Attachrnqnt XV to ET 96-0097 Page 1 of 2 l
l i
I I
t i
l i
l ATTACHMENT IV i
l PROPOSED TECHNICAL SPECIFICATION CHANGES i
I l
i l
9612100197 961203 j
PDR ADOCK 05000482 p
PDR WOLF CREEK UNIT 1 6-18c Amendment No. 89,97,101 i
l J
Attachment IV to ET 96-0097 Page 2 of 2 ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) 3.
A surveillance program to ensure that the quantity of radioactivity contained in following outdoor liquid radwaste tanks that are not surrounded by liners, dikes, or walls capable of holding the tanks' contents and that do not have tank overflows and surrounding area drains connected to the liquid radwaste system, is less than the amount that would result in concentrations less than the limits of 10 CFR 20, Appendix B, Table 11, Column 2 at the nearest potable water supply and the nearest surface water supply in an UNRESTRICTED AREA, in the event of an uncontrolled release of the tank's contents.
a.
Reactor Makeup Water Storage Tank, b.
Refueling Water Storage Tank, c.
Condensate Storage Tank, and d.
Outside Temporary tanks, excluding demineralizer vessels and the liner being used to solidify radioactive waste.
The provisions of Specifications 4.0.2 and 4.0.3 are applicable to the Explosive Gas and Storage Tank Radioactivity Monitoring Program surveillance frequencies.
b.
Reactor Coolant Pump Flywheel Inspection Program Each reactor coolant pump flywheel shall be inspected per the recommendations of Regulatory Position C.4.
f lato Guide 1.14, Revi ion 1, d ted Au ust,1975. n heu o Position
.4.(
and
.4.
), a quah
-place T examination over the volume from the inner bore of the flywheel to the circle i
y of the radius represented by the flywheel gage holes shall be conducted or a surface examination (MT and/or PT) of exposed surfaces of the removed flywheels shall be conducted at ten year intervals coinciding with the Inservice Inspection schedule as required by ASME Section XI.
c.
Containment Tendon Surveillance Program This program provides controls for monitoring tendon performance, including the effectiveness of the tendon corrosion protection medium, to ensure containment structural integrity. The program shallinclude baseline measurements prior to initial plant operation as well as periodic testing thereafter. The Containment Tendon Surveillance Program, and its inspection frequencies and acceptance criteria, shall be in accordance with Wolf Creek Generating Station position on draft Revision 3 of Regulatory Guide 1.35, dated April.{4989j97{
The provisions of Specifications 4.0.2 and 4.0.3 are applicable to the Containment Tendon Surveillance Program inspection frequencies.
6.9 REPORTING REQUIREMENTS ROUTINE REPORTS 6.9.1 in addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following reports shall be submitted to the Regional Administrator of the NRC Regional Office unless otherwise noted.