Proposed ETS Page 3-7,deleting Requirement for Aerial Remote Sensing Employed to Determine Effects of Cooling Tower Drift
ML20098G578
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/01/1984
From:
GEORGIA POWER CO.
To:
Shared Package
ML20098G579 List:
References
TAC-56050, TAC-56051, NUDOCS 8410050166
Download: ML20098G578 (2)


Text

-

~ Gcorgia Power Company 3-333 Piedmont Avenue Attnta, Georgia 30308 Telephone 404 526J020

- Malling Address.

Post Offee Box 4545 Atlanta, Gecrgta 30302 Georgia Power me southern electic system J. T. Beckham, Jv.

vice President and General Manager NED-84-458 Nuclear Generation Director of Nuclear Reactor Regulation

' Attention:. Mr. John F. Stolz, Chief Operating Reactors Branch No. 4

' Division of Licensing U..S. Nuclear Regulatory Cmaission

' Washington, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSEE DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PIANT UNITS 1, 2 DELETION OF AERIAL REMOIE SENSING FB04 ENVIl0tWENTAL TECHNICAL SPECIFICATIONS Gentlemen:

In accordance with the provisions of 10 GR 50.90 as required by 10 CFR 50.59(c) (1), Georgia Power Company (GPC) hereby proposes an menchent to the B9 win ~ I.

Hatch Nuclear Plant Units 1 and 2 Enviromental Technical Specifications (Appendix B to the Operating Licenses) as described in the attachment to this letter.

%is aEplication would mend the Technical Specifications by deleting the requirement for Aerial Rentote Sensing which has been mployed to determine the effects of, cooling tower drift (3.1.2.2.1) fra Appendix B.

% e. monitoring progra has been conducted, starting in 1974, in accordance with section 5.6.1 - of Enviromental hchnical Specifications

. (EIS) and reported in accordance with Section 5.7.1 for at least two years.

his action fulfills the requirments of section 3.1.2.2.1 of the E'IS. ~No distressed or dead ve,. ation due to cooling tower operation has ever been detected during the surveillance progrm. The only dead vegetation occurred in an area where siltation occurred on one-half acre plot at the base of a soil deposition area.

his problem was detected before plant operation started.

In light.of the acceptable cmpletion of this surveillance progre, we ra uest the deletion of this requirement fra the ETS.

We Enviromental Affairs Section of GPC has reviewed this change and determined no adverse safety or enviromental impact.

%e Plant Review Board and the Safety Review Board have reviewed the proposed changes and have determined that they do not constitute an unreviewed safety question.

%ese changes do not increase the probability or consequences of accidents or malfunctions of equipent previously analyzed since' deleting this raluirement from EIS is in recognition that the progra has been completed.

Also, no equipent modification nor design change to equipent is required to impleent these changes nor is plant operation effected. Consequently, these changes do not create new modes of operation' nor potential for new accidents.

These changes do not change the

(

C.

8410050160 841001 i

PDR ADDCK 05000321 P

PDR gl)kM hY ep.3(ato//

o

+

Georgia PowerI Director of Nuclear Reactor. Regulation

~

U. S. Nuclear Regulatory Ocamission October 1, 1984

Page -Two

. margin of L safety as described in the basis for Technical Specifications because this change will simply renove the reluirment for an aerial photography progran that is now complete.

'Itc < preposed anerxtnent constitutes a change to grant relief upon denonstration of ' acceptable operation.

The aerial-photography progran

. requirement was instituted due to the-unknown effect of the deposition of cooling tower drift upon. the environment prior to plant operation.

The

program has been successfully copleted with no adverse environmental impact. 'Iherefore, the results of this change are consistant with Iten (iv)

. of the " Examples of, Junenchents that are Considered Not Likely to Involve

'Significant' Hazards Considerations" listed on page 14,870 of the April 6,

1983,-issue of the Federal Register.

Attachnent' l' is the insertion ' instructions and proposed anendment pages -

for the Environnental Technical Specifications.

Pursuant to the requirements of 10 CER 170, enclosed is an application fee of $150.00.

If

. you have further questions, please contact this office.

Pursuant to the requirenents of 10 CER 50.91, Mr. J. L. Imdbetter of the

-Envirormental-Protection Division of the Georgia Department. of Natural Resources will be sent a ' copy.-of this letter and all applicable

'attachnents.

J. T.. Beckhan, ~ Jr. -statas that he is Vice President of Georgia Power Ccanpany and.is authorized to execute this oath on behalf of Georgia Power Campany, and, that to the best of his' knowledge and belief the facts set forth in this letter are true.

GDRGIA POWER CNPANY By:

f g J. T. Beckham, Jr.

Sworn to and subscribed ore me this 1st day of October,1984.

,jj

- Notary Public, Georgia, State at targe

~g gfff[

My Commission Expires Sept.18,15sS7

" ~ N5Eary Public MJB Ehclosure xc:

.H. C. Nix, Jr.

Senior Resident Inspector J. P. O'Reilly, (NRC-Region II)

J. L.' Iacbetter 9

g;;,,

+

/

w*

V_, -.

,,'s9 m

's; l' g "

i L..

+ l c

r

- ATTACINENT 1 NBC DOGE'IS 50-321, 50-366 1.,

OPERATING LICDEES DPR-57, NPF-5 '

~

~

EIMIN. I. - HA'ICH NUCEAR PIANP UNITS 1, 2 '

AERIAL REMW'E SEbEING

. 'Ihe proposed, change to the Environmental Technical Specifications (Appendix

B.to the Operatirg License); would be incorporated as follows:

Remove Page '

Insert Page

'3-7 3-7

=

k I

C a

y, 4

a N

[O -

t

)

+.,

r s

,?^ -

~

x Y

j f

5h.

+

r 4

I h,

3

+

4 E

Y l

c,

'x.

4

,_E_

p

' k.

e t

4 i

i I

s 4

1 i

+

I 8410050166 841001 i

PDR ADOCK 05000321 i

P PDR i,

d

3 ;o -

.:a :

.. i- :

j g;*,.

vs..

p u;

4

. ~.,*

er i

s n

4

+

.e c.

y',

. _. A

~

a m_

m

~ r i

1

-e i

I y

J

.).'

-x_

c.j .

s

.i'

-f..

t l

h *:.

~

Y' 5 l{

s l i

~

~

,j,,

t s.

u M

a a-1 4

T s

a J-.

~

s 3.2 Radiological Enviromental mnitoring

= Objective LA radiological envircnmental monitoring program shall be conducted in the extent' of any radiological (vicinity of 11NP to' determine the natu re - and l

ichanges in the enviroment attritutable to plant operation.

Specifications c

o Samples ishall be. collected and. analyzed according to Table 3.2-1.

'The.

j locations of these sampling-. stations are described. In Table 3.2-1 and are sPown in Figure 3.2-1. J Appropriate analytical techniques shall be used to achieve the detection capabilities listed in Table 3.2-2.

J 3-7 t +