ENCLOSURE 1 INSTRUMENTATION, CONTROL AND ELECTRICAL SYSTEMS INFORMATION A.
The following information pertaining to the instrumentation, control and electrical systems of TMI-2 is needed at headquarters so we can effectively support the ongoing activities at the site:
1.
Electrical Elementary or Schematic Control Circuit Diagrams (orDrawings). Based on information requests received at headquarters to date diagrams are needed in the following areas at this time:
a) Safety and non-safety related components capable of being supplied from the 4160 V and 480 V emergency buses.
b) Diesel generators and associated 4160 V supply breaker.
c) All the in-feeder and bus-tie breakers in the 4160 V and 480 V emergency buses.
d) All the safety and non-safety related components capable of being supplied from 125/250 V d-c buses, e) Reactor coolant pump breakers. Also, supporting electrical diagrams depicting the pump start permissives and trip signals and auxiliary equipment associated with the reactor i
coolant pumps (e.g., Reactor Pump Cooling System),
f) Condensate pumps, valves and supporting auxiliaries.
g) Condensate booster pumps, valves and supporting auxiliaries h) Circulating water system, pumps, valves and supporting auxiliaries.
- 1) Secondary services river water system pumps, valves and supporting auxiliaries.
j) Condenser vacuum pumps and supporting auxiliaries, k) Feedwater inlet valves to steam generators.
790712073'?--
h
, 1) Steam Generator turbine bypass to condenser valves.
m) Secondary service closed cooling water pumps, valves and supporting auxiliaries.
n) Feedwater heaters and polishing demineralizer bypass vr.lves, o) Pressurizer RC-R2, RC-V1, RC-V2, RC-V3 and RC-137 valves.
p) Condenser make up control valve.
q) Turbine vacuum breaker valve.
r) Turbine reset and trip.
2.
Electrical Equipment List and Sensor / Instrument Lists.
Based on information requests received at headquarters to date, lists are needed in the following areas at this time:
a) Condensate System b) Feedwater System c) Main Steam System d) Decay Heat Removal System 3.
Computer Input /0utput List.
4.
Main Control Room Boards Layout Drawings.
S.
Instrument Loop (Block) Diagrams and Logic Control Diagrams.
Based on information requests received to date diagrams are needed in the following areas at this time:
a) Steam Generator Control b) Pressurizer Control c) Condenser Control d) Decay Heat Removel System 6.
Instrument Specification / Data Sheets.
Based on information requests received to date, information is needed in the following areas at this time:
a) Steam Generator b) Pressurizer c) Condenser d) Decay Heat Removal System
. 7.
Isometric drawings (with dimensions) for the following piping runs:
a) Pressurizer steam space sample line from the steam space to valve CA-V208 b) Pressurizer water space from the pressurizer water space to penetration R538 c) Reactor coolant pump RC-P-1A suction let down tap to valve CA-V6 d) Reactor Coolant Pump RC-P-1A suction to valve MU-V376 e) Discharge of RC-P-2A to Valve MU-V16C f) Discharge of RC-P-1A to Valve MU-V160 g) Core Flood Tanks lA and IB to penetration R546 B.
The following final /as built information pertaining to the instrumentation, control and electrical systems of TMI-2 is needed at headquarters so we i
can effectively support the short and long term activities at the site:
1.
Instrumentation & Controls a) P & I Diagrams b)
Instrument List c)
Instrument Loop Diagrams d) Control Loop Diagrams e) Logic Diagrams f) Sensing Line Diagrams g) Sensor Installation Details (Isometric Drawings) h)
Instrument Data Sheets i)
Instrument D,ata Sheets j) Equipment Locations k) Instrument Cable and Cable Tray Routing j
1)
Instrument cable Penetration Locations and Details i
I
2.
Electrical a) One Line Diagrams b) Relay Diagrams c) Logic Diagrams d) Schematics e) Cable Routing f) Cable Tray Routing g) Electric Penetration Location and Details n; Wire and Cable Specifications
- 1) Electrical Equipment List j) Equipment Locations k) Equipment Data Sheets 3.
Please also provide an index of all drawings.
4 Please provide all drawings in the following form (s), listed in order of preference:
a) Microfiche b) Full Size Reproducible c) Full Size Blue Line
_d
~
STANDARD DISTRIBUTION FOR TEAM PRODUCTS E. G. Case (M.S. P-428)
R. J. Mattson (M.S. P-1102)
V. Stello, Jr. (M.S. 528)
R. S. Boyd (M.S. 268) m eD. F. Ross (M.S. 268) q F. Schroeder (M.S. P-1102)
//
D. G. Eisenhut (M.S. 528)
/
D. F. Bunch /D. M. Crutchfield (M.S. P-433)
A c4- {
M. B. Aycock/F. J. Miraglia, Jr. (M.S. P-433).
L Team A/ Team B Staff S. H. Hanauer (M.S. P-822)
/g a arog' o'.
UNITED STATES 3 ",
NUCLEAR REGULATORY COMMISMON f
'1 h
WASHINGTON, D. C. 20565 s
s, v y April 13, 1979 MEMORANDUM FOR:
V. Stello, Jr., Director, TMI Operations FROM:
G. C. Lainas, Duty Officer, Team A
SUBJECT:
ELECTRICAL, INSTRUMENTATION AND CONTROL INFORMATION NEEDED BY HEADQUARTERS Enclosed is a list of electrical, instrumentation and control sche-matics that would be helpful in providing you with technical support.
Please advise us with copies of what you have or when we can get them.
Y G. C. Lainas, Duty Officer Team A
Enclosure:
As Stated cc:
See attached distribution list
(,
)
1 9 o s ?_. 3 c o 'l l f