ML20135E140

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Supplemental Response to NRC Re Noncompliance Noted in Insp Rept 70-1113/85-01.Corrective Actions Withheld (Ref 10CFR2.790)
ML20135E140
Person / Time
Site: 07001113
Issue date: 07/26/1985
From: Vaughan C
GENERAL ELECTRIC CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19273A508 List:
References
NUDOCS 8509160297
Download: ML20135E140 (2)


Text

e d m.du)

Tht/ss m

y G E N E R A L () E LE CTR I C NUCLEAR FUEL MANUFACTURING DEPARTMENT GENER AL ELECTRIC COMPANY - P. O. BOX 780 - WILMINGTON NORTH CAROLINA 28402 July 26, 1985 c.n C

c=

hk)

'C o

Dr. J. Nelson Grace, Regional Administrator s

3 m

U.

S.

Nuclear P gulatory Commission, RII co gg P.

O. Box 2203 cs ?-

Atlanta, Georgia 30301 no h

no

Dear Dr. Grace:

References:

(1) NRC License SNM-1097, Docket 70-1113 (2) NRC Inspection Report 70-1113/85-01 (3) Letter, CM Vaughan to JP Stohr, 3/22/85 (4) Letter, CM Vaughan to JP Stohr, 4/22/85 (5) Letter, JN Grace to EA Lees, 6/04/85 As required in Reference 5, General Electric Company Nuclear Fuel Manufacturing Department hereby submits a supplemental response to the item of apparent noncompliance identified during NRC Inspection 85-01.

In your 6/4/85 letter, you indicated that the NRC's position was originally communicated in an attachment to a letter dated 11/17/77.

This document was transmitted to GE identified as a

" draft" and, even after a recent review, we find that it provides no detail with regard to delegation of authority as it relates to the current issue.

Notwithstanding this fact, the telephone conversations and current written communications have been sufficient to define the NRC's position.

We also appreciate your review of the severity level classification of the subject violation.

We continue to feel that Severity Level V is more appropriate for this limited situation of minor significance.

We currently have nd intention of pursuing the matter further since, at this time, the severity level has no bearing on our compliance with the regulatory requirements.

Should the severity level become important in assessing our overall compliance in the future, additional attention to this matter would be warranted.

Pursuant to 10 CFR 2.790(d), General Electric requests that the attachment to this letter be withheld from public disclosure since 8509160297 OggfjI13 PDR ADOCK O PDR C

i I \\ ' LEOS w

GENER AL $ ELECTRIC Dr. J. Nelson Grace July 26, 1985 Page 2 this attachment identifies details of GE control and accounting procedures for safeguarding licensed special nuclear material.

If you have any questions regarding this matter, please contact me.

GENERAL ELECTRIC COMPANY d '/ Y. Q - Ml1W czt Charles M. Vaughan, Manager Regulatory Compliance M/C J26 CMV:bsd Attachment NSD-I

_