Text
--
)
e.
~
August 30, 1985 Docket No. 50-461 Illinois Power Company ATIN: Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 Gentlemen:
References:
- 1. Letter, D. P. Hall to J. G. Keppler, U-600197, dated 7/26/85.
- 2. Letter, D. P. Hall to J. G. Keppler, U-600211, dated 8/6/85.
- 3. NRC Inspection Report 50-461/84-37
- 4. Letter, J. G. Keppler to W. C. Gerstner, dated 9/17/84.
This letter is in reply to your letters of July 26 and August 6,1985, requesting termination of the Overinspection Program for reinspection of electrical hangers described in Reference 1, and HVAC ducts and supports described in Reference 2.
We previously discussed termination of the overinspection, or parts thereof, with you in References 3 and 4.
We have completed our review of your request. As discussed with members of your staff by telephone on August 14, 1985, and with Mr. Hall on August 21, 1985, we do not believe that the data and engineering analyses supplied with your requests support your conclusions. Therefore, we do not concur at this time in your request to terminate the Overinspection Program for electrical hangers or in your request to terminate the Overinspection Program for HVAC duct and duct supports. We are unable to concur.in your requests at this time for the following reasons:
1.
Inspection data for electrical hangers and HVAC items does not include the 1985 data; therefore, we cannot determine if any new trends or types of discrepancies have been discovered.
2.
The quantity of items inspected is low. Our understanding of the Over-inspection Program was that Illinois Power would verify the quality of approximately 20% of work performed prior to July 20, 1982. We are unable to determine if the ' sample presented is representative of the entire population.
3.
The rate of items with nonconformance per itco inspected is high; therefore, more information concerning the types of discrepancies discovered and their significance is required.
8509170328 850830 PDR ADOCK 05000461 o
eor p
io
_o v
s.
o Illinois Power Company August 30, 1985 4.
Cable tray and conduit hanger inspection data are not separated and it is unclear if your commitments have been met.
Based on the telephone discussion with Mr. Hall on August 21, 1985, it is our understanding that Illinois Power believes there is adequate bases for termin-ating the overinspection in the requested areas. As stated previously, the NRC believes insufficient data and analysis was supplied with the requests to enable us to reach the same conclusion. Mr. Hall expressed his willingness i
to provide additional information, including 1985 data, to address the NRC's l
concerns.
It is our understanding that while the supplemental information
)
is being prepared, Illinois Power is considering at its risk, the termination of the Overinspection Program in the requested areas. We request that you document this proposal and the basis for the request.
We acknowledge receipt of your request dated August 12, 1985, to terminate the Overinspection Program for cable tray, conduit, cable, and cable tenninations.
l As discussed in our August 21, 1985, telephone conversation, we plan no further review of that submittal at this time. We understand that you will evaluate the submittal in view of the concerns stated above.
In the meanwhile, Region III is continuing to inspect and verify as-built conditions of cable tray and conduit supports as well as HVAC duct and supports.
In addition, a preliminary review of the NCR's in the requested areas has been initiated as part of an inspection concerning the Overinspection Program. This inspection will also review the evaluations of the discrepancies performed by Sargent and Lundy.
(
Thank you for cooperating with us in this matter.
If you have any questions please contact R. F. Warnick at (312-790-5575).
Sincerely, Originel sisacd M' A. Ter:: ravIs James G. Keppler Regional Administator cc: DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Richard Hubbard Gary N. Wright, Manager Nuclear Facility Safety Jean Foy, Prairie Alliance Allen Samelson, Assistant Attorney General, Environmental Control Division H. S. Teylor, Quality Assurance Division i
RIlil RIII RI I RIII RIII RIII RII RI I RI I RIII Jabl'onski/rl W} kmsto eY fia ison nick No y P llo B rson D isKe[p Dilj %
Og ilti [gm he 8/27/85 f
hf 9
/
RII}&/
RIII i Muffett Danielson
)
% me vammanna sur 9,
% % T, --
~
L' s 3/n A Teo/
a j
E'
>=a
=
nn.
hasmen rerensemase p.r consweeuen he as c.r c Immuises pervs.,i.e euen see ese
[D'"""'",-
8aasus e mense =
w asmanns i
ATTACNeo is THE Couecren 24 p Pggg 6F This hdC 4 MEd/1 W h c. o te-q { d A G W a J f & ^.E L. Pocc u C.c R Rec rLy, Bu r: Th a coaeuescac.e co ff uj n 5 ast Ae A su %,e-do one er, l % e A.^oV ThiS bec.4 m ca r.
Th AO V6 oo nor ese mis swn necono y es,,,,,,,,,,,,, %
a= = < e-w i,.e.
.se,.
} uTl+ AAFreenieree-
~ ' *
- roam sa an=. 7-m jr cpo : 1963 0 - 381-529;(317) g,33.#
l l
)
_ _ _ _ _ _ _ _ _. _.. _ _. _..,, _ _, _ _ _ _., _ _ _,, _ _ _ _ _. _ _ _, _ _, _ _ _ _ _ _ _. _ _ _ _, _ _. _ _ _