Text
,
,1 1
mO j j /+
y-j 6
s a$)
"iGN.'3'JM FO R:
H.
Denton V.
S:tilo R. Mattson FRCM:
sti 9 ei.se is proser sild a DHR system to serve as a 5
'-:Lup to the existing i-em that ould be operative in a ar:xi. ately 15 efays.
I stem would at Sest Se of the sane slity of the c.<isting s-
- nd vould not pr.+clude testage s i..; a f t.
c> : 4 i.., n r.s.-
,,s s with -acFa,ical s.:11 s voul d ha used.
- !r,7 ravi.ad the pr design and sugg,'st that it Se modified to pr:
h a system is 77ssible.
This would r quirc:
.selding of fisnged c pr es s r i z i ng Sci ce.:n s
.ard valve seals
'.a a !- l, a ( i f
- 3..t i t a b.
"-?s s's
.h ;:1. I d i t ' e 5 t o 10 dey s 1 g a r.
s e pr.,s a-J cens of the dest:. s.
?-:::5,r?
5
'. 2 ; s e 1 : -s i t s '., r / -. s - c ".s i
. Nr:
0.
It is
.2 2,.
- ,,: :p'n!sn t' a t cs <. -
.s l
r ssic:2 3 fr: :,.: within a reist it'e t.
2..
'>2:.t
.*en wa censid,:r to te 30 days naxt: u1 1
g phf f 9
59 -
.4s e,
.*.4.=gi..
L.
- . s -
7 9 0718 007.d,
f
3
,?
ENCLOSURE 1 PRO - V RHR DESIGN Timely Bac'.-Up Capability (15 Days)
One more'systus which buys additional time down the road for flow and cooling capability.
Skid concept buys HP advantage in installation and renoval.
CON - W DESIGN Not better and could be worse than existing system R.W.T.
Leakage (Mech, seals on pumps, valves with single packings (?),
and flanged connections) - potentially unacceptable offsite doses.
?5ysically large heat exchanger not needed for heat but for fl ow (ha rd to handle) (won't fit on skid),
l-l l
l-l
4 PRO - NRC ALTERNATIVE Leaktight system with inwerd leakage (wel ded ' connec t i ons ).
Longer term operability S-aller heat Rx with bypass loop could mount on one skid Simpler Installation Greater assurance of QA due to longer lead time Setter monitoring capabilities (l&C)
___?.i - !; R C A L T E.:.NA T I V E L:.,;er ti.me netdod to obtain (punos, valves)gassemble, and
'tbricate (T 20-30 days).
Additional piping (@ 3/4") needed for positive scaling Sooster pump needed to assure leakage in proper direction.
e I
e I
GENERIC CONSIDERATIONS Additional loading on auxiliary building Timely clean-up of auxiliary building Functionability of RHR valves inside containment Tleing into existing lines Seismic Cons ideration 1
9 e
w e,
.IN"LOSURE 2 TIME / DAYS ALL 0b'A % E L EAK RA TE I N GFM TO M E ET APPENDIX 1 PART 20 NN
.05 1.2 15 0.17 5
30 0.63 20 00 5.60 R0 I
1
'l I
I
~
T