ML20135H851

From kanterella
Jump to navigation Jump to search
Accepts 861231 Date for Submittal of Final Analysis for Meeting Requirements of Rev 3 to Mark III Containment Hydrogen Control Owners Group Program Plan.Requests That Commitment Be Documented in FSAR Amend
ML20135H851
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/20/1985
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8509240299
Download: ML20135H851 (3)


Text

'

~

orn o UNITED STATES T ~ ,'n NUCLEAR REGULATORY COMMISSION

{ .I WASHINGTON, D. C. 20555

'*4 , , , , , # SEP 2 01985 Docket No.: 50-440 and 50-441 Mr. Murray R. Edelman, Vice President Nuclear Operations Group The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101

Dear Mr. Edelman:

Subject:

Acceptability of the Schedule for Meeting the Requirements of the Hydrogen Control Rule for Perry Nuclear Power Plant (Units 1and2)

The NRC staff acknowledges receipt of your letter dated June 25, 1985, setting forth your proposed schedule for meeting the requirements of the final rule on hydrogen control, as required by 10 CFR 50.44(3)(c)(vii)(A).

The proposed schedule is based upon the current schedule for completion of all tasks incorporated in the Mark III Containment Hydrogen Control OwnersGroupHCOG)ProgramPlan(Revision 3). As you are aware, the staff is continuing to meet frequently with HCOG toward the completion of this effort. Some adjustments in the intermediate milestones iden-tified in this schedule can reasonably be expected and can be periodically documented in updates of the HCOG Program Plan.

The HCOG Program Plan schedules December 31, 1986, as the date for com-pletion and submittal to the staff all elements of the final analysis required by the rule. This date is acceptable to the staff for com-pletion of the final analysis. In the event that the final analysis 1

8509240299 850920 PDR  !

A ADOCM 05000440 PDR i a

/~

/

[

[

Mr. Murray R. Edelman SEP 2 01985 should provide a basis for the staff to conclude that ertain equipment enhancements are necessary to assure survivability of hydrogen burn events as required by the rule, an additional period of time will be necessary to implement such enhancements and the staff will require the submittal of a proposed schedule for completing such enhancements.

it is requested that your commitment be documented in a future FSAR amend-ment prior to Perry Unit I licensing.

Sincerely, Originn1 nicnod by B. J. Youngblood B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing cc: See next page DISTRIBUTION:

Docket File 4 - JStefano RHouston l NRCPDR 0 ELD JKudrick l LPDR ACRS (16) ANotafrancesco l NSIC EJordan CTinkler I PRC System JPartlow CStahle I

LB#1 R/F BGrimes MRushbrook RBernero l

o

(

I

_. LB4 ]

Ste an :kab BJYujigplood

- ///85 A /)O /85 i

j

.4 F

Mr. Murray R. Edelman Perry Nuclear Power Plant i The Cleveland Electric Units 1 and 2 Illuminating Company cc:

Jay Silberg, Esq. Mr. Larry O. Beck Shaw, Pittman, & Trowbridge The Cleveland Electric 1

1800 M Street, N. W. Illuminating Company i Washington, D. C. 20006 P. O. Box 97 E-210 Perry, Ohio 44081 Donald H. Hauser. Esq.

The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 Resident Inspector's Office U. S. Nuclear Regulatory Comission Parmly at Center Road Perry, Ohio 44081 l Regional Administrator, Region III U. S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn Illinois 60137 Donald T. Ezzone, Esq.

Assistant Prosecuting Attorney

,' 105 Main Street 1

Lake County Administration Center l Painesville, Ohio 44077-Ms. Sue Hiatt

OCRE Interim Representative 8275 Munson Mentor, Ohio 44060

]

Terry J. Lodge, Esq.

618 N. Michigan Street Suite 105 Toledo, Ohio 43624 John G. Cardinal, Esq.

Prosecuting Attorney Ashtabula County Courthouse Jefferson, Ohio 44047 i

i

.!