ML20135D434
| ML20135D434 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 02/24/1997 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Powers K CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20135D436 | List: |
| References | |
| NUDOCS 9703050238 | |
| Download: ML20135D434 (4) | |
See also: IR 05000155/1996012
Text
_.
. - -
.
.
.
.
.-
.
. - _ - .
j
-
.
1
J
J
'* \\1
'
February 24, 1997
8,
.
K. P. Powers, Plant General Manager
Big Rock Point Nuclear Plant
Consumers Power Company
i
10269 US 31 North
Charlevoix, MI 49720
SUBJECT:
NRC INSPECTION REPORT NO. 50-155/96012(DRP)
i
)
Dear Mr. Powers:
On January 17,1997, the NRC completed an insp3ction at your Big Rock Point Nuclear
Plant. The enclosed report presents the results of that inspection.
i
During the 7-week period covered by this inspection, operations, maintenance, and
i
engineering activities were normally performed satisfactorily. Based on the results of this
inspection, one violation of NRC requirements was identified. The first example of the
I
violation involves two events caused by an inappropriate surveillance procedure resulting in
o
a 400 gallon leak of primary coolant and the lifting of a relief valve because a blank flange
was not removed. The second example of the violation involved a maintenance procedure
i
that was inappropriate because it failed to provide adequate acceptance criteria for the re-
assembly of a containment isolation valve.
In addition to the violation, a concern was identified regarding maintenance and care of the
Standby Diesel Generator. This event was of concern to us because no action was taken
to correct several conditions adverse to quality, the buildup of ice and depletion of the
battery used to start the Standby Diesel Generator, for a prolonged period.
The violation is cited in the enclosed Notice of Violation, and the circumstances
surrounding the violation are described in detailin the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response,in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
1
f
1
\\
c0
l
i
D
-
4
l
T
9703050238 970224
'
ADOCK 05000155
0
I
,k
.
i
__
. _ . . _ _
. .
.
.
)
K. P. Powers
-2-
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosures, and your response will be placed in the NRC Public Document Room (PDR).
Sincerely,
!
John A. Grobe for
4
James L. Caldwell, Director
Division of Reactor Projects
i
Docket No. 50-135
License No. DPR-6
,
i
Enclosures:
2. Inspection Report
J
No. 50/155/96012(DRP)
cc w/ encl:
Robert A. Fenech, Vice President,
Nuclear Operations
,
James R. Padgett, Michigan Public
'
Service Commission
Michigan Department of Public Health
Department of Attorney Coneral(MI)
,
i
Docket File w/ encl
OC/LFDCB w/enci
DRP w/ encl
i
PUBLIC lE-01 w/ encl
A. B. Beach, w/ encl
CAA1 (E-mail)
W. L. Axelson, w/enci
Rlli PRR w/enci
'
Rill Enf. Coordinator, w/enci
DRS (3) w/enci
TSS w/enci
,
Document: R:\\insprpts\\ pow e rs\\ big r\\ big 96012.d rp
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci
'E" = Copy with attach /enci
"N" = No copy
OFFICE
Rill
f3 Rill 1
Rill M
NAME
Moynen
hk
BurgeshD
Grhkidwell
DATE
2 /11/ 9 7
2/0/97
2/7N7
'
OFFICIAL RECOR D COPY
.
-
-
.
.
- ,
a
.
e * "" g
uN4TED STATES
,%
NUCLEAR REGULATORY COMMISSION
,
(pyg
acc:oo m
i
t
noi wmstuvntt sono
,
'"'
[ ,St [, g tygys yng< agi
....
1
Februa ry 24, 1997
t
.
.
I
K. P. Powers, Plant General Manager
Big Rock Point Nuclear Plant
Consumers Power Company
'
10269 US 31 North
Charlevoix, MI 49720
SUBJECT:
NRC INSPECTION REPORT NO. 50-155/96012(DRP)
'
Dear Mr. Powers:
!
On January 17,1997, the NRC completed an inspection at your Big Rock Point Nuclear
Plant. The enclosed report presents the results of that inspection.
,
During the 7-week period covered by this inspection, operations, mairnenance, and
engineering activities were normally performed satisfactorily. Based on the results of this
inspection, one violation of NRC requirements was identified. The first example of the
violation involves two events caused by an inappropriate surveillance procedure resulting in
a 400 gallon leak of primary coolant and the lifting of a relief valve because a blank flange
was not removed. The second example of the violation involved a maintenance procedure
that was inappropriate because it failed to provide adequate acceptance criteria for the re-
assembly of a containment isolation valve.
'
i
in addition to the violation, a concern was identified regarding maintenance and care of the
Standby Diesel Generator. This event was of concern to us because no action was taken
to correct several conditions adverse to quality, the buildup of ice and depletion of the
battery used to start the Standby Diesel Generator, for a prolonged period.
,
'
The violation is cited in the enclosed Notice of Violation, and the circumstances
surrounding the violation are described in detail in the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
!
i
__
.
-
(
.-
. - - . . -
...
.
._ - . - .. - _ .
- . -
- - . - .
!-
i
!
- .
t
.
.
i
!
!
i
.
'
K. P. Powers
-2-
l
l
l
!
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
i
its enclosures, and your response will be placed in the NRC Public Document Room (PDR).
I
l
!
l
i
'
,
Sincerely,
.
1
I
.
!
~~
ames L. Caldwell, Director
l
Division of Reactor Projects
!
Docket No. 50-155
l
License No. DPR-6
l
!
'
,
'
Enclosures:
>
,
2. Inspection Report
No. 50/155/96012(DRP)
cc w/ encl:
Robert A. Fenech, Vice President,
>
Nuclear Operations
James R. Padgett, Michigan Public
Service Commission
Michigan Department of Public Health
Department of Attomey General (MI)
<