ML20136A977
| ML20136A977 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/12/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-33968-WFQ, NUDOCS 8511200100 | |
| Download: ML20136A977 (3) | |
Text
,
Arizona Nuclear Power Project P.O. BOX 52034 e PHOENIX. ARIZONA 85072-2034 Novanber 12,1985 ANPP33968kTQ/JKD Mr. John B. Martin, Regional Administrator Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368
Subject:
Palo Verde Nuclear Gc..erating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528 (License No. NPF-41)/529/530
[
Change to PVNGS FSAR Quality Assurance (QA) Description File: 85-056-026; C.1.01.10
Dear Mr. Martin:
In accordance with 10 CFR 50.55(f), ANPP is submitting a change that affects the QA program for your information.
The change is to FSAR Section 1.8 and the affected FSAR pages are attached.
In discussing compliance with Regulatory Guides 1.38 and 1.123, we clarify our compliance to the personnel qualifications. Personnel performing material inspection shall be qualified to ANSI N45.2.6; personnel performing audits shall be qualified to ANSI N45.2.23; personnel performing monitoring activities shall be qualified to ANSI N45.2.23 or ANSI N45.2.6.
This change will allow the use of either auditing or inspection personnel to perform monitoring activities at vendor's facilities.
In all cases, trained personnel will be used. The change is still within the requirements of 10 CFR Appendix B. A 10CFR50.59 review has been performed for PVNGS Unit 1 concerning this change and it did not identify an unreviewed safety question.
If you should have any questions concerning this matter, please contact Mr. W.
F. Quinn of my staff.
Very truly y is, 8511200100 851112 CQ ALC W
PDR ADOCK 05000528 E. E. Van Brunt, Jr.
P PDR Executive Vice President Project Director EEVB/WFQ/JK0/ds 1 I Attachment t
i
r Mr. John B. Martin Change to PVNGS FSAR Quality Assurance (QA) Description ANPP-33968 WFQ/JK0 Page 2 cc:
R. P. Zimmerman E. A. Licitra M. Ley A. C. Gehr USNRC Document Control Desk, Washington, D.C.
)
i STATE OF ARIZONA )
-) as.
COUNTY OF MARICOPA)
I, Edwin E.
Van Brunt, Jr.,
represent that I an Executive Vice President, Arizona Nuclear Power Project, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full that I have read such document and know its contents, authority to do so, and that to the best of my knowledge and belief, the statements made therein
~
are true.
t g.LLL'~ m L(.[
Edwin E. Van Brunt, Jr.
day of 7,7 # m h i 1985.
Sworn to before me this /%L.
Y]&ud ! Y)2Ld O G I
Notary Public My Commission Expires:
. My Ord:G:: Bo!r:3 April 6,1987
-