ML20135D527

From kanterella
Jump to navigation Jump to search
Forwards GP-R-132147, Reactor Containment Bldg Integrated Leakage Rate Test Rept. First Test,Attempted on 850609, Terminated Due to Leakage Through Packing of Torus Vacuum Relief Valve AO-2502B.Second Test Completed on 850610
Date released: 05/28/2020 Download: ML20135D527


Reactor Containment Bldg Integrated Leakage Rate Test Rept.
ML20135D543
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/11/1985
From:
GENERAL PHYSICS CORP.
To:
References
Download: ML20135D543 (216)
Forwards GP-R-132147, Reactor Containment Bldg Integrated Leakage Rate Test Rept. First Test,Attempted on 850609, Terminated Due to Leakage Through Packing of Torus Vacuum Relief Valve AO-2502B.Second Test Completed on 850610
ML20135D524
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/10/1985
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION (ADM), Office of Nuclear Reactor Regulation
References
Download: ML20135D524 (1)