Notice of Appearance on Behalf of Ma Ofc of Energy Resources ML19269D3361979-04-25025 April 1979 Suspends Indefinitely Deposition of Applicant'S Consultant Scheduled for 790426.Certificate of Svc Encl ML19269D4141979-04-20020 April 1979 Notifies That Deposition Intervenor of Util Personnel Who Prepared Draft Rept Siting Study,Boston Edison Co, Will Be on 790426.Deponents Will Bring Documents Reflecting Changes in Rept Since 790731.Certificate of Svc Encl ML19273B5971979-04-12012 April 1979 Notices of Appearance of Fs Wright & SM Leonard on Behalf of Commonwealth of Ma & Notices of Withdrawal of Appearance of C Cork & J Brant on Behalf of Commonwealth of Ma. Certificate of Svc Encl ML20136B2961979-03-0808 March 1979 Notice of Proposed Imposition of Civil Penalties as Consequence of Insp Rept 50-293/77-31 on 771128-30. Enforcement History Relating to Radiation Protection Encl 1987-11-13
[Table view] Category:OTHER LEGAL DOCUMENT
MONTHYEARML20086K8791991-10-31031 October 1991 Petitions Commission to Reconsider 910730 Approval of Task Force Recommendation Stating That NRC Did Not Need to Reconsider NRC Reasonable Assurance Finding Re Emergency Preparedness for Pilgrim Station ML20235T8761988-08-25025 August 1988 Rev 0 to Pilgrim Station Evacuation Time Estimates & Traffic Mgt Plan Update.* Apps A,B & M Encl ML20235T7301988-08-15015 August 1988 Rev 4 to Massachussetts Civil Defense Agency Area II Radiological Emergency Response Plan for Pilgrim Nuclear Power Station.* ML20235T6901988-07-28028 July 1988 Rev 5 to City of Taunton Radiological Emergency Response Plan for Pilgrim Nuclear Power Station.* Related Info Encl ML20235T9091988-07-11011 July 1988 Draft Rev 5 to Town of Marshfield Radiological Emergency Response Plan for Pilgrim Nuclear Power Station.* Related Documentation Encl ML20235U0861988-07-0303 July 1988 Rev 2 to Offsite Emergency Preparedness Training for Pilgrim Nuclear Power Station Module 12:transportation Lesson Plan 12-1,introduction to Transportation Providers.* ML20235T7481988-03-0909 March 1988 Rev 4 to Town of Bridgewater Radiological Emergency Response Plan for Pilgrim Nuclear Power Station.* Related Info Encl ML20236T1911987-11-13013 November 1987 Receipt of Petition for Director'S Decision Under 10CFR2.206.* Requested Order Barring Plant Restart Not Immediately Necessary Since Plant Shut Down & Will Not Be Restarted W/O NRC Determination of Safety Issues ML20235T8651987-10-30030 October 1987 Draft Rev 6 to Town of Plymouth Radiological Emergency Response Plan for Pilgrim Nuclear Power Station.* ML20134C8601985-08-13013 August 1985 Notice of Appeal of ASLB 850719 Order Dismissing 850629 Petition for Leave to Intervene.Svc of Process Encl ML20127A0591985-08-0101 August 1985 Notice of Aslab Constitution.As Rosenthal,Chairman & WR Johnson & Gj Edles,Members.Served on 850802 ML20128M4181985-07-18018 July 1985 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20129D3201985-07-12012 July 1985 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20129D3461985-07-12012 July 1985 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20129D3681985-07-12012 July 1985 Notice of Appearance in Proceeding.Certificate of Svc Encl ML20128K1591985-07-0808 July 1985 Notice of ASLB Constitution.Ps Bloch,Chairman & Ga Linenberger & J Harbour,Members.Served on 850709 ML20042A3901982-03-19019 March 1982 Notice of Intent to File Brief by 820331 in Response to NRC & Licensee Responses to 820217 Petition to Intervene. Certificate of Svc Encl ML20039B5361981-12-16016 December 1981 Response to ASLB 811210 Order.Lists Preconst Activities Taken at Proposed Site.Certificate of Svc Encl ML20010H2401981-09-14014 September 1981 Confirms That ASLB Need Not Rule on Motion for Protective Order Re Commonwealth of Ma 810814 Notice of Deposition. Applicant Production of Documents Obviates Need for Deposition.Certificate of Svc Encl.Related Correspondence ML20010H2831981-09-14014 September 1981 Conditional Notice of Withdrawal of Listed Portions of 810821 Emergency Planning Contentions.Withdrawal Conditional on Incorporation of Revised Evaucation Study in Psar.W/ Certificate of Svc.Related Correspondence ML20010C8401981-08-14014 August 1981 Notice of 810904 Depositions of Rh Cunningham,Rj Merlino & Util Employee W/Described Knowledge.Existence,Methodology & Results of Studies Re 10 & 30-mile Evacuation Radius to Be Addressed.W/Certificate of Svc.Related Correspondence ML20010C8451981-08-14014 August 1981 Notice of 810902 Deposition of Persons Designated by NRC to Have Knowledge of Methodology & Results of Analysis of Accident Consequences & Feasibility of Protective Actions. W/Certificate of Svc.Related Correspondence ML19256E2421979-09-0707 September 1979 Withdrawal of Appearance of Mb Meyer on Behalf of Commonwealth of Ma.Certificate of Svc Encl ML19246C0431979-06-13013 June 1979 Stipulation Between Commonwealth of Ma & Intervenors Cleetons Adopting Contention on Emergency Planning Issue. Stipulated Contention Is Subj to ASLB Approval ML19261D6741979-05-24024 May 1979 Notification of Appearance on Behalf of Ma Governor Ofc of Energy Resources ML19246B7041979-05-23023 May 1979 Notice of Appearance on Behalf of Ma Ofc of Energy Resources ML19269D3361979-04-25025 April 1979 Suspends Indefinitely Deposition of Applicant'S Consultant Scheduled for 790426.Certificate of Svc Encl ML19269D4141979-04-20020 April 1979 Notifies That Deposition Intervenor of Util Personnel Who Prepared Draft Rept Siting Study,Boston Edison Co, Will Be on 790426.Deponents Will Bring Documents Reflecting Changes in Rept Since 790731.Certificate of Svc Encl ML19273B5971979-04-12012 April 1979 Notices of Appearance of Fs Wright & SM Leonard on Behalf of Commonwealth of Ma & Notices of Withdrawal of Appearance of C Cork & J Brant on Behalf of Commonwealth of Ma. Certificate of Svc Encl ML19263D7421979-04-10010 April 1979 Comments of the Commonwealth of Ma on Draft Suppl to Fes ML20062H1201979-04-0202 April 1979 Forwards Notification of NRC Evaluation of New Info Re Flow Blockage Model for ECCS to Determine Design Conformance ML20136B2961979-03-0808 March 1979 Notice of Proposed Imposition of Civil Penalties as Consequence of Insp Rept 50-293/77-31 on 771128-30. Enforcement History Relating to Radiation Protection Encl ML20126B1631973-07-20020 July 1973 Notifies That on 730712,Friends of Earth Filed Petition Seeking Emergency Derating,To Unspecified Extent,Of Nine Licensed NPPs as Listed 1991-10-31
[Table view] |
See also: IR 05000293/1977031
Text
~ -~
-
--
. . . . _ _ _ . . .
_ . . . . .
. J .'. .., .
(^
.
'
. ,
F .
. .
APPENDIX B pn a s78
f
I
,
.
NOTICE OF PROPOSED IMPOSITION OF CIVIL PENALTIES
l . Docket No. 50-293
! ,
Boston Edison Company .
' This office proposes to impose civil penalties pursuant to Section 234
of the Atomic Energy Act of 1954, as amended, (42 U
for the specific items of noncompliance set forth in Appendix A to the
cover letter. In proposing to impose civil penalties pursuant to this
section of the Act and in fixing the proposed amount of the penalties,
the factors identified in the statements of consideration published in
i
,
the Federal Register with the rule making action which adopted 10 CFR
i
I.
2.205 (36 FR 16894) August 26, 1971, and the " Criteria for Detennining
Enforcement Action" which was sent to NRC licensees on December 31,
l
'
1974, have been taken inM account.
N
Boston Edison Company may, wHhin twenty (20) days of receipt of this
n notice pay the 'vil penalt.as in the cumulative amount of Sixteen
4
Thousand Dollars ($16,000) or may protest the imposition of the civil
Should Boston Edison
j cs
-
penalties in whole or in part by a written answer.
j .- Company fail to answer within tre time specified, this office will issue
an order imposing the civil penalties in the amount proposed above.
l_. -
( Should Boston Edison Company elect to file an answer protesting the
! civil penalties, such an answer may (a) deny the items of noncompliance
j listed in the Notice of Violation in whole or in part, (b) demonstrate
,
j in extenuating circumstances (c) show error in the Notice of Violation, In"
(d) show cther reasons why the penalties should not be imposed.
A, addition to protesting the civil penalties in whole or in part, Anysuch an-
written
'
.
swer may request remission or mitigation of the penalties.
_
answer in accordance with 10 CFR 2.205 should be set forth separately
l from the statement or explanation in reply pursuant to 2.201, but may
- o incorporate by specific reference (e.g., giving page and paragraph
i
O numbers) to avoid repetition.
j
J
Boston Edison Company's attention is directed to the other provisions of
l ,
10 CFR 2.205 regarding, in particular, failure to answer and ensuing
i
orders; answer, consideration by this office, and ensuing orders; requests
!
i
' for hearings, hearings and ensuing orders; compromise; and collection.
.
l Upon failure to pay:any civil penalty due which has b
l the matter may be referred to the Attorney General, and the penalty.
t.nless compromised, remitted, or mitigated, may be collected by civil
l
I dCclon pursuant to Section 234c of the Atomic Energy Act of 1954, as
l
amended.(42USC2282). _
'
'
d7N
l e __
.
!
.
l
t _ ____.__. _ ..........__.
J
! - -
,
, .
,.m,,__~.-.,..,_~.___t-
'
._.,..,r,.___.,I.___-.,_._...,_.-
- _ . _
._
_ _ . .
. :
. .
R (
-
. u..- .
-
.
.
' APPENDIX C
( ** . w. -
-
Boston Edison Company
- Enforcement History Relating to Radiation Protection
5 - 12 - 76 to 11 - 30 - 77
.
License No. DPR-35 Docket No. 50-293
.
MANAGEMENT MEETINGS
Problems Initiatirig Action
Date
Continuing concerns related to the
July 1976 management and implementation of
the Health Physics Program
Continuing concerns related to the
October 1976 management and implementation of
'
D e Health Physics Program
Conti:. Jing concerns related to the
November 1977 mar. .gement and implementation of
to the Health Physics Program
cd
NONCOMPLIANCE ITEMS
Inspection
~
76-12 (Inspection Exposure of 3.127 rems during 2nd calendar
M conducted en May quarter of 1976.
21-26,1976) (Repetitive)
g ,
_
Radiation areas and high radiation areas not posted.
O
Failure to control access to high radiation area.
(Repetitive)
o
-
Failure to follow Radiation Work Pen.11t (RWP) by
contractor personnel.
(Repetitive)
Failure to instruct workers.
76-27 (Inspection Inadequate air sampling program.
.
conducted o.n
September 21-24 and
- 28-30,1976)
No individual on one shift qualified in radiation
protection procedures.
.
' 9
.~
O
e.
- m*** * * ames> g em m e. O m e
e - me. eemoepomme eau me* * e**=mme*****
-
... . . .
'
- .: .~ .-:
.
2.
. Appendix C w.R 8 1978
.
.
Inspection No.
~
Written approval not obtained on four occasions
,
prior to exceeding 1300 mrem / week.
(Repetitive)
'
Individual exceeded 10 CFR 20.101 limits without
having records of his previous occupational exposure.
77-07(Inspection Rooms with radiation levels in excess of 100 mrem / hour
conducted on not controlled at several locations.
March 31, April 4 (Repetitive) -
i and April 6-8,
1977)
77-21 (Inspection Individual received 2.06r rems during third quarter
y
conducted on
of 1977 without having . fonn NRC-4.
August 9-12, 15, (Repetitive)
n 31 and September
en 6,14-16,1977)
- Radiation protection procedures not adhered to in six
instances.
_.
C (Repetitive)
Survey not made to assure compliance with 10 CFR 20.101.
Elf (Repetitive)
N Representative air samples not taken on several
. occasions.
(Repetitive)
, O Posting or barricading not provided at access points
o or areas where radiation levels were greater than
100 mrem /hr but less than 1000 mrem /hr.
'
(Repetitive)
Procedures for personnel radiation protection not
consistent with requirements of Tech Specs.
Change to RWP procedure not reviewed and approved
as required.
Shipping cask with radiation levels as high as
100 mrem /hr not labeled nor were contents identified.
.
. ,
,.
.;
. . . .
... . .. . .
..