Summary of 970220 Meeting W/Nei in Rockville,Md Re Views on Proposed Guidance for Inclusion in Final Version of Either NEI Industry Guideline for Implementing Requirements of 10CFR54,License Renewal Rule
ML20135E209
Person / Time
Issue date: 03/05/1997
From: Hoffman S
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
PROJECT-690 NUDOCS 9703060355
Download: ML20135E209 (7)


Text

-.

[*%

p 1

UNITED STATES s

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3DeeH001

't, March 5, 1997

)

1 l-ORGANIZATION: Nuclear Energy Institute (NEI)

SUBJECT:

Sup91ARY OF MEETING WITH NEI REGARDING THE NRC STAFF'S REGULATORY GUIDE AND NEI'S GUIDELINE FOR IMPLEMENTING THE LICENSE RENEWAL RULE On February 20, 1997, representatives of NEI met with the Nuclear Regulatery Commission (NRC) staff in Rockville, Maryland to present views on proposed guidance for inclusion in the final version of either the NEI " Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - the License Renewal Ru!s," NEI 95-10, or the NRC staff's Regulatory Guide '(RG), " Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses." A list of meeting attendees is provided :n Attachment 1.

NEI requested the meeting and provided the proposed agenda contained in.

Following is a summary of the views presented:

1.

Status of NRC review of the industry's USI/GSI study The NRC staff indicated that it is reviewing the NEI study of unresolved safety issues (USIs) and generic safety issues (GSIs) applicable to license renewal submitted by letter dated October 21, 1996, in conjunction with resolution of related public comments and will respond to NEI's submittal when completed.

2.

Status of outstandina tonics in NEI's December 21. 1997 letter NEI indicated that the industry has reviewed the electrical components listed in Appendix B of NEI 95-10 and has proposed changes to modify the way some of the components are addressed. NEI requested a meeting to present its views.

The NRC staff indicated that the meeting should be held after it has issued its position regarding the active / passive determination for a number of the components of concern.

i 3.

NEI feedback on staff's handout in the January 21. 19917 meetina Discussion on this topic was deferred to a later date.

'W#

4.

Clarification on makina the " license renewal" demonstration with existina i

nrograms At the January 21, 1997, meeting with the NRC staff, NEI provided a proposed rewrite of NEI 95-10, Sections 4.2 and 6.0 to address, in part, the l

demonstration required in a license renewal application for existing programs that may be adequate for aging management during the period of extended operation. The existing programs of concern are those that have been in g

NRC HLE CrdHER COPY 9

9703060355 970305 l

PDR PROJ

, _690 PDR

1 I \\

existence and are well understood by both the licensee and the NRC.

NEI indicated that less information should be required to demonstrate the acceptability of an existing program than for new programs or plant programs for which the NRC staff is not as familiar. NEI also questioned whether the applicant is required to demonstrate for renewal that a component's current licensing basis design basis is maintained or that its functionality is maintained. The NRC staff indicated that it would issue a letter to NEI with its position on the demonstration required for existing programs.

5.

Status of staff's review of the new insoection examole (reactor coolant system nozzles) and the draft FSAR Ifinal safety analysis reoorti example i

on level of detail The NRC staff indicated that it is reviewing the subject NE1 handouts from the January 21, 1997, meeting in conjunction with resolution of related public comments and will respond to NEI when completed.

6.

Schedule:

Rea. Guide /NEI 95-10 and Future Meetinas Future meetings were scheduled between NEI and the NRC staff for February 27 i

and March 6, 1997. NEI has requested a senior management meeting W *h Sam Collins, Director, Office of Nuclear Reactor Regulation. This meeting will be scheduled after the NRC staff has issued its positions on demonstrations for existing programs and NEI has evaluated them. The potential for scheduling Weekly meetings between NEI and the NRC was also discussed.

4 i

7.

Rea. Info. Conference A brief discussion was held regarding the topics and industry participation in the NRC's Regulatory Information Conference scheduled for April 1 and 2,1997.

This topic will be discussed again in the future.

N N

Stephen T. Hoffman, Senior Project Manager License Renewal Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Project 690 Attachments: As stated cc w/atts: See next page

NIJCLEAR ENERGY INSTITUTE (NEI)

Project No. 690 cc: Mr. Dennis Harrison U.S. Department of Energy NE-42 Washington, DC 20585 Mr. Douglas J. Walters Nuclear Energy Institute 1776 I Street, NW Suite 300 Washington, DC 20006 Mr. Richard P. Sedano, Commissioner State Liaison Officer State of Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, Vermont 05620-2601 i

6 4

l

.i DISTRIBUTION w/ attachments:

VCentra1Q11ey, PUBLIC

.PDLR R/F ACRS E-Mail SCollins/FMiraglia/(SJC1/FJM)

RZimmerman (RPZ)

TMartin (TTM)

DMatthews_(DBM)

SNewberry (SFN)

SMeador (SAM)

MaryAnnBiamonte (MAB)

RJohnson (REJ)

RCorreia (RPC)

RWessman (RHW)

JStrosnider (JRS2)

SDroggitis (SCD)

SPeterson (SRP)

Glainus (GCL)

)

JCraig (JWCl)

JVora (JPV) i BMorris (BMM)

JMoore/EHoller (JEM)/(EJH)

GMizuno (GSM)

GHolahan (GMH)

BSheron (BWS)

MMalsch (MGM)

MMayfield (MEM2)

AMurphy (AJM1)

HBrammer (HLB)

LShao (LCS1)

GBagchi (GXB1)

MDrouin (MXD)

PDLR (staff) m

ATTENDANCE LIST NRC MEETING WITH THE NUCLEAR ENERGY INSTITUTE FEBRUARY 20. 1997 NAME ORGANIZATION 1.

Steve Hoffman NRC/NRR/DRPM/PDLR 2.

Sam Lee NRC/NRR/DRPM/PDLR 3.

Ray Baker Southern Company 4.

Doug Walters NEI 5.

David Mastero GPU Nuclear 6.

Michael Henig Virginia Power 7.

David B. Roth Virginia Power 8.

Don Eggett Comed 9.

Mary Ann Biamonte NRC/0EDO 10 Tricia Heroux for EPRI

11. Charles Meyer Westinghouse /WOG
12. Chuck Krause Wisconsin Electric Power
13. Robert Gill Duke Power
14. Scott Newberry NRC/NRR/DRPM/PDLR
15. Richard E. Johnson NRC/RES/DET/EMMEB
16. Paul Colaianni Duke Power 4

i Attachment I

i l

Proposed Discussion Topics NEl/NRC Meeting February 20,1997

1. Status of NRC review of the industry's USI/GSI study
2. Status of outstanding topics in NEI's December 24,1995 letter 96-02, %-03, and 96-19
3. NEI feedback on staff's handout in the January 21,1997 rrecting
4. Clarification on making the " license renewal" demonstration with existing programs
5. Status of staffs review of the new inspection example (reactor coolant system nozzles) and the draft FSAR example on level of detail
6. Schedule Reg Guide /NEI 95-10 Future Meetings 7.' Reg Info Conference l

l ATTACHMENT 2

existence and are well understood by both the licensee and the NRC. NEI j

indicated that less information should be required to demonstrate the d

acceptability of an existing program than for new programs or plant programs for which the NRC staff is not as familiar.

NEI also questioned whether the applicant is required to demonstrate for renewal that a component's current i

licensing basis design basis is maintained or that its functionality is maintained. The NRC staff indicated that it would issue a letter to NEI with its position on the demonstration required for existing programs.

E.

Status of staff's review of the new insoection examole (reactor coolant system nozzles) and the draft FSAR Ifinal safety analysis reoortl examole on level of detail The NRC staff indicated that it is reviewing the subject NEI handouts from the January 21, 1997, meeting in conjunction with resolution of related public comments and will respond to NEI when completed.

6.

Schedule:

Rea. Guide /NEI 95-10 and Future Meetinas Future meetings were scheduled between NEI and the NRC staff for February 27 and March 6, 1997. NEI has requested a senior management meeting with Sam Collins, Director, Office of Nuclear Reactor Regulation.

This meeting will be sr.heduled after the NRC staff has issued its positions on demonstrations for sxisting programs and NEI has evaluated them. The potential for scheduling weekly meetings between NEI and the NRC was also discussed.

7.

Rec. Info. Conference 1

A brief discussion was held regarding the topics and industry participation in the NRC's Regulatory Information Conference scheduled for April 1. and 2,1997.

)

This topic will be discussed again in the future, j

Original signed by:

Stephen T. Hoffman, Senior Project Manager License Renewal Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Project 690 Attachments: As stated cc w/atts:

See next page NAME: A:\\NEIO220.MTS T2 seceive a copy of thne document, Indicate in the bes: "C" = Copy without attachment / enclosure

'E" = Copy with attachment / enclosure

  • N" = No copy 0FFICE PN:PDLR M -

E D:PDLV NAME SMoffenjavl SNedbirry DATE 03/ 4-/97 03/ % /97 0FFICIAL RECORD COPY