Text
-
.
.
.
_
.
.-
-
. ..
.
.
-
'
.
SEP 11 GS5
l
Docket No. 50-341
The Detroit Edison Company
ATTN: Dr. Wayne H. Jens
Vice President
l
Nuclear Operations
6400 North Dixie Highway
Newport, MI 48166
Gentlemen:
Enclosed for your review, as discussed at our meeting of July 2,1985, is
the SALP 6 Board Report for Fermi Unit 2, covering the period October 1,
1984 through June 30, 1985. Also enclosed is the Summary Report presented
at the meeting.
During the asse:sment period, your emphasis shifted from construction to
preoperational testing and operational readiness.
Your regulatory performance
at the Fermi station was considered to be acceptable and showed an improving
trend. You were rated Category 1 in three areas (Fueling, Emergency
Preparedness, Preoperational and Startup Testing), Category 2 in nine areas,
and Category 3 in one area. The Category 3 rating was in the area of fire
protection and was primarily based on management's failure to identify
problems and effectuate timely resolution. The performance trend within the
assessment period improved in three areas, remained the same in six areas
and has not declined in any uf the remaining areas trended. A trend could
not be determined in four areas.
Although Plant Operations was rated a Category 2 for the SALP period, recent
events occurring since the close of the assessment period, including the
premature criticality event and others, indicate that Plant Operations has
declined to a Category 3.
The NRC will continue to closely monitor this
apparent downward trend.
We are providing you this report for your review. We would appreciate any
written comments within 30 days of the date of this letter. We will evaluate
your comments, upon receipt, and provide you with our conclusions relative to
1
them. Additionally, you are requested to respond in writing specifically
,
1
addressing corrective actions planned to improve your regulatory performance
in the area of fire protection. This response should include specific actions
j
and dates by which these actions will be completed.
>
<
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the SALP
report will be placed in the NRC's Public Document Room.
.
8509160370 850911
ADOCK 05000341
l
l
G
gqO
!
(
!
'
.-
.
SEP 11 1985
Detroit Edison Company
2
No reply to this letter is required; however, should you have any questions
concerning the SALP Report, we would be pleased to discuss them with you.
Sincerely,
grf g!n:1 SIcmed by
' 3 == G, Kcppler
James G. Keppler
Regional Administratar
Enclosures:
1.
SALP 6 Board Report
No. 50-341/85027
2.
SALP Board Report
No. 50-341/85027
(Summary Report)
cc w/ enclosures:
L. P. Bregni, Licensing
Engineer
P. A. Marquardt, Corporate
Legal Department
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Harry H. Voigt, Esq.
Nuclear Facilities and
Environmental Monitoring
Section
J. M. Taylor, Director, IE
H. R. Denton, Director, NRR
Regional Administrators
RI, RII, RIV, RV
N. J. Palladino, Chairman
J. K. Asselstine, Commissioner
T. M. Roberts, Commissioner
L. W. Zech, Commissioner
NRR Project Manager
H. L. Thompson, NRR
4
J. Axelrad, IE
RIII PRR
RIII SGA
'
State Liaison Officer, State
of Michigan
RIII
RIII
RIII
$IT f)
RIII
RIII
RIII
/f
4
Cfk
/,D/
Jg
8
d
i
171
Pea
n/rh
,4
Wr
MN eg
Dpvis
Keppherse
ct
,y
1
Schweibin
sotimos
09/06/85 g
Chr
- %