Forwards GP-R-132147, Reactor Containment Bldg Integrated Leakage Rate Test Rept. First Test,Attempted on 850609, Terminated Due to Leakage Through Packing of Torus Vacuum Relief Valve AO-2502B.Second Test Completed on 850610
ML20135D524
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/10/1985
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION (ADM), Office of Nuclear Reactor Regulation
Shared Package
ML20135D527 List:
References
NUDOCS 8509160087
Download: ML20135D524 (1)


Text

- ,

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (215)841-4000 September 10, 1985 Docket No. 50-277 Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk Dear Sir Enclosed is the report of the Peach Bottom Atomic Power Station Unit 2 Reactor Containment Building Integrated Leak Rate Test (ILRT) which was conducted during June, 1985.

This report is submitted pursuant to Technical Specification 6.9.3.d and 10 CFR 50, Appendix J, Section V.B.,

with the guidance of Regulatory Guide 10.1.

Yo u will note that the first attempted test (June 9, 1985) was terminated primarily due to leakage through the valve packing of a torus vacuum relief valve, AO-2502B. Identified leakage sources were repaired and a second ILRT was completed succcessfully on June 10, 1985.

Should there be any further questions, do not hesitate to contact me.

Very truly yours,

?

0 l

)

0509160007 0 277 W. M. Alden

- PDR ADOCK 050 R i

P Engineer-In-Charge g l Licensing Section Nuclear Services Enclosures cc: Dr.. Thomas E. Murley, Administrator, Region I, USNRC l T. P. Johnson, Fesident Site Inspector

. . - - . - -- . .