ML20135E557
| ML20135E557 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/28/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20135E560 | List: |
| References | |
| NUDOCS 8509160444 | |
| Download: ML20135E557 (2) | |
See also: IR 05000348/1985034
Text
.#
_..
a
. ~ . . . _
m
_
..
&
-
-.._.-..m..
h&ine
m
,
.
AllG 2 81985
.plabamaPowerCompany
/ ATTN:
Mr. R. P. Mcdonald
Senior Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
SUBJECT: REPORT NOS. 50-348/85-34 AND 50-364/85-34
On August 5 - 9,
1985, NRC inspected activities authorized by NRC Operating
License Nos. NPF-2 and NPF-8 for your Farley facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments. The violations, references to pertinent requirements, and elements to be
included in your response are presented-in the enclosed Notice of Violation.
,
'
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosures
l
will be placed in NRC's Public Document Room.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us,
j
Sincerely,
Roger D. Walker, Director
Division'of Reactor Projects
Enclosures:
1.
-2.
Inspection Report Nos. 50-348/85-34
and 50-364/85-34
cc w/encls: -(See page 2)
.,
,
s
-
I
go6
-
--
,
.
. .
_
_ . _ .
_ _
_
__
w
o
.
.
~
Alabama Power Company
2
cc w/encls:
4
0. Whitt, Executive Vice President
. D. Woodard,. Plant Manager
v4f. G. Hairston, III, Manager, Nuclear Engineering
and Technical Support
d W. McGowan, Manager-Safety Audit
and Engineering Review
vff. O. Thrash, Manager, Nuclear Operations
and Administration
wiC G. Ware, Supervisor-Safety Audit
and Engineering Review-
bec w/encls:
vNRC Resident Inspector
i Reeves, Project Manager, NRR
Document Control Desk
State of Alabama
T
1 '
7
4
3
,
RII'
I
RIIV'
RII
II
RII
RII
W
Y
RWe dington:sa
osey
o lins JS
1r
.AJ nson FCantrell DVerrelli
08/ y 85
08/ftd85 08g/85
08
85 08/
85 08/29/85 08/28/85
'
.
08/J.2/85
. -
-.
-.
._ - .