OPERATING DATA REPORT DOCKET NO. 50-266 c ui DATE September 9, 1985 o
COMPLETED BY C. W. KRAUSE Mr TELEPHONE 414 277 2001 ctn '
OPERATIN6 STATUS '
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1
. NOTES
- 2. REPORTIN6 PERIOD:
AU6UST 1985
- 3. LICENSED THERMAL POWER (MUT): 1518.
- 4. NAMEPLATE RATING (6ROSS MUE):
523.8
- 5. DESI6N ELECTRICAL RATIN6 (NET MUE): 497.
- 4. MAXIMUM DEPENDABLE CAPACITY (6ROSS MUE): 509.
- 7. MAXIMUM DEPENBABLE CAPACITY (NET MUE): 485.
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROU6H 7) SINCE LAST REPORT, GIVE REAS,iS:
NOT APPLICABLE
- 9. POWER LEVEL TO UNICH RESTRICTED, IF ANY (NET MUE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTIN6 PERIOD 744 5,831 129,911
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 738.6 4,045.6 104,544.2
- 13. REACTOR RESERVE SNUTDOWN HOURS 0.0 4.7 634.4
- 14. HOURS 6ENERATOR ON LINE 737.4 3,993.6 101,981.1
- 15. UNIT RESERVE SHUTDOUN HOURS 0.0 1.5 804.0 1
- 16. GROSS THERMAL ENER6Y 6ENERATED (MUH) 1,083,812 5,841,121 138,790,098
- 17. GROSS ELECTRICAL ENER6Y GENERATED (NUH) 372,680 2,006,140 46,651,380
- 18. NET ELECTRICAL ENER6Y 6ENERATED (MUH) 356,442 1,915,952 44,382,100
- 19. UNIT SERVICE FACTOR 99.1 68.5 78.5
- 20. UNIT AVAILABILITY FACTOR 99.1 68.5 79.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 98.8 67.7 69.9
- 22. UNIT CAPACITY FACTOR (USIN6 DER NET) 96.4 66.1 68.7 v.
- 23. UNIT FORCED OUTA6E RATE 0.0 0.2 2.4
[rs
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
_.s9 7
- 25. IF SHUTBOUN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: SEPTEMBER 1, 1985 7
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LElitM DATED SEPTEMBER 22, 1977
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE September 9, 1985 REPORT MONTII August, 1985 COMPLETED BY C.
W.
Krause TELEPIIONE 414/277-2001 m
u me c
v
.h "a
Jit Pe En
- e ou o
m e as PD ce No.
Date g
gg jgy Licensee Event mg o'g Cause and Corrective Action a
p
- s :n e
v.c Report No.
m su To Prevent Recurrence a~
M ymG g
oQ UnitShuthowntoReplaceFailed 4
850831 S
6.6 B
1 N/A IB IXMITF Power Range Detector NE-44.
I 3
4 F: Forced Reason:
Method:
Exhibit G-Instruc-S: Scheduled A-Equipment Failure (explain) 1-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Entry C
Refueling
~
3-Automatic Scram Sheets for LER File D-Regulatory Restriction 4-Other (explain)
E-Operator Training & License Exam F-Administrative 5 Exhibit I-Same AD-28B G-Operational Error (explain)
Source 301-78) 11-Other (explain)
DOCKET NO.
50-266 UNIT NAME Point Beach, Unit 1 DATE September 9, 1985 COMPLETED BY C.
W.
Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH August, 1985 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY
-POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
498 11 450 21 484 2
496 12 488 22 488 3
499 13 502 23 489 4
450 14 495 24 465 5
472 15 495 25 446 6
501 16 501 26 454 7
502 17 501 27 482 8
502 18 501 28 494 9
497 19 496 29 491 10 498 20 451 30 481 31 283 EQR-28a (01-79)
i NARRATIVE SUMMAkY OF OPERATING EXPERIENCE Docket No.
50-266 Unit Name Point Beach, Unit 1 Date September 9, 1985 Completed By C. W.
Krause Telephone 414-277-2001 Unit 1 operated at approximately 498 MWe net throughout the period with one shutdown.
On August'31, 1985 the shutdown commenced to replace a failed power range detector NE-44.
The turbine was taken off line at 5:25 P.M. and the reactor
]
was shut down 70 minutes later..The detector was replaced and the reactor was taken critical at.ll:55 P.M.
The turbine was phased on line early the next day.
The auxiliary building crane = modification is 90% complete.
The auxiliary crane hook w s tested and accepted for service.
Other safety-related maintenance included the replacement of a fuse for lPl4B containment. spray pump controller, overhaul of service water pumps P32A and P32D, replacement of the solenoid in 1-3200C valve operator for.the containment radioactive gas and particulate air monitoring system, and miscellaneous maintenance on the north bank of 3D diesel starting air system.
a 4
t i
4
OPERATING DATA REPORT DOCKET NO. 50-301 DATE September 9, 1985 COMPLETED BY C. W. KRAUSE TELEPHONE 414 277 2001 OPERATIN6 STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2
. NOTES
- 2. REPORTING PERIOD:
AU6UST 1985
- 3. LICENSED THERMAL POWER (MUT): 1518.
- 4. NAMEPLATE RATIN6 (6ROSS MWE):
523.8
- 5. BESI6N ELECTRICAL RATIN6 (NET MUE): 497.
- 4. MAXIMUM DEPENDABLE CAPACITY (6ROSS MWE): 509.
- 7. MAXIMUM BEPENDABLE CAPACITY (NET MWE): 485.
- 8. IF CHAN6ES OCCUR IN CAPACITY RATIN6S (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): HOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5,831 114,696
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,831.0 101,803.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 207.1
- 14. HOURS GENERATOR ON LINE 744.0 5,831.0 100,140.4
- 15. UNIT RESERVE SHUIDOWN HOURS 0.0 0.0 198.1
- 14. 6ROSS THERMAL ENER6Y 6ENERATED (MWH) 1,125,504 8,765,564 140,518,536
- 17. 6ROSS ELECTRICAL ENER6Y 6ENERATED (MUH) 381,360 2,984,050 47,624,190
- 18. NET ELECTRICAL ENER6Y 6ENERATED (MWH) 364,272 2,853,134 45,364,539
- 19. UNIT SERVICE FACTOR 100.0 100.0 87.3
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 87.5
- 21. UNIT CAPACITY FACTOR (USING MPC NET) 101.0 100.9 80.6
- 22. UNIT CAPACITY FACTOR (USING Di: NET) 98.5 98.5 79.6
- 23. UNIT FORCED OUTA6E RATE 0.0 0.0 1.3
- 24. SHUTDOWNS SCHESULED OVER NEXT & MONTHS (TYPE, DATE, AND DURATION OF EACH):
1HHEX Refueling outage scheduled for October 4,1985.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2
^
REPORT MONTil August, 1985 COMPLETED BY C.
W.
Krause TELEPilONE 414/277-2001 u
a u tr o 9
as "a
St Pe en
- e ou o
com PD cm oyy Licensee Event gg g'g Cause and Corrective Action No.
Date g
gg g
,un Report No.
m eo To Prevent Recurrence g
am
.c a-M gmg g
8 F: Forced Reason:
3 Method:
Exhibit G-Instruc-S: _ Scheduled A-Equipment Failure (explain) 1-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Entry C-Refueling 3-Automatic Scram Sheets for LER File D-Regulatory Restriction 4-Other (explain)
E-Operator Training & License Exam F-Administrative 5 Exhibit I-Same AD-28B G-Operational Error (explain)
Source p01-78)
!!- Other (explain)
DOCKET NO.
50-301 UNIT NAME Point Beach, Unit 2 l
DATE September 9, 1985 COMPLETED BY. C.
W.
Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH August, 1985 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL l
DAY MWe NET DAY MWe NET DAY MWe NET 1
491 11 493 21 489 2
490 12 492 22 490 3
489 13 493 23 490 4
488 14 493 24 490 5
492 15 492 25 468 1
6 492 16 492 26 488 l
i 7
493 17 492 27 486 8
498 18 492 28 487 9
490 19 492 29 484 4
10 494-20 490 30 485 l
31 484
?
l 1
EQR-28a (01-79)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE F
Docket No.-
50-301 Unit Name-Point Beach, Unit 2 Date September 9, 1985 Completed By C. W. Krause Telephone 414-2'7-2001 i
Unit'2 operated at approximately 490 MWe net throughout the period with no shutdowns or major -load reductions.
Final evaluations of the June 30, 1985 auxiliary feedwater water hammer have indicated the cause to be a leaking check valve.
SOE 85-001 is being' draf ted to summarize the findings.
The fall refueling' outage scheduled for September 18 has been postponed to October 4, 1985.
The delay'is the result of o
a manufacturer's inability to provide materials necessary to complete the split pin repair on several control rod guide tubes.
T' Safety-related maintenance included the cleaning and adjustment of electrical contacts associated with auxiliary feedwater-valve operator 2-4000.
e i
i i
i I
I e
5
[
Wbsconsin Electnc ma cwmr 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53701 September 9, 1985 VPNPD-85-305 NRC-85-100 Director of Nuclear Regulatory Operations U. S. NUCLEAR REGULATORY COMMISSION Washington, D.
C.
20555 Gentlemen:
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point-Beach Nuclear Plant, for the calendar month of August 1985.
Very truly yours, D
p
}r C. W. Fay Vice President Nuclear Power Attachments Copies to R. S. Cullen, PSCW J.