ML20135G218
| ML20135G218 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/09/1985 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Georgia Power Co, Oglethorpe Power Corp, Municipal Electric Authority of Georgia, City of Dalton, GA |
| Shared Package | |
| ML20135G219 | List: |
| References | |
| TAC 56050, TAC 56051, DPR-57-A-115, NPF-05-A-056 NUDOCS 8509180293 | |
| Download: ML20135G218 (10) | |
Text
_
j
-!,,, ~
UNITED STATES
~
8 NUCLEAR REGULATORY COMMISSION o
-p WASHINGTON, D. C. 20555
%, *... /
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-321 EDWIN 1. HATCH NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.115 License No. DPR-57 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Georgia Power Company, et al.,
(the licensee) dated October 1,1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-57 is hereby amended to read as follows:
8509180293 850909 DR ADOCK O 31
2_
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.115, are hereby incorporaied in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION L
Hwa F. Stolz, Chi erating Reacto = Branch #4 ivision of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: September 9, 1985 1
l
ATTACHMENT TO LICENSE AMENDMENT NO. ll5 FACILITY OPERATING LICENSE NO. DPR-57 DOCKET NO. 50-321 Replace the following pages of the Appendix "B" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain a verticci line indicating the area of change.
Remove Insert i
i 3-1 3-1 l
l
TABLE OF CONTENTS Section Page 1.0 Definitions 1-1 2.0 (Section Deleted) 3.0 Environmental Monitoring - Deleted 3-1 4.0 Special Surveillance and Study Activities 4-1 4.1 Erosion Control Inspection 4-1 4.2 Unusual or Important Events Requirements 4-1 4.3 Exceeding Limits of Other Relevant Permits 4-1 5.0 Administrative Controls 5-1 5.1 Responsibility 5.1.1 General Manager 5-I 5.1.2 Manager-Environmental Affairs 5-1 5.1.3 General Manager-Quality Assurance 5-1 and Radiological Health and Safety 5.2 organization 5-1 5.3 Review and Audit 5-2 5.3.1 Independent Review 5-2 5.3.2 Audit Responsibility 5-3 5.4 State and Federal Permits and Certificates 5-3 5.5 Procedures 5-3 5.5.1 Environmental Programs Description 5-4 Document 5.5.2 Quality Assurance of Program 5-4 Results 5.5.3 Compliance with Procedures 5-4 5.5.4 Changes in Procedures, EPDD, 5-4 and Station Design or Operation 5.5.5 Consistency with Initially 5-6 Approved Programs 5.5.6 NRC Authority to Require Revisions 5-6 1
Amendment No..L W,115
f 2
1 3.0 Environmental Monitoring - Deleted 4
?
4 1
3 1
i i
1 1
t 1
i
,I a
p i
i 1
I 4
i i
1 1
4 1
f 1
i t,
i 4
1;.
i I
t 4
i i
u t
(
3-1 Amendment No. 719,115
[
F b
6 h
t
)
I a
?
4 6
F
_ _ _.._._ _ __ _, _., _ _ _.. _., -... _.... _ _ _ _ - -, ~. - _ _ _ _ _. ~. _ _ _ _. -.. -....
f **%
3[
g UNITED STATES NUCLEAR REGULATORY COMMISSION o
- j WASHINGTON, D. C. 20555
%...../
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA COCKET NO. 50-366 EDWIN I. HATCH NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 56 License No. NPF-5 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Georgia Power Company, et al.,
(the licensee) dated October 1,1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted
~
in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the 4
corrr:on defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-5 is hereby amended to read as follows r
- Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 56, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implementad within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION Jkn. Stolz, Chief 0 rating Reactors anch #4 ivision of Licensing
Attachment:
s Changes to the TechnicalN Specifications
'N Date of Issuance: September.',1985
'A 1
ATTACHMENT TO LICENSE AMENDMENT NO. 56 FACILITY OPERATING LICENSE NO. NPF-5 DOCKET NO. 50-366 Replace the following pages of the Appendix "B" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain a vertical line indicating the area of change.
Remove Insert i
i 3-1 3-1 i
I i
i l
__m________.___,____m.
i o
TABLE OF CONTENTS Section Paae l
1.0 Definitions 1-1 2.0 (Section Deleted) 3.0 Environmental Monitoring - Deleted 3-1 l
4.0 Special Surveillance and Study Activities 4-1 j
4.1 Erosion Control Inspection 4-1 4.2 Unusual or Important Events Requirements 4-1 4.3 Exceeding Limits of Other Relevant Permits 4-1 5.0 Administrative Controls 5-1 5.1 Responsib.'.lity 5.1.1 General Manager 5-1 5.1.2 Manager-Environmental Affairs 5-1 5.1.3 General Manager-Quality Assurance 5-1 and Radiological Health and Safety 5.2 organization 5-1 5.3 Review and Audit 5-2 5.3.1 Independent Review 5-2 5.3.2 Audit Responsibility 5-3 5.4 State and Federal Permits and Certificates 5-3 5.5 Procedures 5-3 5.5.1 Environmental Programs Description 5-4 Document l
5.5.2 Quality Assurance of Program 5-4 Results 5.5.3 Compliance with Procedures 5-4 5.5.4 Changes in Procedures, EPDD, 5-4 and Station Design or Operation 5.5.5 Consistency with Initially 5-6 Approved Programs 5.5.6 NRC Authority to Require Revisions 5-6 L
1 Amendment No. 48. 56
3.0 Environmental Monitoring - Deleted i
i i
I i
i i
i l
i i
i l
i i
I, 341 Amendment No. $8, 56 i
i
!