ML20135E557

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/85-34 & 50-364/85-34 on 850805-09 & Notice of Violation
ML20135E557
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/28/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20135E560 List:
References
NUDOCS 8509160444
Download: ML20135E557 (2)


See also: IR 05000348/1985034

Text

.#

_..

a

. ~ . . . _

m

_

..

&

-

-.._.-..m..

h&ine

m

,

.

AllG 2 81985

.plabamaPowerCompany

/ ATTN:

Mr. R. P. Mcdonald

Senior Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT NOS. 50-348/85-34 AND 50-364/85-34

On August 5 - 9,

1985, NRC inspected activities authorized by NRC Operating

License Nos. NPF-2 and NPF-8 for your Farley facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments. The violations, references to pertinent requirements, and elements to be

included in your response are presented-in the enclosed Notice of Violation.

,

'

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosures

l

will be placed in NRC's Public Document Room.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us,

j

Sincerely,

Roger D. Walker, Director

Division'of Reactor Projects

Enclosures:

1.

Notice of Violation

-2.

Inspection Report Nos. 50-348/85-34

and 50-364/85-34

cc w/encls: -(See page 2)

.,

,

s

-

I

go6

-

--

,

.

. .

_

_ . _ .

_ _

_

__

w

o

.

.

~

Alabama Power Company

2

cc w/encls:

4

0. Whitt, Executive Vice President

. D. Woodard,. Plant Manager

v4f. G. Hairston, III, Manager, Nuclear Engineering

and Technical Support

d W. McGowan, Manager-Safety Audit

and Engineering Review

vff. O. Thrash, Manager, Nuclear Operations

and Administration

wiC G. Ware, Supervisor-Safety Audit

and Engineering Review-

bec w/encls:

vNRC Resident Inspector

i Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

T

1 '

7

4

3

,

RII'

I

RIIV'

RII

II

RII

RII

W

Y

RWe dington:sa

osey

o lins JS

1r

.AJ nson FCantrell DVerrelli

08/ y 85

08/ftd85 08g/85

08

85 08/

85 08/29/85 08/28/85

'

.

08/J.2/85

. -

-.

-.

._ - .