VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 85-08 FOR THE MONTH OF AUGUST, 1985
?
6
+
OPERATING DATA REPORT Docket No.
50-271 Date 850910 Completed by F.J. Buraer Telephone (802) 257-7711 OPERATING STATUS Notes:
1.
Unit Name:
Vermont Yankee 2.
Reporting Period:
Auaust 3.
Licensed Thermal Power (MWt):
1593 l
4.
NImeplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe):514(oc) 504(cc) 6.
M:ximum Dependable Capacity (Gross MWe):
535 l
7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (Net HWe):
N/A
- 10. Reasons for restrictions, if any:
N/A This month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.00 5831.00
- 12. Number of Hours Reactor was Critical 744.00 5815.97 92629.90
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 5810.55 90240.62 1
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1038467.00 8943232.50 131502242.00
- 17. Gross Electrical Energy Generated (MWH) 334126.00 2970735.00 43760483.00
- 18. Net Electrical Energy Generated (MWH) 311137.00 2818342.00 41519190.00
- 19. Unit Service Factor 100.00 99.65 79.52
- 20. Unit Availability Factor 100.00 99.65 79.52
- 21. Unit Capacity Factor (using MOC Net) 82.98 95.90 72.60
- 22. Unit Capacity Factor (using DER Net) 81.36 94.03 71.18
- 23. Unit Forced Outage Rate 0.00
.35 6.96 i
- 24. Shutdowns scheduled over next 6 months (Tyoe, Date and Duration of Each):
Refuelina outaae scheduled to becin September 21, 1985 and continue to May 3, 1986.
- 25. If shut down at end of report period, estimated date of startup:
N/A
- 26. Units in Test Status (prior to commercial operation): N/A Forecast Achieved Initial Criticality Initial Electricity Commercial Operation u
AVERAGE DAILY UNIT POWER LEVEL Docket No.
50-271 Unit Vermont Yankee Date 850910 Completed by F.J. Burger Telephone (802) 257-7711 MONTH August, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 440 17 418 2
440 18 416 3
439 19 415 4
436 20 409 5
433 21 412 6
431 22 412 7
427 23 412 8
424 24 410 9
425 25 405 10 424 26 404 11 418 27 401 12 424 28 402 13 423 29 404 14 416 30 404 15 413 31 403 16 416 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
w
Dockst No.
50-271 Unit V2rmont Yrnkee UNIT SHUTDOWNS AND POWER REDUCTIONS Date 850910 Completed by F. J. Burger REPORT MONTH August Telephone (802) 257-7711 1
2 3
4 5
No.
Date Typed Duration Reason Method of License System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report #
None l
l P
1 2
3 4
F-Forced A-Equipment Failure (Explain)
Method:
Exhibit G - Instructions
(
S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry i
C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source i
H-Other (Explain)
~ *,
re 1 g
1 N
r 7 O
u 7 I
e B
T 1
e 7
C 5
A 7
k 2
n J. 2 E
- 'r 0 Y F
)
V 5
2 I
t y0 T
n 0 b8 C
o 1
(
E
.om 9 de R
Nr 0 en R
i 5
t o O
tV 8
eh C
s l p kt epe cit ml onaoe DUDCT T
L US E
R NO I
TCNU F
L AM ESUAC EG E
A C
T N
U A
OR N
E E
RB T
OM N
U I
RN A
E M
L D
ET E
A FC L
ON E
A R
EN RE Y
UT T
TN E
AI F
NA A
M S
TN EM P
I e
U n
Q o
E N
Dockst No.
50-271 Unit Virmont Yankee Date 850910 Completed by F.J. Buraer Telephone (802) 257-7711 REPORT MONTH Auaust
SUMMARY
OF OPERATING EXPERIENCES i
Highlights Vermont Yankee operated at 87.6% of rated thermal power for the month.
Gross electrical generation was 334,126 MWH, or 83.1% of design electrical capacity.
l l
Operatina Summarv At the beginning of the reporting period the plant was operating at 91.4% of rated thermal power. The coast down to the 1985 refueling outage was in progress.
i There were no other pertinent items of interest for the month.
At the end of the reporting period the plant was operating at 83.9% of rated thermal power.
I
{
l
l VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR HUNT ROAD VERNON, VERMONT 05354 -
VYV 85-410 September 10, 1985 U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C.
20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of August,1985.
Very truly yours, VERMONT YAtKEE NUCLEAR POWER CORPORATION W
WM Warren P. Murphj/