r- Wa ,
CENTE~ DOR ENERGY 5501 N. State Route 2 419-249-2300 John K. Wood Oak Harbor, OH 43449 FAX: 419-3214337 Vce President Nuclear Davis Besse 4
Docket Number 50-346 License Number NPF-3 Serial Number 2421 December 4, 1996 A
United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001 Subject Revision to Summary Report for Resolution of Unresolved Safety Issue A-46 Ladies and Gentlemen:
Toledo Edison forwarded the plant specific Summary Report for Resolution of Unresolved Safety Issue A-46, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, for the i Davis-Besse Nuclear Power Station (DBNPS) by letter dated August 29, 1995
.; (Serial Number 2316). The submitted Summary Report included copies of relay evaluations do,cumented on the Seismic Qualification Utility Group (SQUG) A-46 Relay Screening and Evaluation Form G.4 - Relay Tabulation,
- (G.4 Forms).
Toledo Edison has revised the G.4 Forms associated with the two 4160 volt essential switchgears (C1 and Di switchgear) to reflect an increase in the amplification factor. The amplification factor is utilized to calculate the seisnde demand for essential relays located on the switchgear. A review of the original qualification repr,rt revealed an incorrect amplification factor was used. A new analy:Is was performed to establish the correct amplification factor. This analysis resulted in an increase in the amplification factor from 5.5 to 6.155. This increase in j the amplification factor is applicable to all essential relays located in the C1 and D1 switchgear, and does not affect any other equipment.
The revision in the amplification factor has not changed any of the conclusions identified in the previously submitted Summary Report since the revised seismic capacity of the affected essential relays exceeds the seismic demand. j 4
- \
g D
Dockst Number 50-346 i Licensa Numb 3r NPF-3
. Sapial Number 2421
- Page 2 Submittal of the revised G.4 Forms was discussed with Ms. L. L. Gundrum on September 16, 1996.
Enclosed for inclusion into the Summary Report are revised forms for G.4 Form numbers 110, 283 through 289 inclusive, 291 through 296 inclusive and 298.
Should you have any questions or require additional information, please contact Mr. James L. Freels Manager - Regulatory Affairs, at I
(419) 321-8466.
Very truly yours, DHL Enclosures cc: A. B. Beach, Regional Administrator, NRC Region III w/o enclosures A. G. Hansen, DB-1 NRC/NRR Project Manager S. Stasek, DB-1 NRC Senior Resident Inspector w/o enclosures Utility Radiological Safety Board w/o enclosures I
i I
\
1
< l t
pso?I 015,
Dockst Numbir 50-346
, i Lic&nso Number NPF-3 53 rial Numb r 2421
- ' Enclosure A
- UPDATED INFORMATION FOR THE
SUMMARY
REPORT FOR RESOLUTION OF UNRESOLVED SAFETY ISSUE A-46 i l
FOR I
DAVIS-BESSE NUCLEAR POWER STATION UNIT NUMBER 1 This letter is submitted in conformance with Section 182a of the Atomic Energy Act of 1954 as amended, and 10CFR50.54(f). Enclosed is updated information regarding Toledo Edison's Summary Report for Resolution of Unresolved Safety Issue A-46 in response to Supplement No. I to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue A-46.
By: ,
J. K Wood, V' ice President - Nuclear Sworn and subscribed before me this 4th day of December,1996, i 04AL h w W l NoraLynnFloo4/NotaryP6blic-StateofOhio My Commission 6xpires September 3, 1997.
f Dockst Numb 3r 50-346 Licenso Numb 3r NPF-3
". *Sprial Numbsr 2421 Enclosure 1
- G.4M //h l A-46 RELAY SCREENING AND EVALUATION '
FORM G.4 - RELAY TABULATION Pi. ANT 2hns-Erssn tub r--f.
l System MM MM h4//~/@f77#f Page l Relay l
Type and ,
Subsystem / Component RefDwg(s) Contact / Contact Group Location SAT LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR Level 2 screening is being applied to the following essential relay types, which are located in the Westinghouse medium voltage switchgears C1 dnd D1:
Agastat model 7022, General Electric models HFA51A, HGA17C (see attached sheet for comparison between General Electric models HGA17A and HGA17C) .
Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand. Both C1 and D1 are located in Plant Area G, elevation 585', which is less than about 40' above effective grade (Area 6 effective grade = 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .60389 and .242g respectively. Per DBE-96-00o4c an amplification factor of 6.1546 has been asigned to the C1 l and D1 switchgears. The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand:
SD = .6038g X 1.5 X 6.155 l SD = 5.575g ZPA seismic demand:
SD = .242g X 1.5 X 6.155 SD = 2.23g l Relay capacities from GERS-RLY-ARH.5 and GERS-RLY-PNT.7 HGA17A HFA51A 7022 Peak 6 6 6 ZPA 2.4 2.4 2.4 therefore, seismic capacity exceeds seismic demand.
Identify reason for Contact / Contact Group being satisfactory or unsatisfactory CA - Chatter acceptable.
NV - Not vulnerable (mechanically-actuated contacts and solid state relays).
l GERS - Seismically adequate based on GERS i include GERS number.
) NA - Component not affected by relays.
l CR - Corrective action required. g/ g
- ' OA - Operator action. Prepared by Mr Date/*g_
- No entry necessary. Reviewed byC WA *
&#/ Date//-/r-ft l
l G-4
Dockot Numbsr 50-346 t Licensa Numbar NPF-3 "Sprial Number 2421
- ' Enclosure 2
- A-46 REMY SCREENING AND EVALUATION ,
G.4'Yrhb FORM G.4 - REMY TABULATION PMNT JWes-Ersst- u m-r -f_
System Page MM8Ad7d~ S 8//7M//T Rela
,OM - Type and ,
Subsystem / component RefDwg(s) Contact /ContactGroup Location SAT LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR Level 2 screening is being applied to the following essential relay types, which are located in the Westinghouse medium voltage switchgears C1 and D1:
Agastat model 7022, General Electric models HFA51A, HGA17C (see attached sheet for comparison between General Electric models HGA17A and HGA17C).
Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand. Both C1 and D1 are located in Plant Area 6, elevation 585', which is less than about 40' above effective grade (Area 6 effective grade = 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .6038g and .242g respectively. Per DBE-96-o0046 an amplification factor of 6.1546 has been asigned to the C1 l and D1 switchgears. The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand: j SD = .6038g X 1.5 X 6.155 l SD = 5.575g I ZPA seismic demand:
SD = .2429 X 1.5 X 6.155 l SD = 2.23g i Relay capacities from GERS-RLY-ARH.5 and GERS-RLY-PNT.7 j HGA17A HFA51A 7022 Peak 6 6 6 ZPA 2.4 2.4 2.4 i therefore, seismic capacity exceeds seismic demand. l l
i Identify reason for Contact / Contact Group being satisfactory or unsatisfactory CA - Chatter acc,eptable.
NV - Not vulnerable (mechanically-actuated contacts and solid state relays).
GERS - Seismically adequate based on GERS ; include GERS number.
NA - Component not affected by relays.
CR - Corrective action required. // -
,/
OA
- Operator action.
- No entry necessary.
Prepared byM Reviewed byl WAM / Date w-a-fc.
ate b/7-h
/
G-4
Dockat Numbar 50-346 4 ,
Licenso Numb:r NPF-3
- Sprial Number 2421
! Enclosure 3 .
G.4 O A-46 RELAY SCREENING AND EVALUATION '
j FORM G.4 - RELAY TABULATION PLANT hhs-Etsse mW -1.
System b b -- Page
- V!
i Relay Type and .
Subsystem / Component RefDwg(s) Contact / Contact Group Location SAT
! I LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR Level 2 screening is being applied to the following essential relay types, i which are located in the Westinghouse medium voltage switchgears C1 and D1:
Agastat model 7022, General Electric models HFA51A, HGAl?C (see attached i sheet for comparison between General Electric models HGA17A and HGA17C). !
Level 2 screening requires'that the seismic capacity of the relay exceed it's seismic demand. Both Ci and D1 are located in Plant Area 6, elevation 585', which is less than about 40' above effective grade (Area 6 effective grade = 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .6038g and .2429 respectively. Per f DBE-96-00046 an amplification factor of 6.1546 has been asigned to the C1 I l
and D1 switchgears. The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand:
SD = .6038g X 1.5 X 6.155 SD = 5.575g ZPA seismic demand:
SD = .2429 X 1.5 X 6.155 SD = 2.23g ,
Relay capacities from GERS-RLY-ARH 5 and GERS-RLY-PNT.7 )
HGA17A HFA51A 7022 l Peak 6 6 6 ZPA 2.4 2.4 2.4 therefore, seismic capacity exceeds seismic demand.
l Identify reason for Contact / Contact Group being satisfactory or i
, unsatisfactory j CA - Chatter acceptable.
NV - Not vulnerable (mechanically-actuated contacts and solid stato relays).
GERS - Seismically adequate based on GERS ; include GERS number.
NA - Component not affected by relays. '
CR - Corrective action required.
OA
- Operator action.
- No entry necessary.
Prepared by Reviewed by C krw&-X*F/ Date N-n-fL ate Ikd f
G-4
Docket Number 50-346
, : Licence Numbsr NPF-3
'Sarial Numbsr 2421 Enclosure 4 ,
{ G.4#285 l A-46 RELAY SCREENING AND EVALUATION "
FORN G.4 - RELAY TABULATION !
CLANT JWes-Brssr m u -r -I.
System Mb Page M Relay Type and ,
- Subsystem / Component RefDwg(s) Contact / Contact Group Location SAT l
LEVEL 2 SCREENING FOR C1 AND D1 GWITCHGEAR :
Level 2 screening is being applied to the following essential relay types, which are located in the Westinghouse medium voltage switchgears C1 and D1:
Agastat model 7022, General Electric models HFA51A, HGA17C (see attached sheet for comparison between General Electric models HGA17A and HGA17C).
Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand. Both C1 and D1 are located in Plant Area 6, elevation 585', which is less than about 40' above effective grade (Area 6 effective >
grade = 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .6038g and .242g respectively. Per DBE-96-00046 an amplification factor of 6.1546 has been asigned to the C1 l and D1 switchgears. ,The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand:
SD = .60389 X 1.5 X 6.155 SD = 5.575g ZPA seismic demand:
SD = .242g X 1.5 X 6.155 SD = 2.239 Relay capacities from GERS-RLY-ARH.5 and GERS-RLY-PNT.7 HGAl?A HFA51A 7022 Peak 6 6 6 ZPA 2.4 2.4 2.4 therefore, seismic capacity exceeds seismic demand.
- Identify reason for Contact / Contact Group being satisfactory or unsatisfactory CA - Chatter acceptable. ,
NV - Not vulnerable (mechanically-actuated contacts and solid state relays).
l GERS - Seismically adequate based on GERS ; include GERS number.
I NA - Component not affected by relays.
CR - Corrective action required. /
l OA - Operator action. Prepared by . 420 ate k-AI-hd
- No entry necessary. Reviewed by ( W#-&r / Date / NAM 1
l l G-4
l Docket Number 50-346 Liesnsa Numb 3r HPF-3 l
"Ssrial Numbar 2421 l Enclosure 5 .
G.4 Mb A-46 RELAY SCREENING AND EVALUATION '
FORN G.4 - RELAY TABULATION PLANT JWtrs-Brssr w wr-i System N/Md Page /
Relay Type and .
Subsystem / Component Ref Dwg(s) Contact / Contact Group Location SAT t
LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR Level 2 screening is being applied to the following essential relay types, which are located in the Westinghouse medium voltage switchgears C1 and D1:
Agastat model 7o22, General Electric models HFA51A, HGA17C (see attached sheet for comparison between General Electric models HGA17A and HGA17C) .
Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand. Both C1 and D1 are located in Plant Area 6, elevation 585', which is less than about 40' above effective grade (Area 6 effective grade = 573') The median-centered floor response for Peak and ZPA for this area and elevation are .6038g and .2429 respectively. Per DBE-96-00046 an amplification factor of 6.1546 has been asigned to the C1 f and D1 switchgears. The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand:
SD = .60389 X 1.5 X 6.155 SD = 5.575g ZPA seismic demand:
SD = .242g X 1.5 X 6.155 SD = 2.239 Relay capacities from GERS-RLY-ARH.5 and GERS-RLY-PNT.7 HGA17A HFA51A 7022 Peak 6 6 6 ZPA 2.4 2.4 2.4 therefore, seismic capacity exceeds seismic demand.
- Identify reason for Contact / Contact Group being satisfactory or
- unsatisfactory CA - Chatter acceptable. ,
NV - Not vulnerable (mechanically-actuated contacts and solid state relays).
GERS - Seismically adequate based on GERS ; include GERS number.
i NA - Component not affected by relays,
- CR - Corrective action required. dj OA - Operator action. Prepared by Date 70
- No entry necessary. Reviewed byL 6/#Mr# / Date //-/r-/4 G-4 l
- .. - . _ _ - - - - _ .-~ . - ._
Dockat Numb 2r 50-346 Licenza Number NPF-3 !
l
- Sprial Number 2421' l Enclosure 6 , l G.4 0 A-46 RELAY SCREENING AND EVALUATION '
. i FORM G.4 - REuY TABUuTION .
PLANT JWes-Erssn u m T- i )
System ///65 //7~E R Page /3/.I. )
Relay Type and ,
Subsystem / Component Ref Dwg(s) Contact / Contact Group Location SAT l
LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR Level 2 screening is being applied to the following essential relay types, which are located in the Westinghouse medium voltage switchgears C1 and D1:
Agastat model 7022, General Electric models HFA51A, HGA17C (see attached sheet for comparison between General Electric models HGA17A and HGA17C).
Level 2 screening requires that the seismic capacity of the relay exceed l it's seismic demand. Both C1 and D1 are located in Plant Area 6, elevation l 585*, which is less tlan about 40' above effective grade (Area 6 effective I grade = 573 ' ) . The median-centered floor response for Peak and ZPA for l this area and elevation are .60389 and .242g respectively. Per l DBE-96-00046 an amplification factor of 6.1546 has been asigned to the C1 l and D1 switchgears. The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand:
SD = .60389 X 1.5 X 6.155 SD = 5.575g ZPA seismic demand:
SD = .2429 X 1.5 X 6.155 SD = 2.239 Relay capacities from GERS-RLY-ARH.5 and GERS-RLY-PNT.7 HGA17A HFA51A 7022 Peak 6 6 6 ZPA 2.4 2.4 2.4 therefore, seismic capacity exceeds seismic demand.
- Identify reason for Contact / Contact Group being satisfactory or unsatisfactory CA - Chatter acceptable. ,
NV - Not vulnerable (mechanically-actuated contacts and solid state relays). ;
GERS - Seismically adequate based on GERS ; include GERS number. '
NA - Component not affected by relays.
CR - Corrective action required. /
4 OA - Operator action. Prepared b . -4 ate'2g,fo, 76
- No entry necessary. kM#. %# / Date //-/p-A, Reviewedby/ '
G-4
I Dockst Number 50-346 Licensa Number NPF-3 )
Sarial Numbsr 2421
'* Enclosure 7 ,
l G.4 7T~k& 0 l A-46 RELAY SCREENING AND EVALUATION '
FORM G.4 - RELAY TABULATION l PLANT lhfrs-Erssr_ mb-r- -f- l 1
System O/ I //M d Page Of Relay Type and ,
subsystem / Component Ref Dwg(s) Contact / Contact Group Location SAT LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR Level 2 screening is being applied to the following essential relay types, which are located in the Westinghouse medium voltage switchgears C1 and D1:
Agastat model 7022, General Electric models HFA51A, HGA17C (see attached sheet for comparison between General Electric models HGA17A and HGA17C).
Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand. Both C1 and D1 are located in Plant Area 6, elevation 585', which is less than about 40' above effective grade (Area 6 effective grade = 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .6038g and .2429 respectively. Per DBE-96-o0046 an amplification factor of 6.1546 has been asigned to the C1 l
and D1 switchgears. The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered flocr response X safety factor X amplification factor.
Peak seismic demand: l SD = .6o38g X 1.5 X 6.155 l SD = 5.575g l ZPA seismic demand:
SD = .242g X 1.5 X 6.155 SD = 2.239 l Relay capacities from GERS-RLY-ARH.S and GERS-RLY-PNT.7 HGAl?A HFA51A 7022 Peak 6 6 6 ZPA 2.4 2.4 2.4 therefore, seismic capacity exceeds seismic demand.
Identify reason for Contact / Contact GroJp being satisfactory or unsatisfactory CA - Chatter acceptable. , l NV - Not vulnerable (mechanically-actuated contacts and solid state relays). !
GERS - Seismically adequate based on GERS ; include GERS number.
! NA - Component not affected by relays.
I CR - Corrective action required.
l OA - Operator action. Prepared by .
L/- M 4 ate py ,kN
- No entry necessary.
Reviewed byW#;h/'/ Date /NAft;,
G-4
.. _m _ . . _ . _._ .___._ . _ . .. ._..._ _ _ _ ___... . _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _
Dockst Number 50-346 i
- Licensa Number NPF-3 i
'Sprial Numbar 2421'
'* Enclosure 8 .
A-46 RELAY SCREENING AND EVALUATION '
FORM G.4 - RELAY TA8ULATION PLANT 2ktis-Brssr uskT- f_
Systes 67)/bA/EA/7' bodA16 Page O 6 kEl/ [
/dr5R Reiay Type and >
Subsystem / Component RefDwg(s) Contact / Contact Group Location SAT l l
LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR ,
I l Level 2 screening is being applied to the following essential relay types, which are located in the Westinghouse rnedium voltage switchgears C1 and D1: i Agastat model 7022, General Electric models HFA51A, HGA17C (see attached sheet for comparison between General Electric models HGA17A.and HGA17C).
Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand. Both C1 and D1 are located in Plant Area 6, elevation 585', which is less than about 40' above effective grade (Area 6 effective grade = 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .6038g and .2429 respectively. Per DBE-96-00046 an amplification factor of 6.1546 has been asigned to the C1 l
and D1 switchgears. The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X arrplification factor.
Peak seismic demand:
SD = .6038g X 1.5 X 6.155 SD = 5.5759 ZPA seismic demand:
SD = .242g X 1.5 X 6.155 SD = 2.239 Relay capacities from GERS-RLY-ARH.S and GERS-RLY-PNT.7 HGA17A HFA51A 7022 Peak 6 6 6 ZPA 2.4 2.4 2.4 therefore, seismic capacity exceeds seismic demand.
Identify reason for Contact / Contact Group being satisfactory or unsatisfactory
- CA - Chatter acceptable.
NV - Not vulnerable (mechanically-actuated contacts and solid state relays), i GERS - Seismically adequate based on GERS ; include GERS number. !
NA - Component not affected by relays. -
1 CR - Corrective action required. /' dj OA - Operator action. Prepared by 2 .-
te g~< 7(4 l
- No entry necessary. Reviewed by W#_M/ Date /NAfs; i
k n
G4
4 Dockot Number 50-346
, Licensa Number NPF-3
- 'Sprial Number 2421
- ' Enclosure 9 ,
4 G.4 h f f l A-46 RELAY SCREENING AND EVALUATION '
FORM G.4 - RELAY TABULATION l
PLANT JWrs-ETssc:. u m-t- -f-System N Page j' NN bN/ M Relay Type and ,
Subsystem / Component RefDwg(s) Contact / Contact Group Location SAT i
LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR j l
Level 2 screening is being applied to the following essential relay types, which are located in the Westinghouse medium voltage switchgears C1 and D1:
Agastat model 7022, General Electric models HFA51A, HGA17C (see attached ,
sheet for comparison between General Electric models HGA17A and HGA17C) . )
l Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand. Both C1 and D1 are located in Plant Area 6, elevation 585', which is less than about 40' above effective grade (Area 6 effective grade = 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .6038g and .2429 respectively. Per DBE-96-00046 an amplification factor of 6.1546 has been asigned to the C1 l
and D1 switchgears. The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic denand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand:
SD = .6038g X 1.5 X 6.155 SD = 5.575g ZPA seismic demand:
SD = .242g X 1.5 X 6.155 SD = 2.23g ,
Relay capacities from GERS-RLY-ARH.S and GERS-RLY-PNT.7 l I
HGA17A HFA51A 7022 Peak 6 6 6 ZPA 2.4 2.4 2.4 therefore, seismic capacity exceeds seismic demand.
- Identify reason for Contact / Contact Group being satisfactory or unsatisfactory CA - Chatter acceptable.
NV - Not vulnerable (mechanically-actuated contacts and solid state relays).
GERS - Seismically adequate based on GERS ; include GERS number.
NA - Component not affected by relays. .
CR - Corrective action required. d OA
- Operator action.
- No entry necessary.
Prepared by - ate 7
-L#/ Date //-M'&
- h
{
Reviewed by $
G-4
. -_ _- ~ . - - - . - - . _ _ _ . - . - . _ . - --
Docket Number 50-346 ,
Licanse Number NPF-3
- Sprial Number 2421 Enclosure 10 ,
G.4 A-46 RELAY SCREENINA AND EVALUATION '
FORN G.4 - RELA'. TABULATION PLANT .TWio-Brsss _ u m-r- -f.
System MN Page Relay Type and ,
Subsystem / component RefDwg(s) Contact / Contact Group Location SAT 1
LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR -
Level 2 screening is being applied to the following essential relay types, ;
which are located in the Westinghouse medium voltage switchgears C1 and D1:
Agastat model 7022, General Electric models HFA51A, HGA17C (see attached sheet for comparison between General Electric models HGA17A and HGA17C).
Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand. Both C1 and D1 are located in Plant Area 6, elevation 585*, which is less than about 40' above effective grade (Area 6 effective grade - 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .6038g and .242g respectively. Per DBE-95~00046 an amplification factor of 6.1546 has beca saigned to the C1 l and D1 switchgears. The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand:
SD = .6038g X 1.5 X 6.155 SD = 5.575g ZPA seismic demand:
SD = .2429 X 1.5 X 6.155 SD = 2.239 Relay capacities from GERS-RLY-ARH.S and GERS-RLY-PNT.7 HGA17A HFA51A 7o22 Peak 6 6 6 ZPA 2.4 2.4 2.4 therefore, seismic capacity exceeds seismic demand.
- Identify reason for Contact / Contact Group being satisfactory or unsatisfactory CA - Chatter acceptable.
i NV - Not vulnerable (mechanically-actuated contacts and solid state relays).
GERS - Seismically adequate based on GERS ; include GERS number.
NA - Component not affected by relays.
- Corrective action required. p_g, CR OA - Operator action. Prepared by / , ate 1
- No entry necessary. Reviewed by L A/# %#/ Date //-afg k f G-4
Dockat Numb 2r 50-346
, . Licensa Numb 3r NPF-3 i
- Sprial Number 2421'
- Enclosure 11 ,
G.4 A-46 RELAY SCREENING AND EVAlt!ATION
- FORN G.4 - RELAY TABULATION PLANT JWes-Erscr_ u m T- -1.
System dM[N Page dI V Relay Type and ,
Subsystes/ Component RefDwg(s) Contact / Contact Group Location SAT LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR Level 2 screening is being applied to the following essential relay types, !
which are located in the Westinghouse medium voltage switchgears C1 and D1- l Agastat model 7022, General Electric models HFA51A, HGA17C (see attached sheet for comparison between General Electric models HGA17A and HGA17C).
Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand. Both C1 and D1 are located in Plant Area 6, elevation 585', which is less than about 40' above effective grade (Area 6 effective grade = 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .60389 and .242g respectively. Per ,
DBE-96-00046 an amplification factor of 6.1546 has been asigned to the C1 l !
and D1 switchgears. The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand:
SD = .6038g X 1.5 X 6.155 SD = 5.575g ZPA seismic demand:
SD = .242g X 1.5 X 6.155 l SD = 2.23g Relay capacities from GERS-RLY-ARH.S and GERS-RLY-PNT.7 i HGA17A HFA51A 7022 l
Peak 6 6 6 l ZPA 2.4 2.4 2.4 l therefore, seismic capacity exceeds seismic demand.
l Identify reason for Contact / Contact Group being satisfactory or 1 unsatisfactory l
CA - Chatter acceptable. ,
NV - Not vulnerable (mechanically-actuated contacts and solid state relays).
GERS - Seismically adequate based on GERS ; include GERS number.
NA - Component not affected by relays. -
CR - Corrective action required. / /
OA - Operator action. A ate I',f"/ /J 76
- No entry necessary. Prepared Reviewed by by [/MNe#/ Date N-/r-fc f
G-4
Docket Number 50-346 *
. . License Number NPF-3
- Serial Number 2421 Enclosure 12 ,
A-46 RELAY SCREENING AND EVALUATION '
FORM G.4 - RELAY TABULATION PLANT IWis-T5tssn um-r -f System d bkM/ Page l
Relay I Type and , !
Subsystem / Component Ref Owg(s) Contact / Contact Group Location SAT l l
i LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR l
Level 2 screening is being applied to the following essential relay types, which are located in the Westinghouse medium voltage switchgears C1 and D1: ,
Agastat model 7022, General Electric models HFA51A, HGA17C (see attached l sheet for comparison be. tween General Electric models HGA17A and HGA17C). l Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand, Both C1 and D1 are located in Plant Area 6, elevation 585# , which is less than about 40' above effective grade (Area 6 effective grade = 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .6038g and .242g respectively. Per DBE-96-o0046 an amplification factor of 6.1546 has been asigned to the C1 l and D1 switchgears. The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand:
SD = .6038g X 1.5 X 6.155 SD = 5.575g ZPA seismic demand:
SD = .2429 X 1.5 X 6.155 SD = 2.239 Relay capacities frota GERS-RLY-ARH.5 and GERS-RLY-PNT.7 HGAl?A HFA51A 7022 Peak 6 6 6 ZPA 2.4 2.4 2.4 therefore, seismic capacity exceeds seismic demand.
l l
- Identify reason for Contact / Contact Group being satisfactory or unsatisfactory CA - Chatter acceptable.
NV - Not vulnerable (mechanically-actuateil contacts and solid state relays).
GERS - Seismically adequate based on GERS ; include GERS number. !
NA - Component not affected by relays. ;
CR - Corrective action required. -
l OA - Operator action. Prepared by -
te Y 7(.
- No entry necessary. Reviewed by C U# M/ Date /uf%
[ !
1 G-4
- .-- .- _~ . -
Dockst Number 50-346
.. . License Number NPF-3 l
- Sprial Number 2421 Enclosure l3 ,
)
l G.4 A-46 RELAY SCREENING AND EVALUATION '
FORM G.4 - RELAY TABULATION PLANT .htra s-Erssr- m3rr i Syste. M/dE AM Page hV Relay Type and ,
Subsystem / Component RefDwg(s) Contact / Contact Group Location SAT LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR Level 2 screening is being applied to the following essential relay types, l which are located in the Westinghouse medium voltage switchgears C1 and D1:
Agastat model 7022, General Electric models HFA51A, HGAl?C (see attached sheet for comparison between General Electric models HGA17A and HGA17C) .
Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand. Both C1 and D1 are located in Plant Area 6, elevation 585', which is less than about 40' above effective grade (Area 6 effective grade = 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .6038g and .242g respectively. Per DBE-96-00046 an amplification factor of 6.1546 has been asigned to the C1 l and D1 switchgears. The natural frequency of the C1 and Di switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand: i SD = .6038g X 1.5 X 6.155 SD = 5.5759 ZPA seismic demand:
SD = .2429 X 1.5 X 6.155 SD = 2.239 Relay capacities from GERS-RLY-ARH.S and GERS-RLY-PNT.7 HGA17A HFA51A 7022 Peak 6 6 6 ZPA 2.4 2.4 2.4 therefore, seismic capacity exceeds seismic demand.
- Identify reason for Contact / Contact Group being satisfactory or i unsatisfactory l 1
CA - Chatter acceptable. , l NV - Not vulnerable (mechanically-actuated contacts and solid state relays). l GERS - Seismically adequate based on GERS ; include GERS number. l NA - Component not affected by relays.
CR - Corrective action required. '/ g
! OA - Operator action.
Prepared 7.
by ~W# %#/ /tDa/te Date149-fr. f6 l
- No entry necessary. Reviewed by '
i f l
l G-4
Docket Number 50+346 l
... Licenso Numbar NPF-3 I
- Syrial Number 2421 ,
- Enclosure 14 , l G.4 b A-46 RELAY SCREENING AND EVALUATION #
TORM G.4 - RELAY TABULATION PLANT .7Wes-T$rssr- uncr-i System / MT dM Page M i Relay Type and .
Subsystem / component Ref Dwg(s) Contact / Contact Group Location SAT 1
1 LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR Level 2 screening is being applied to the following essential relay types, which are located in the Westinghouse medium voltage switchgears C1 and D1:
Agastat model 7022, General Electric models HFA51A, HGA17C (see attached sheet for comparison between General Electric models HGA17A and HGA17C).
Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand. Both C1 and D1 are located in Plant Area 6, elevation 585', which is less than about 40' above effective grade (Area 6 effective grade = 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .6038g and .242g respectively. Per DBE-96-00046 an amplification factor of 6.1546 has been asigned to the C1 l and D1 awitchgears. The natural frequency of the C1 and D1 switchgears is less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand:
SD = .6038g X 1.5 X 6.155 SD = 5.575g ZPA seismic demand: )
SD = .242g X 1.5 X 6.155 ,
SD = 2.239 !
Relay capacities from GERS-RLY-ARH.S and GERS-RLY-PNT.7 HGA17A HFA53A 7022 Peak 6 6 6 l ZPA 2.4 2.4 2.4 l therefore, seismic capacity exceeds seismic demand.
Identify reason for Contact / Contact Group being satisfactory or unsatisfactory CA - Chatter acceptable.
NV - Not vulnerable (mechanically-actuated contacts and solid state relays).
GERS - Seismically adequate based on GERS ; include GERS number.
NA - Component not affected by relays.
- CR - Corrective action required.
OA - Operator action. Preparedby[2 /-
d d
Date /-
~N de
- No entry necessary. Reviewed by W/Xr#/ Date /NMr
]
G-4 i
Docket Number 50-346
, . . , Licanse Numbar NPF-3
- *Sprial Number 2421
'* Enclosure 15 ,
G.4 A-46 RELAY SCREENING AND EVALUATION , I FORM G.4 - RELAY TABULATION I l PLANT JW#s-Erssr u swr -f.
Systen /h/DA)EAf M)h page Nerac Relay Type and ,
l Subsystem / Component RefDwg(s) Contact / Contact Group Location SAT b
LEVEL 2 SCREENING FOR C1 AND D1 SWITCHGEAR Level 2 screening is being applied to the following essential relay types, which are located in the Westinghouse medium voltage switchgears C1 and D1:
Agastat model 7o22, General Electric models HFA51A, HGA17C (see attached sheet for comparison between General Electric models HGA17A and HGA17C) .
Level 2 screening requires that the seismic capacity of the relay exceed it's seismic demand. Both C1 and D1 are located in Plant Area 6, elevation 585', which is less than about 40' above effective grade (Area 6 effective grade = 573'). The median-centered floor response for Peak and ZPA for this area and elevation are .6o38g and .2429 respectively. Per DBE-96-ooo46 an amplification factor of 6.1546 has been asigned to the C1 l q and D1 switchgears. The natural frequency of the C1 and D1 switchgears is i less than 8Hz, therefore, seismic demand (SD) is calculated: SD = medium centered floor response X safety factor X amplification factor.
Peak seismic demand:
SD = .6o38g X 1.5 X 6.155 SD = 5.575g ZPA seismic demand:
SD = .242g X 1.5 X 6.155 SD = 2.23g Relay capacities from GERS-RLY-ARH.S and GERS-RLY-PNT.7 HGA17A HFA51A 7022 Peak 6 6 6 ZPA 2.4 2.4 2.4 therefore, seismic capacity exceeds seismic demand.
I Identify reason for Contact / Contact Group being satisfactory or l unsatisfactory l CA - Chatter acceptable.
NV i
- Not vulnerable (mechanically-actuated contacts and solid state relays). !
GERS - Seismically adequate based on GERS ; include GERS number.
NA - Component not affected by relays.
CR - Corrective action required. '
l OA - Operator action. Prepared by -
ate g j (p
- No entry necessary. Reviewed by O/#FaM Date //-/yc