Describes Decay Heat Removal Sys Proposed by Westinghouse to Back Up Existing Sys.Backup Sys Can Be Ready in 15 Days
ML20136A907
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/28/1979
From:
Office of Nuclear Reactor Regulation
To: Harold Denton, Mattson R, Stello V
Office of Nuclear Reactor Regulation
References
NUDOCS 7907180072
Download: ML20136A907 (5)


Text

,

,1 1

mO j j /+

y-j 6

s a$)

"iGN.'3'JM FO R:

H.

Denton V.

S:tilo R. Mattson FRCM:

NRR T""m t CAL REVI EW TEAM

sti 9 ei.se is proser sild a DHR system to serve as a 5

'-:Lup to the existing i-em that ould be operative in a ar:xi. ately 15 efays.

I stem would at Sest Se of the sane slity of the c.<isting s-

nd vould not pr.+clude testage s i..; a f t.

c> : 4 i.., n r.s.-

,,s s with -acFa,ical s.:11 s voul d ha used.

!r,7 ravi.ad the pr design and sugg,'st that it Se modified to pr:

h a system is 77ssible.

This would r quirc:

.selding of fisnged c pr es s r i z i ng Sci ce.:n s

.ard valve seals

'.a a !- l, a ( i f

3..t i t a b.

"-?s s's

.h ;:1. I d i t ' e 5 t o 10 dey s 1 g a r.

s e pr.,s a-J cens of the dest:. s.

?-:::5,r?

5

'. 2 ; s e 1 : -s i t s '., r / -. s - c ".s i

. Nr:

0.

It is

.2 2,.

,,: :p'n!sn t' a t cs <. -

.s l

r ssic:2 3 fr: :,.: within a reist it'e t.

2..

'>2:.t

.*en wa censid,:r to te 30 days naxt: u1 1

g phf f 9

59 -

.4s e,

.*.4.=gi..

L.

. s -

7 9 0718 007.d,

f

3

,?

ENCLOSURE 1 PRO - V RHR DESIGN Timely Bac'.-Up Capability (15 Days)

One more'systus which buys additional time down the road for flow and cooling capability.

Skid concept buys HP advantage in installation and renoval.

CON - W DESIGN Not better and could be worse than existing system R.W.T.

Leakage (Mech, seals on pumps, valves with single packings (?),

and flanged connections) - potentially unacceptable offsite doses.

?5ysically large heat exchanger not needed for heat but for fl ow (ha rd to handle) (won't fit on skid),

l-l l

l-l

4 PRO - NRC ALTERNATIVE Leaktight system with inwerd leakage (wel ded ' connec t i ons ).

Longer term operability S-aller heat Rx with bypass loop could mount on one skid Simpler Installation Greater assurance of QA due to longer lead time Setter monitoring capabilities (l&C)

___?.i - !; R C A L T E.:.NA T I V E L:.,;er ti.me netdod to obtain (punos, valves)gassemble, and

'tbricate (T 20-30 days).

Additional piping (@ 3/4") needed for positive scaling Sooster pump needed to assure leakage in proper direction.

e I

e I

GENERIC CONSIDERATIONS Additional loading on auxiliary building Timely clean-up of auxiliary building Functionability of RHR valves inside containment Tleing into existing lines Seismic Cons ideration 1

9 e

w e,

.IN"LOSURE 2 TIME / DAYS ALL 0b'A % E L EAK RA TE I N GFM TO M E ET APPENDIX 1 PART 20 NN

.05 1.2 15 0.17 5

30 0.63 20 00 5.60 R0 I

1

'l I

I

~

T