ML20135D168

From kanterella
Jump to navigation Jump to search
Forwards Number of Personnel & Man-Rem by Work & Job Function, for 1996.Total Dose Measured by Self Indicating Dosimeter (SID) Was 138.215 man-rem
ML20135D168
Person / Time
Site: Pilgrim
Issue date: 02/26/1997
From: Olivier L
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135D169 List:
References
BECO-2.97.021, NUDOCS 9703050101
Download: ML20135D168 (1)


Text

.

i Tcch Spec 6.9.A.3 Reg. Guide 1.16 j

Boston Edison Pilgnm Nuclear Power Staten Rocky Hill Road I

Plymouth, Massachusetts 02360 J

L J. Olivier Vice President Nuclear operations and station Director February 26, 1997 BECo Ltr. 2.97. 021 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 i

Docket No. 50-293 License No. DPR-35 The enclosed table, " Number of Personnel and Man-Rem by Work and Job Function", for the year 1996, is submitted in accordance with the requirements of the Pilgrim Nuclear Power Station Technical Specification (T.S.), Section 6.9.A.3, and as recommended by U.S. NRC Regulatory Guide 1.16.

The total dose measured by Self Indicating Dosimeter (SID) was 138.215 man-rem. SID measurements are used for tracking dose assigned to job functions. As required by T.S.

6.9.A.3, at least 80% of the total whole body dose received from external sources was accounted for via Radiation Work Permits assigned to specific major work functions.

Please do not hesitate to contact me directly if you have any questions.

. e i

4 L.. Olivier RLClavf/compmgt/96manrem

Enclosure:

Number of Personnel and Man-Rem by Work and Job Function ec:

Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Sr. Resident inspector - Pilgrim t

4%,1 75R 28s8A 35888ha R

PDR Udt>UU"

,