ML20135D078

From kanterella
Jump to navigation Jump to search
Forwards Final Rule,Which Amends 10CFR60,to Be Published in Federal Register
ML20135D078
Person / Time
Issue date: 11/27/1996
From: Rathbun D
NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
To: Bryan R, Ensign J, Faircloth L, Murkowski F, Reid H, Schaefer D, Vucanovich B
HOUSE OF REP., SENATE, SENATE, ENVIRONMENT & PUBLIC WORKS
References
FRN-61FR64257, RULE-PR-60 NUDOCS 9612090235
Download: ML20135D078 (75)


Text

- . - . ..- -. .--. - . . _ _ _ _. . -.

Novernber 27, 1996 The Honorable Barbara F. Vucanovich United States House of Representatives Washington, DC 20515 ,

Dear Congresswoman Vucanovich:

l l

Enclosed is a copy of a final rule, which amends 10 CFR Part 60, that is to be  !

published in the Federal Reaister. j The U.S. Nuclear Regulatory Commission is amending Part 60, its regulation i governing the disposal of high-level radioactive waste in geologic .

repositories. The final rule clarifies,the preclosure performance l requirements for considering " design basis events," to meet standards for l protection against radiation. The final rule redefines the term "important to  :

safety," to retain the quantitative features of the existing definition, but <

specifies different numerical criteria for each of two categories of design basis events. Part 60 is further amended to include requirements for a "preclosure controlled area" and preclosure controlled area boundary reference doses, similar to regulatory requirements contained in 10 CFR Part 72,

" Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and  !

High-Level Radioactive Waste." These amendments are necessary to provide i clarity and consistency in the Commission's regulations and, thereby, ensure the adequacy of these requirements to protect public health and safety.

The final rule resolves issues raised by the U.S. Department of Energy in a rulemaking petition, PRM-60-3. The petition has merit in particular respects, i and the' Commission has incorporated several of the petitioner's suggestions in i the final rule.

Sincerely, '

.?

Original signed by/ . 9 '

Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosure:

Final Rule I

)

I DISTRIBU1 ION: (*w/ enc)

Central File

  • DWM r/f NMSS r/f ENGB r/f PUBLIC Dir r/f DMorrison/RES WReamer/0GC OCA r/f RWeller DDancer DOCUMENT NAME: A:\CONGRLTS.DBE

, OFC ENGB, MSS () OCA 4 NAME MBkeb/Panad iello Wa'thbun DATE ll/th96 1l /i8/96 d /27/96 0FFICIAL RECO.1D COPY 9612090235 961127 PDR ORG NRCC N5$0 EEE 0E5550 COPY L M PTuo DNQ. ,p C c f - n/ J

i November 27, 1996 The Honorable John Ensign j United States House of Representatives l Washington, DC 20515 l

l

Dear Congressman Ensign:

i Enclosed is a copy of a final rule, which amends 10 CFR Part 60, that is to be published in the Federal Reaister.

The U.S. Nuclear Regulatory Commission is amending Part 60, its regulation governing the disposal of high-level radioactive waste in geologic repositories. The final rule clarifies the preclosure performance requirements for considering " design basis events," to meet standards for protection against radiation. The final rule redefines the term "important to safety," to retain the quantitative features of the existing definition, but specifies different numerical criteria for each of two categories of design basis events. Part 60 is further amended to include requirements for a "preclosure controlled area" and preclosure controlled area boundary reference doses, similar to regulatory requirements contained in 10 CFR Part 72,

" Licensing Requirements for the Independent Storage of Spent Nuclear fuel and High-Level Radioactive Waste." These amendments are necessary to provide clarity and consistency in the Commission's regulations and, thereby, ensure i the adequacy of these requirements to protect public health and safety.

The final rule resolves issues raised by the U.S. Department of Energy in a rulemaking petition, PRM-60-3. The petition has merit in particular respects, and the Commission has incorporated several of the petitioner's suggestions in the final rule.

Sincerely, Original signed by/ i Dennis K. Rathbun, Director Office of Congressional Affairs I 1

Enclosure:

Final Rule DISTRIBUTION: (*w/ enc)

Central File

  • DWM r/f NMSS r/f ENGB r/f PUBLIC Dir r/f DMorrison/RES WReamer/0GC OCA r/f RWeller DDancer DOCUMENT NAME: A:\CONGRLTS.DBE OFC ,ENGS N%S[) QCA I

NAME Mdb))eb/Prf nad C iello thbun DATE ll /h /96 I

\l/l/96 A/A7/96 0FFICIAL RECO.10 COPY l

J

November 27, 1996 l

1 The Honorable Harry M. Reid I United States Senate >

Washington, DC 20510 l

Dear Senator Reid:

Enclosed is a copy of a final rule, which amends 10 CFR Part 60, that is to be published in the Federal Reaister.

The U.S. Nuclear Regulatory Commission is amending Part 60, its regulation governing the disposal of high-level radioactive waste in geologic l repositories. The final rule clarifies the preclosure performance requirements for considering " design basis events," to meet standards for protection against radiation. The final rule redefines the term "important to safety," to retain the quantitative features of the existing definition, but l specifies different numerical criteria for each of two categories of design '

basis events. Part 60 is further amended to include requirements for a "preclosure controlled area" and preclosure controlled area boundary reference doses, similar to regulatory requirements contained in 10 CFR Part 72,

" Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste." These amendments ar.: necessary to provide clarity and consistency in the Commission's regulations and, thereby, ensure the adequacy of these requirements to protect public health and safety.

The final rule resolves issues raised by the U.S. Department of Energy in a rulemaking petition, PRM-60-3. The petition has merit in particular respects, and the Commission has incorporated several of the petitioner's suggestions in the final rule.

Sincerely, original signed by/

Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosure:

Final Rule DISTRIBUTION: (*w/ enc)

Central File

  • DWM r/f NMSS r/f ENGB r/f PUBLIC Dir r/f DMorrison/RES WReamer/0GC OCA r/f RWeller DDancer l i

DOCUMENT NAME: A:\CONGRLTS.DBE OFC ENGR, N%S [) OCAu  !

NAME MBhfhb/rd"*d Chiello [Rbbun DATE n/[/96 11/lf/96 ///g /96 0FFICIAL 1EC0llD COPY J

- -- . . . . . - . . - . .. ~_- . - - .- - . . . - -

Novernber 27, 1996 The Honorable Richard H. Bryan United States Senate

. Washington, DC 20510

Dear Senator Bryan:

Enclosed is a copy of a final rule, which amends 10 CFR Part 60,: that is to be published in the Federal Reaister.

The U.S. Nuclear Regulatory Commission is amending Part 60, its regulation governing the disposal of high-leve? radioactive waste in geologic repositories. The final rule clarifies the preclosure performance requirements for considering " design basis events," to meet standards for .

protection against radiation. The final rule redefines the term "important to  !

safety," to retain the quantitative features of the existing definition, but specifies different numerical criteria for each of two categories of design basis events. Part 60 is further amended to include requirements for a "preclosure controlled area" and preclosure controlled area boundary reference doses, similar to regulatory requirements contained in 10 CFR Part 72,

" Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste." These amendments are~necessary to provide clarity and consistency in the Commission's regulations and, thereby, ensure the adequacy of these requirements to protect public health and safety.

The final rule resolves issues raised by the U.S. Department of Energy in a rulemaking petition, PRM-60-3. The petition has merit in particular respects, and the Commission has incorporated several of the petitioner's suggestions in the final rule.

Sincerely, original signed by/

Dennis K. Rathbun, Director Office of Congressional Affairs )

Enclosure:

Final Rule DISTRIBUTION: (*w/ enc)

Central File

  • DWM r/f NMSS r/f ENGB r/f PUBLIC l Dir r/f DMorrison/RES WReamer/0GC' OCA r/f I RWeller DDancer DOCUMENT NAME: A:\CONGRLTS.DBE ]

0FC ENC 4 NMSS /) OC A, -

NAME MMheb/PdNd C ello D un l DATE ll / d96

/ M/1[96 4 /p/96 0FFICIAL RECORD COPY l l

November 27, 1996 The Honorable Frank H. Murkowski, Chairman

, Committee on Energy and Natural Resources United States Senate Washington, DC 20510

Dear Mr. Chairman:

Enclosed is a copy of a final rule, which amends 10 CFR Part 60, that is to be published in the Federal Reaister.

The U.S.; Nuclear Regulatory Commission is amending Part 60, its regulation governing the disposal of high-level radioactive waste in geologic repositories. The final rule clarifies the preclosure performance requirements for considering " design basis events," to meet standards for protection against radiation. The final rule redefines the term "important to safety," to retain the quantitative features of the existing definition, but specifies different numerical criteria.for each of two categories of design basis events. Part 60 is further amended to include requirements for a "preclosure controlled area" and preclosure controlled area boundary reference doses, similar to regulatory requirements contained-in 10 CFR Part 72,

" Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and -

High-Level Radioactive Waste." These amendments are necessary to provide clarity and consistency in the Commission's regulations and, _thereby, ensure the adequacy of these requirements to protect public health and safety.

The final rule resolves issues raised by the U.S. Department of Energy _ in a rulemaking petition, PRM-60-3. The petition has merit in particular respects, and the Commission has incorporated several of the petitioner's suggestions in the final rule.

Sincerely, original signed by/

Dennis K. Rathbun, Director Office of Congressional Affairs k-

Enclosure:

Final Rule cc: The Honorable J. Bennett Johnston:

DISTRIBUTION: .(*w/ enc)

Central File

  • DWM r/f NMSS r/f ENGB r/f PUBLIC Dir r/f DMorrison/RES - WReamer/0GC' OCA r/f
RWeller DDancer DOCUMENT NAME: A:\CONGRLTS.DBE~

0FC ENGB, NMSA QCA NAME MBMb/Pd "*

CPhiello Makhbun l DATE // //l/ /96 ll /h/96 // h7//96 l OKFICIAL RECORD COPY e

November 27, 1996 The Honorable Lauch Faircloth, Chairman Subcommittee on Clean Air, Wetlands, Private Property, and Nuclear Safety Committee on Environment and Public Works United States Senate Washington, DC 20510

Dear Mr. Chairman:

Enclosed is a copy of a final rule, which amends 10 CFR Part 60, that is to La published in the Federal Reaister.

Tha U.S. Nuclear Regulatory Commission is amending Part 60, its regulation governing the disposal of high-level radioactive waste in geologic repositories. The final rule clarifies the preclosure performance requirements for considering " design basis events," to meet standards for protection against radiation. The final rule redefines the term "important to safety," to retain the quantitative features of the existing definition, but specifies different numerical criteria for each of two categories of design basis events. Part 60 is further amended to include requirements for a "preclosure controlled area" and preclosure controlled area boundary reference doses, similar to regulatory requirements contained in 10 CFR Part 72,

" Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste." These amendments are necessary to provide clarity and consistency in the Commission's regulations and, thereby, ensure the adequacy of these requirements to protect public health and safety.

The final rule resolves issues raised by the U.S. Department of Energy in a rulemaking petition, PRM-60-3. The petition has merit in particular respects, and the Commission has incorporated several of the petitioner's suggestions in the final rule.

Sincerely, Original signed by/

Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosure:

Final Rule cc: The Honorable Bob Graham DISTRIBUTION: (*w/ enc)

Central File

  • DWM r/f NMSS r/f ENGB r/f PUBLIC Dir r/f DMorrison/RES WReamer/0GC OCA r/f RWeller DDancer DOCUMENT NAME: A:\CONGRLTS.DBE OFC EN_GB .f. %S /) OC A, -

NAME MBelkdfP d nad Ckp iello Dd hbYn DATE // //9/96 V/I/96 ///27/96 0:FICIAL RECO,lD COPY

November 27, 1996 The Honorable Dan Schaefer, Chairman Subcommittee on Energy and Power Cognittee on Commerce United States House of Representatives Washington, DC 20515

Dear Mr. Chairman:

Enclosed is a copy of a final rule, which amends 10 CFR Part 60, that is to be  ;

published in the Federal Reaister. l i

The U.S. Nuclear Regulatory Commission is amending Part 60, its regulation I governing the disposal of high-level radioactive waste in geologic  !

repositories. The final rule clarifies the preclosure performance requirements for considering " design bas % events," to meet standards for protection against radiation. The fina' rule redefines the term "important to i safety," to retain the quantitative features of the existing definition, but -l specifies different numerical criteria for each of two categories of design  !

basis events. Part 60 is further amended to include requirements for a j "preclosure controlled area" and preclosure controlled area boundary reference 1 doses, similar to regulatory requirements contained in 10 CFR Part 72,

" Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste." These amendments are necessary to provide clarity and consistency in the Commission's regulations and, thereby, ensure the adequacy of these requirements to protect public health and safety.

The final rule resolves issues raised by the U.S. Department of Energy in a rulemaking p<!tition, PRM-60-3. The petition has merit in particular respects, and the Commission has incorporated several of the petitioner's suggestions in the final rule.

Sincerely, signed by/

Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosure:

Final Rule cc: The Honorable Frank Pallone DISTRIBUTION: (*w/ enc)

Central File

  • DWM r/f NMSS r/f ENGB r/f PUBLIC Dir r/f DMorrison/RES WReamer/0GC OCA r/f RWeller DDancer DOCUMENT NAME: A:\CONGRLTS.DBE OFC ENGB, NMSSN,h OCA ')//

NAME Mdif/ b/8"f"*d CPah[ello DRathb'un DATE f /ph96 }l /l4/96 ////,7/96 0FFICIAL RECORD COPY

4 0

FI'NAL RULE I

i i

r . i 4

i

! [7590-01-P]

NUCLEAR REGULATORY COMMISSION ,

I 10 CFR Part 60 RIN: 3150-AD51 Disposal of High-Level Radioactive Wastes in Geologic Repositories; Design Basis Events AGENCY: Nuclear Regulatory Commission.  !

l ACTION: Final rule.

i l

l

SUMMARY

The Nuclear Regulatory Commission is amending its regulations on the protection of public health and safety from

! activities conducted at a geologic repository operations area (GROA) before permanent closure. In particular, the final rule addresses the measures that are required to provide defense in l depth against the consequences of " design basis events." These i

! measures include prescribed design requirements, quality assurance requirements, and the establishment of a preclosure controlled area from which members of the public can be excluded.

! EFFECTIVE DATE: , 1996 (30 days from date of publication in the Federal Register).

i i

FOR FURTHER INFORMATION, CONTACT: Dr. Richard A. Weller, Division of Waste Management, Office of Nuclear Material Safety i

._ . . _ . _ . _ .- _ ~ _ .. _._ _ _ _ . _ _ _ . - _

{

I and Safeguards, U.S. Nuclear Regulatory Commission, Washington, l DC 20555, telephone (301) 415-7287. i SUPPLEMENTARY INFORMATION:

l

Background

i l l Under the Nuclear Waste Policy Act of 1982, as amended, the U.S. Nuclear Regulatory Commission exercises licensing and l related regulatory authority with respect to geologic l repositories that are to be constructed and operated by the U.S. Department of Energy (DOE) for the disposal of high-level radioactive waste. The Commission's regulativns pertaining to these geologic repositories appear at 10 CFR Part 60. In recent years, NRC, in conjunction with its Federally-Funded Research and l

Development Center, the Center for Nuclear Waste Regulatory Analyses, completed a comprehensive review of the requirements of {

l Part 60 regarding their clarity and sufficiency to protect public  ;

l health and safety. NRC focused particular attention on any matters that may be ambiguous, insufficient for their intended ,

l i

l purpose, or inconsistent with other expressions of its regulatory policy. Independently, DOE conducted a similar review of Part 60.

I The NRC review identified deficiencies regarding the clarity

, and sufficiency of the current Part 60 requirements to protect

! 2 l

l

4 i public health and safety for the full range of credible  ;

conditions or events that may occur at an operating repository, including those low-probability events that have potentially serious consequences. NRC also noted that certain elements of existing Part 60 differ from counterpart requirements in other NRC rules where greater consistency in language would be beneficial. DOE's independent review of Part 60 requirements identified similar deficiencies in these requirements. To address these issues, DOE filed a petition for rulemaking (PRM),

PRM-60-3, on April 19, 1990.

In response to the DOE petition and the results of the NRC review of Part 60, the Commission published a proposed rule for public comment in the Federal Register on March 22, 1995 (60 FR 15180) to clarify the requirements for protection of public health and safety related to activities conducted at a GROA before its permanent closure. In particular, the proposed f rule provided new and modified definitions for certain terms (including the definition of "important to safety," with  !

i reference to structures, systems, and components), dose criteria j for accident conditions, and requirements for the establishment of a preclosure controlled area from which members of the public can be excluded when necessary. In an accompanying notice (March 22, 1995; 60 FR 15190) the Commission also granted in part, and denied in part, the specific proposals in the DOE petition. For a fuller discussion of the PRM, the proposed rule, 3

J

and the partial grant / partial denial of the DOE petition, see the Federal Register-notices cited above. As noted in the Federal ,

Register notice for the proposed rule (60 FR 15180) and as intended in subsequent discussions in this notice, unless the specific context suggests otherwise, the terms " provisions,"

" requirements," " standards," and " criteria" are generally used interchangeably; the term " limit" (as in " dose limit") is generally used to refer to a specific type of requirement or criterion; and the term " rule" is generally used to refer to the entire set of requirements or criteria (e.g., Part 60). This i

final rule completes NRC action related to PRM-60-3.

I Lastly, the Commission notes that, consistent with the mandates of the Energy Policy Act of 1992, the Environmental Protection Agency (EPA) is developing site-specific environmental radiation protection standards for a potential repository at Yucca Mountain, Nevada. In this regard, the Act specifies that, within one year after promulgation of the EPA standards, the Commission must promulgate a rule so that Commission regulations are consistent with the new EPA standards. Although the primary focus of the new EPA standards is on the postclosure period of repository performance, the staff will ensure that the current modifications to Part 60 proposed herein, which focus on the period of repository operations before permanent closure, are  !

consistent with the new EPP. standards. To the extent any inconsistencies between NRC and EPA requirements are identified, i

4 i

. i l.

they will be addressed in-the planned future rulemaking by NRC to l address new EPA standards.

l l i l Public Comments on the Proposed Rule

! A period of 90-days was specified in the Federal Register  !

! I for public comments on the proposed rule. The Commission I

specifically sought public comments on: (1) . the appropriateness of the proposed 0.05 SV (5 rem) dose limit in new 10 CFR 60.136 as the repository design basis for protection of public health and safety during accident conditions, and (2) the rationale i

! supporting the proposed 0.05 Sv (5 rem) dose limit. Ten sets of l comments were received on the proposed rule from the following l

organizations and individuals: (1) The Clean Water Fund of North Carolina (CWFNC) ; (2) Mr. Vernon J. Brechin; (3) DOE, Office of i

Civilian Radioactive Waste Management; (4) EPA, Office of Federal Activities; (5) Nye County, Nevada, Nuclear Waste Repository l Project Office; (6) Virginia Power Company; (7) Nuclear Energy i l

Institute (NEI) ; (8) Environmental Coalition on Nuclear Power i

(ECNP); (9) Wisconsin Electric Power Company; and (10) Mr. Marvin I. Lewis.

i l

The principal issues raised in the comments are summarized i

l below. (Comments that are duplicative, editorial, or beyond the scope of the rulemaking are not discussed herein but have been f considered in the analysis of the public comments.) For the 5

l-o -

l  :

l reasons indicated, the Commission has decided to adopt the l amendments substantially in the form proposed in the March 22, i

1995, Federal Register notice (60 FR 15180) but with the changes l

noted that reflect the Commission's analysis of the public <

I comments.

l 1. Controlled Area - Waste Isolation.  ;

l DOE noted that the supplementary information in the proposed l

l rule referred to the " controlled area" as one "... (within which waste isolation is to be ensured after permanent closure)," DOE <

observed that this is inconsistent with the Part 60 definition of l b l

" controlled area," which does not refer to waste isolation. DOE l

i recommended that the Commission delete the parenthetical phrase in the supplementary information.

1 i

i The Commission agrees that the parenthetical phrase does not l properly characterize the definition of " controlled area."

l

! However, rather than deleting the parenthetical phrase l

altogether, the Commission has modified the phrase to accurately reflect the definition of " controlled area" and its focus on i

I postclosure activities.

2. Multiole Failure Scenarios.

f i

i 6

l i -

DOE noted that the supplementary information under S60,136 seemed to indicate that multiple independent failure scenarios would be considered to be Category 2 design basis events and observed that, typically, nuclear safety analyses are not required to assume mulLiple failures of safety-related systems unless they are all credible consequences of the initiating event. DOE recommended that the Commission clarify how it intends to review the acceptability of repository systems, structures, and components in the context of the new rule.

The Commission agrees with this comment and has revised the supplementary information to clarify how it intends to review the analysis in the DOE license application to demonstrate compliance with the requirements of $60.136.

3. Probability Bounds for Desian Basis Events.

In the Section-by-section Analysis of S60.136 in the i proposed rule, the Commission indicated that the lower bound for Category 2 design basis events is on the order of 1 x 10-' per year (i.e., events with probabilities of occurrence less than 1 x 10 per year would generally be screened from further consideration due to their negligible contribution to overall risk). DOE and NEI objected that this lower bound is much too ,

low and unjustified. DOE recommended a lower bound of 1 x 10-I

' per year and NEI recommended a lower bound in the range of l

7

1 ~ x 10 per year to 1 x 10" per year. On the other hand, ECNP recommended that'the most' improbable sequences and combinations )

of events and accidents.(Category 2 and beyond) should be .

1 evaluated-in repository accident analysis.

l l

The Commission agrecs with DOE and NEI that the lower j probability bound discussed in the proposed rule for Category 2 ]

design basis events is too low and is unjustified. The  ;

-Commission considers that, on the basis of repository risk l perspective, a lower probability bound of 1 x 10-' per. year is appropriate for these events. The Commission recognizes'that the estimated consequences from Category 2 design basis events.are somewhat limited and-would not likely exceed several tenths of SV (several tens of rem). At this consequence level, the estimated risk of cancer fatality from events with a probability lower than 1 x 10~' per year is less than 1 x 10-e per year. To put this  ;

risk in perspective, the. International Commission on Radiological Protection 1 notes that a fatal cancer risk in the range of 1 x 10 to 1 x 10-5 per year from exposure to radiation would  !,

likely be acceptable to members of the public. As such, Category 2 design basis events which result in fatal cancer risks on the order of 1 x 10-e per year or lower do not contribute significantly'to individual risk. Accordingly, events with

' Recommendations of the International Commission on Radiological Protection. ICRP Publication 26, January 1977.

8

1 1

l probabilities of occurrence lower than 1 x 10~6 per year can be screened from further consideration in repository risk analysis.

The Commission has revised the Section-by-Section Analysis of S60.136 to reflect a lower bound for Category 2 design basis events on the order of 1x10-6 per year.

4. Definition of "Important to Safety" -

Enaineered Features.

DOE noted that the phrase " engineered structures, systems, and components," currently in the definition of "important to safety," was removed from the new definition and observed that it is clearly the intent of the regulation to apply the definition to engineered systems, not natural systems.

The Commission agrees with this comment and has revised the definition of "important to safety" to clarify this intent.

5. ADolicability of Environmental Protection Aaency Standards to the Manaaement and Storaae of Hich-Level Waste.

DOE stated that the proposed rule did not address all of the regulatory uncertainty associated with dose limits for design basis events because both the existing rule and the proposed rule 9

appear to require compliance with both EPA radiation protection '

standards and Part 20 radiation standards and there is an ,

inconsistency between these two standards. Virginia Power noted that the definition of "important to safety" establishes the Part 20 'imits th=* are referenced in 10 CFR 60.111(a) as the acceptance criteria for the Category 1 design basis events and concluded that this seems to be inappropriate. Virginia Power stated that Part 20 establishes occupational dose limits and radiation dose limits for members of the public, that these limits are expressed as annual limits, and that these limits are associated with normal licensed activities - not design basis events. Virginia Power considered that it is not appropriate to i l

use Part 20 limits to evaluate specific events. Virginia Power l further considered that acceptance criteria for design basis I

events are associated with the specific consequences of those events, as for example in S60.136 for the Category 2 design basis events, and that appropriate acceptance criteria will need to be developed if category 1 design basis events are retained by the final rule.

The Commission agrees with DOE that both the dose limits and the methodology for calculating doses to members of the public in the EPA standards differ from the dose limits and methodology for l

calculating doses to members of the public in Part 20, Subpart D.

Notwithstanding the differences between these standards, the staff does not consider that there is any regulatory uncertainty i

i 10 l l

l 1 - . . . .

l regarding applicable dose limits for Category 3 design basis t events. In DOE's demonstration of compliance, either the EPA l standards or the Part 20 standards may be more limiting or i controlling than the other, but that does not relieve DOE of the  !

requirement to comply with both standards. As such, the Commission has made no changes to the proposed rule to address DOE's concerns about the differences between Part 20 and the EPA [

standards.

I The Commission disagrees with Virginia Power that Part 20 limits are inappropriate. The Commission's numerical radiation protection standards are codified in Part 20 and apply to operations at a geologic repository by virtue of 10 CFR 20.1002 l

l and $60.111(a). However, it is not the Commission's intent that  :

1 it is necessary to use the annual limits in Part 20 to evaluate .

specific Category 1 design basis events on an individual basis.

Instead the Commission intends that the sum of the annual doses, i

exposures, and releases from gli Category 1 design basis events {

shall not exceed the limits specified in Part 20 and in the EPA i standards. j

6. Preclosure Controlled Area.

DOE expressed a concern that the use of the word "immediately" in the definition of "preclosure controlled area" could lead to an implication that the boundary must be next to l

! 11 i

I l

l

- - - - - _ r __,

the GROA. DOE also expressed a concern that the use of the word

" nearest" in S60.136(b) (i.e., " ...no individual located on or beyond the nearest boundary of the preclosure controlled area...") is confusing.

The Commission agrees with these comments and has:

(1) deleted the word "immediately" in the definition of "preclosure controlled area" in 10 CFR 60.2, (2) changed the phrase " nearest boundary" to "any point on the boundary" in the definition of "important to safety" in S60.2 and in the design requirements of the geological repository operations area in S60.136(b). )

i

7. Definition of Site.

l DOE recommended that the definition of " site" should include j "preclosure" and "postclosure controlled areas."

The Commission agrees with this comment and has modified the definition of " site"'to reflect its meaning during the period before permanent repository closure (i.e., the operational period), as well as the period following permanent closure.

8. Effluent Control.

12 l

l i

DOE stated that, with the deletion of the term "during normal operations," the application of the Part 20 effluent limits invoked by 560.111(a) is not clear. DOE recommended that 10 CFR 60.132 (c) (1) be revised to clarify that the latter section is applicable only to Category 1 design basis events.

The Commission agrees with this comment and has revised S 60.132 (c) (1) to clarify that this section is applicable only to Category 1 design basis events.

9. Criticality Control.

DOE noted that the Commission intended to clarify the requirements pertaining to criticality control, currently in i

10 CFR 60.131(b) (7) , but that some confusion concerning those l requirements remains. DOE pointed out that the proposed criticality control requirements in S60.131(h) refer to

" isolation of radioactive waste," a phrase with postclosure j connotations, while noting that systems "must be designed for criticality safety assuming occurrence of design basis events," a l I

phrase which has preclosure implicctions. Furthermore, DOE l l

argued that the last sentence in S60.131(h) could be interpreted as requiring a deterministic demonstration of criticality safety over the entire period of regulatory concern. However, given the time frames involved, DOE considered probabilistic analyses to be an essential part of demonstrating long-term criticality safety.

13 1

1

The Commission considers that the applicability of the criticality control requirements proposed in S60.131(h) is clear with respect to preclosure considerations but agrees with DOE I that uncertainty remains with respect to the applicability of the criticality control requirements to the postclosure period.

However, the Commission intends to address this remaining uncertainty in a future rulemaking to make the NRC requirements consistent with the revised EPA standards that are currently under development, as mandated by the Energy Policy Act of 1992.

Accordingly, in this final rule, 560.131(h) is promulgated, as proposed in the proposed rule. j

10. The Use of the terms "Important to Safety,"

" Accidents." " Normal Conditions." " Anticipated  !

Operational Occurrences." and "Desian Basis Events" in i

Part 60. j CWFNC stated that there was not any ambiguity in the current '

l use of the terms "important to safety" and " accidents" in l Part 60. ECNP stated that the terms " normal conditions,"

" anticipated operational occurrences," and " accidents" are not equivalent to nor adequately described by the term " design basis events."

The Commission disagrees with CWFNC that there is no ambiguity in the current use of the terms "important to safety" 14 s

L__.__ __ _ . _ . 7 .

- I

I 1

l

1 l

or " accidents" in Part 60. The latter term is undefined in Part 60, and there is uncertainty about its meaning with respect 1 l

to the range of events the term encompasses. The full range of Category 1 design basis events wou]d not generally be considered i

as " accidents," especially those events occurring regularly or moderately frequently. However, certain lower frequency Category 1 events, which occur one or more times during the operating lifetime of a facility and are otherwise known as

" anticipated operational occurrences," have at times been identified as " accidents." But " anticipated operational occurrences" are conditions of normal operation which are not to be confused with the unlikely, but credible and potentially significant, Category 2 design basis events. As such, the 1 l

current definition of "important to safety" is unclear with respect to its intended applicability to the design of l structures, systems, or components for normal operations, including anticipated operational occurrences. Further, with the focus on protection of members of the public in unrestricted areas, the current definition of "important to safety" does not explicitly address protection for the occupational work force.

The uncertainty is not related to interpreting the meaning of

" unrestricted area" but, rather, is related to the narrow focus of public exposure in unrestricted areas. Lastly, the value of 0.005 SV (0.5 rem) as a dose limit in unrestricted areas for .

" accident" conditions lacks consistency with a corresponding ,

j limit in Part 72 and with dose values established as guidance for 15

\ - a J

selected accidents (fuel handling and cask drop events) at Part 50 facilities (commercial power reactors).

Notwithstanding the comments offered by ECNP, the Commission considers that the definition of " design basis events" in the proposed rule does adequately define that term and that the supplementary information in the proposed rule does adequately describe the relationship between the terms " normal conditions,"

" anticipated operational occurrences," " accidents," and " design basis events." In this regard, it was the Commission's intent to supplant undefined terms in the rule (i.e., " normal conditions,"

" anticipated operational occurrences," and " accidents") with a defined term (i.e., " design basis events").

l l

For the above reasons, the Commission has not revised the definitions in the proposed rule for " design basis events." As discussed in items 4 and 6 above, editorial changes have been made to the definition of "important to safety," but these changes are unrelated to the arguments advanced by CWFNC or ECNP.

11. Radiation Protection Standards.

CWFNC stated that a 0.005 Sv (0.5 rem) limit would not be overly protective of public health and safety and there is no reason to seek a weaker standard. CWFNC suggested modifying Part 20 to clarify any ambiguities in radiation protection 16 i

! standards for repositories. ECNP offered a number of comments related to radiation protection standards:

  • The Commission should require DOE to provide design basis accident analyses for more than undefined " critical design basis events, singly" and should require demonstration that doses would be kept far below the maximum permissible dose limits, with an as low as is reasonably achievable requirement at least comparable with that for operating reactors.
  • The Part 60 limits must be much more stringent than for operating nuclear facilities.
  • The limit of radiation exposure should be no higher than the most restrictive exposure 1.imit that EPA imposes for any 1

licensee or other source of regulated nuclear activity.

  • A 0.005 Sv (0.5 rem) limit should be impermissible for an l individual dose from a waste site.

l

  • The most stringent level of worker protection, better than l

Part 20, should be required.

l

  • Part 20 standards are not restrictive enough for the purpose l

i of public health protection with respect to the storage and disposal of radioactive waste.

  • The definitional alteration of the term "important to safety" is not adequate to assure health protection for the public because the proposed categories 1 and 2 numerical limits for radiation exposures are based on standards that have failed to take into account the noncancer but adverse 17 l

i I

\

health effects of chronic low-dose radiation exposures that have been reported in the literature since development of NRC's Part 20 revision.

  • Extremely conservative radiation protection standards should be utilized ir repository design and performance criteria, and a zero release facility design goal should be required for all radioactive waste management.
  • An acceptable rationale for the 0.05 Sv (5 rem) dose limit proposed in the proposed rule is totally absent.

The Commission acknowledges that the 0.005 Sv (0.5 rem) dose limit in the definition of "important to safety" in the existing rule could be construed to be an implicit basis for designing structures, systems, and components to prevent or mitigate the consequences of accidents at the boundary of the unrestricted area. On the other hand, the 0.005 Sv (0.5 rem) dose limit could also be interpreted more narrowly, to identify only those structures, systems, and components that are subject to additional design requirements and a quality assurance program to ensure performance of intended functions. See 560.131(b) and 560.151. In short, the 0.005 Sv (0.5 rem) dose limit in the definition of "important to safety" in the existing rule is, in the Commission's view, subject to conflicting interpretations.

As previously discussed, the Commission's comprehensive review of Part 60 identified deficiencies in both the clarity and 18

\

sufficiency of requirements to protect workers and public health and safety. 'Among the identified deficiencies is the regulatory uncertainty created by possible conflicting interpretations that could be given to the 0.005 Sv (0.5 rem) dose limit in the "important to safety" definition described above and by the absence of an explicit design basis dose limit in Subpart E of the existing rule. An objective of this rulemaking is,  !

therefore, to resolve the uncertainty in Part 60, as well as remedy the incomplete definition of "important to safety" that fails to address protection of both workers and members of the public during Category 1 design basis events (i.e., " normal conditions," including " anticipated operational occurrences"). l The Commission has addressed these deficiencies with the addition of new $60.136, which now provides explicit design basis accident dose criteria for repository structures, systems, and components, 1 l

and modification of the definition of "important to safety" to include the broader interests of both worker and public health and safety for the full range of conditions or events that may occur before repository closure. The Commission believes that these amendments, as well as the others as described herein, clarify and enhance the provisions in the rule to protect worker I

and public health and safety.

I l

It was not the intent of this rulemaking to modify, in any way,

-the Commission's numerical radiation protection standards. As discussed earlier, these standards are codified in Part 20 and 1

19  ;

1 l

  • i
J ,.

apply to operations at a geologic repository by virtue of

$20.1002, as well as $60.111(a). The Commission believes that these standards continue to be appropriate for its licensees and provide adequate protection of worker and public health and safety at a repository. As such, comments by CWFNC and ECNP about possible modifications to the Commission's radiation protection standards as they would apply to an operating repository are beyond the scope of this rulemaking.

The commission agrees with ECNP that the term " critical design basis events" is ur. defined and, in the Section-by-Section Analysis of S60.21 of this final rule, has changed " critical design basis events" to " Category 2 design basis events." With 3;Sord to the scope of design basis accidents that should be c .sidered in the license application, the Commission previously addressed this issue in the discussion of probability bounds for Category 2 design basis events and determined that events with probabilities of occurrence lower than 1 x 10~' per year could be screened from further consideration due to their negligible contribution to individual risk.

Regarding the rationale for the 0.05 Sv (5 rem) dose limit in S60.136, the Commission continues to believe that the potential risks to membets of the public from an operating repository are very small. In light of this limited risk, the 0.05 SV (5 rem) dose limit provides an adequate margin of safety and an 20

. 1 i  :  :

4 appropriate basis for the design of repository structures, i systems, and' components to prevent or mitigate the consequences

! of low probability, but credible events. The Commission's I

reasoning behind the 0.05 SV (5 rem) dose limit can be found in j

< 1

~

l

the Section-by-Section Analysis of $60.136 that appears later in I i

j this notice.

1 t

i

12. Exclusion of the Public from Preclosure: Controlled Area.

1 i

l' Vernon J. Brechin objected to the use of the word "can"

?

versus "will" in the description of preclosure controlled area.

i ,

i l j The Commission disagrees with this comment. It is not the

]

Commission's intention to generally exclude members of the public  ;

1 from the preclosure controlled area (which would be the j i

, " controlled area" as defined in 10 CFR 20.1003). However, access ]

l 4 to the preclosure controlled area can be limited by the licensee

! for any reason (not necessarily one related to radiation a

protection). Within the preclosure controlled area will be a

" restricted area" (as defined in 560.2 and $20.1003). Access to 4

l a restricted area must be controlled for purposes of radiation l protection. Members of the public in the preclosure controlled

. area will be subject to the dose limits for members of the public 4

4 1

]

21

l f

1 :

in 10 CFR 20.1301. However, an individual who receives j occupational dose in the preclosure controlled area will be 6

subject to the occupational dose limits of Part 20, Subpart C.  !

All doses in a restricted area are occupational doses. The size of the preclosure controlled area is not specified by the regulations because it will be dependent upon the particular activities conducted during the operational period. i

)

13. Definition of Desian Basis Events.

Virginia Power and NEI recommended that the definition of

" design basis events" should make clear that the normal operations associated with receiving, handling, packaging, storing, emplacing, and retrieving high-level waste are not i

design basis events.

The Commission disagrees with this comment. It is the Commission's intent that events occurring regularly or frequently during the course of normal operations are considered as Category 1 design basis events. Category 1 design basis events effectively embody repository activities and conditions previously identified in Part 60 as " normal operations, including anticipated operational occurrences." In this regard, the Commission intends the Part 20 dose limits to be applicable to the conduct of repository activities, such as receiving, 22 1

A_

l handling, packaging, storing, placing, and retrieving high-level a

waste. ,

l

14. Definition of "Important to Safety" -

Function.

Virginia Power noted that in the proposed rule, the definition of "important to safety" refers to "...(1) to provide l reasonable assurance that high-level waste can be received, handled, packaged, stored, emplaced, and retrieved without exceeding the requirements of [10 CFR) 60.111(a) for Category 1 design basis events; or...." Virginia Power recommended that i this part of the definition should be revised to make it clear r'

that the focus of important to safety is design basis events and D2t the normal operations that are described by the definition in ,

the proposed rule.

i The Commission disagrees with this comment. As explained in f Item 13, the Commission intends that events occurring regularly or frequently during the course of normal operations are l considered as Category 1 design basis events.

15. Definition of "Important to Safety" - Quality Assurance ,

Issues.

Virginia Power and NEI stated that the definition of f "important to safety" proposed in the proposed rule would apply 23 l

l l

full Quality Assurance (QA) requirements to almost every system and component of the repository, and that the latter definition l does not establish a graded QA system to properly distinguish systems that are "important to safety" and ensure that the full QA program is only applied to those systems.

~

The Commission disagrees with this comment. When identifying items "important to safety," if it is determined that a particular structure, system, or component is essential to maintaining doses below Part 20 limits during normal operations (or during any Category 1 design basis event), then that structure, system, or component must be designated as "important to safety." The list of structures, systems, and components "important to safety," as well as the list of engineered barriers "important to waste isolation," are collectively referred to as the "Q-list" and are subject to the QA provisions of Part 60, Subpart G. The Commission supports a graded approach to meeting the QA provisions of Part 60. Such an approach is consistent with the NRC staff's " Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to QA Requirements (NUREG-1318)." The guidance given in that technical I position (TP) is still applicable under the rule's changes. The TP describes a graded application of QA measures consistent with that applied to other facilities (e.g., nuclear power reactors) licensed by the Commission. In this regard, the application of QA program requirements to repository structures, systems, and 24 l

l

components would generally be commensurate with their importance to safety.

16. Desian Bases - Similarities between GROA Facility and otner Facilicies Licensed by NRC.

ECNP stated that it is wrong to liken design basis for a waste repository (or long-term storage) facility to design basis for an operating nuclear reactor or other contemporary nuclear facility because of the longevity of the hazard and uncertainties of future monitoring and control.

The Commission disagrees with this comment. The design bases provided in the rule are for operations at the GROA and not for postclosure performance. Because operations at the repository are expected to be similar to operations at other facilities licensed by the Commission (e.g., 10 CFR Part 72 facilities), the Commission believes that it is appropriate that  ;

their design bases be comparable.

i

17. The Phrase "At All Times".

ECNP recommended that the phrase "at all times" should be retained throughout Part 60.

25 l

l The Commission disagrees with this comment. The phrase "at 4

all times" was originally included in the regulation to emphasize the need to design the GROA such that retrieval activities, if found necessary, would be conducted in accordance with Part 20.

The Commission continues to interpret the regulation in this manner but has removed the phrase "at all times" from S60.111 in the rule to clarify that the limits of Part 20 apply to Category 1 design basis events and that the separate design bases of S60.136 apply for Category 2 design basis events. Further, the Commission recognizes that conformance to the regulations should not hinder any actions that are necessary to protect public health and safety, such as lifesaving or maintaining confinement of radioactive materials (May 21, 1991; 56 FR 23365).

The phrase "at all times" is ambiguous in this respect and was therefore removed.

18. AS HIGH AS REASONABLY ACHIEVABLE (AHARA) Desian i Standard for the GROA.

ECNP recommended that NRC adopt an AHARA standard with respect to criteria for the design of the GROA. ECNP states that the purpose of such a standard would be to provide an extra measure of conservatism in the design. ECNP further states that, for an operating nuclear facility, regulatory changes over time that mandate tighter standards and reduced emissions can be 26

l 1

i accommodated by means of backfitting, but this is not so readily )

I accomplished at a disposal facility. f j

i The Commission disagrees with this comment and considers I as amended in this rulemaking, that the requirements of Part 60, The are sufficient to ensure public health and safety.

if necessary, can be Commission also considers that backfitting, accomplished at a disposal facility.

l Section-by-Section Analysis ,

l Definitions.

Section 60.2. ,

i The amendments involve 10 definitions needed in Part 60.

It is The term "preclosure controlled area" is new.

essentially the same as the term "preclosure control area" and corresponds proposed by DOE in its petition (PRM-60-3) closely to the term " controlled area," as defined in 10 CFR 72.3.

l The term "preclosure controlled area" is adopted because Part 60 already refers to a " controlled area" (which area has been I'

committed to use as a geologic repository and from which incompatible activities would be restricted following permanent closure). The function of the new term is to delimit an area t I'

over which the licensee exercises control of activities to mee Control includes the power to exclude regulatory requirements.

27

members of the public, if necessary. Because Part 60 (unlike Part 72) involves ongoing underground operations and timeframes of concern over centuries and millennia, language in the definition is included that, consistent with its function, limits the area to the surface and limits the duration to the period up to, and including, permanent closure.

The existing term " controlled area" is renamed "postclosure controlled area," to avoid any confusion or' misunderstanding about this term in relation to its use in Parts 20 and 72.

However, no substantive change is intended for the "postclosure controllet trea" because this is a change in nomenclature only.

Consistent with this nomenclature change, the term " controlled area" is changed to "postclosure controlled area," where it appears in the definitions for " accessible environment,"

" disturbed zone," and " site."

The term "important to safety" is amended to address the issues previously discussed. The existing provision is unclear and fails to ensure proper levels of protection of public and worker health and safety for the broad range of conditions or events that might occur at a repository site. This is an important term because it is the predicate for required design features as well as required quality assurance measures that provide defense-in-depth. The Commission is retaining the quantitative features of the existing definition but is 28

. i l

J

. i

, specifying different numerical limits for each of the two

]

categories (1 and 2) of design basis events. The structures, l systems, and components "important to safety" are those l

\

necessary: (1) to provide reasonable assurance that the '

} requirements of $60.111(a) would be observed for Category 1 4 l design basis events; or (2) to prevent or mitigate Category 2

)

j design basis events that could result in doses equal to, or greater than, the values specified in (new) S60.136 to any I

individual located on or beyond any point on the boundary of the

preclosure controlled area.

4 Although the term " design bases" appears in existing Part 60, in 560.21(c) (2) , it was not defined. As the previous discussion makes clear, " design bases" should be understood in relation to that range of events, including external natural or 3 man-induced events, that is taken into account in the. design, I

and, in particular, in relation to conditions that could result i i

in radiological consequences beyond specified limits. The definition in Part 72 is inserted, without change, into the list of defined terms in $60.2.  !

The inclusion of a definition of " design basis events" serves two purposes. First, it ideistifies a set of events (referred to elsewhere as Category 1 design basis events) that must be taken into account in demonstrating compliance with the requirement to show, with reasonable assurance, that the 29

Z provisions of Part 20 will be met. (This set of events is described as "...those natural and human-induced events that are reasonably likely to occur regularly, moderately frequently, or one or more times before permanent closure of the geologic repository operations area.") Second, it identifies an additional set of events (previously referred to as Category 2 design basis events) that must be taken into account in applying the commission's defense-in-depth philosophy. (This set of events is described as those "...other natural and human-induced events that are considered unlikely, but sufficiently credible to warrant consideration, taking into account the potential for significant radiological impacts on public health and safety.")

The Commission recognizes that the criterion of "sufficiently credible to warrant consideration" is inexact, leaving its application to a consideration of the particular site and design that are the subjects of a license application. Generally, the j Commission would expect that such design basis events would include as broad a range of external phenomena as would be taken 1

into account in defining the design basis for other regulated facilities, including nuclear reactors. The Commission would )

also expect that the analysis of a specific design basis event j l

would require an analysis which includes an initiating event (e.g., an earthquake) and the associated combinations of a

repository system or component failures that can potentially lead to exposure of the public to radiation.

30 l

i The definitions of " restricted area" and " unrestricted area"

are amended to conform with the definitions in Part 20. The current definitions in Part 60 do not precisely conform to the current Part 20 because no change was made to these Part 60 l definitions when Part 20 was revised.

e l The amendments of $60.2 adopted in this final rule differ l from the. amendments of $60.2 proposed in the proposed rule  ;

, (March 22, 1995; 60 FR 15180) in the following respects: (1) the revised definitions of " restricted area" and " unrestricted area" were not proposed in the proposed rule; (2) in the definition of

) "important to safety," the phrases " features of the repository" and " nearest boundary" in the proposed rule were changed to l " engineered features of the repository" and "any point on the 1'

boundary," respectively; (3) in the definition of "preclosure controlled area", the phrase "immediately surrounding the i

geologic repository operations area" in the proposed rule was changed to " surrounding the GROA"; and (4) in the definition of 1

" site", the phrase " location of the postclosure controlled area" I

was changed to " location of the preclosure controlled area, or of ,

i the postclosure controlled area, or both." The rationale for the revised definitions of " restricted area" and " unrestricted area"  ;

is provided in the preceding paragraph. The rationale for the other changes is discussed under " Response to Public Comments on the Proposed Rule."

31

i Section 60.8. Information collection recuirements:

OMB approval.

NRC is updating 10 CFR 60.8, "Information Collection Requirements: OMB Approval," to reflect the fact that subsequent to the original issuance of Part 60, NRC requested, and obtained Office of Management and Budget (OMB) approval for the Part 60 "Information Collection Requirements." Section 60.8 was to be corrected the first time other revisions were made.

The amendment of $60.8 adopted in this final rule differs from the amendment of $60.8 in the proposed rule (60 FR 15180) in that the term " Paperwork Reduction Act of 1980," in the proposed rule, has been changed to the term " Paperwork Reduction Act of 1995" in the final rule.

Section 60.21. Content of apolication.

The DOE petition suggested that provision for accident analysis might be accomplished by amendment of S60.111. The Commission, instead, is requiring an accident analysis as part of the content of the application section (i.e., 560.21). The language requires that the application. address the potential 1

dose, to any individual located on ortbeyond any point on the preclosure controlled area boundary, that is attributable to Category 2 design basis events. The procedure that is envisaged l

2 32

4 is that the applicant would address the Category 2 design basis events, singly, and demonstrate, by its analysis, that the doses to any individual located on or beyond any point on the preclosure controlled area boundary would be in accordance with the applicable requirements. The language serves the same purpose as the counterpart section of Part 72 (namely, 10 CFR 72.24[m]).

The final rule also reflects the position that the applicant must demonstrate that the requirements of Part 20 and the EPA standards will be met, assuming the occurrence of Category 1 design basis events. For this analysis, the applicant would calculate the gun of the doses, exposures, and releases from all Category 1 design basis events to ensure that these results do not exceed the limits specified in Part 20 and in the EPA standards.

The Commission also is eliminating certain terms in Part 60 1

that are undefined and may be subject to differing interpretations -- specifically, the terms " normal conditions,"

" anticipated operational occurrences," and " accidents." These terms are supplanted by the new term " design basis events."

Besides enhancing clarity of expression, the new language better reflects the articulated regulatory framework. Lastly, where the term " controlled area" appears in the language of this section, l it is changed to "postclosure controlled area."

33

Section 60.43. License specification.

The term " controlled area" is changed to "postclosure controlled area."

Section 60.46. Particular activities recuirina license amendment.

The term " controlled area" is changed to "postclosure controlled area."

Section 60.51. License amendment for oermanent closure.

The term " controlled area" is changed to "postclosure controlled area."

Section 60.102. Concepts.

The term " controlled area" is changed to "postclosure controlled area."

Section 60.111. Performance of the aeoloaic repository operations area throuah cermanent closure.

34

O The Commission is deleting the phrase "at all times" from the performance objective of S60.111(a). This change clarifies that this requirement does not apply to radiation exposures, levels, and releases from Category 2 design basis events.

Section 60.121. Recuirements for ownership and control of interests in land.

The term " controlled area" is changed to "postclosure controlled area."

Section 60,122. Sitino criteria.

The term " controlled area" is changed to "postclosure controlled area."

Section 60.130. Scope of desian criteria for the aeoloaic recository operations area.

The Commission is modifying the title of this section to the term " General Considerations" and is adding clarifying language, to the existing discussion, to indicate that SS60.131 through 60.134 specify the minimum criteria for the design of those structures, systems, and components important to safety, or important to waste isolation. These changes are necessary to provide consistency with the modified definition of "important to 35

1 l

safety" (S60.2), as well as to clarify the purpose of these criteria. These changes also provide consistency with the corresponding " minimum" design criteria, for an MRS, in Part 72.

Section 60.131. General desian criteria for the aeologig reoository operations area.

Consistent with the modifications to S60.130, as described above, the Commission is deleting the reference to " Structures, l systems, and components important to safety," in the title of 1

S60.131(b), and re-numbering the current criteria in l SS 60.131 (b) (1) through 60.131(b) (10) , as appropriate. This l l

change eliminates the confusion in the existing rule related to  ;

l the identification of only the criteria in S60.131(b) as "important to safety." It also resolves the present incongruity l with S60,131(b) (7) , " criticality control," regarding the reference to waste " isolation" (a postclosure term) in the requirement.

l The current rule employs the term " normal and accident conditions," or similar expression, in several places. However, the conditions that must be addressed under this language are not well-defined. The Commission is remedying this situation by replacing current terminology with references to " design basis events," thereby ensuring that the design appropriately takes into account the consequences of all design basis events 36

i l

(i.e.,1as discussed in this document, Category 1 and 2 design basis events). Accordingly, paragraphs (b) (5) (i) , (b) (7) , and )

(b) (8) are modified for this section. The Commission also is revising the language in S60.131(b) (1) , which refers to

" anticipated" natural phenomena and environmental conditions, so as to encompass all design basis events. The "necessary safety functions" that must be accommodated in the design, pursuant to l

that paragraph, include whatever is necessary to meet the quantitative limits set out in the Commission's rules (i.e., in

$60.111(a) and $60.136).

l As discussed under "Public Comments on the Proposed Rule," i I

the Commission considers the applicability of the criticality control requirements in'S60.131(h) to be clear with respect to preclosure considerations. The Commission also believes that uncertainty remains with respect to the applicability of the l l

criticality control requirements to the postclosure period. The Commission intends to address the remaining uncertainty in a l

future rulemaking to make the NRC requirements consistent with 1 1

i the revised EPA standards that are currently under development, as mandated by the Energy Policy Act of 1992.

Section 60.132. Additional desian criteria for surface facilities in the aeoloaic repository operations area.

1 37 j I

1 l

1 Section 60.132 (c) (1) requires that the surface facilities must be "... designed to control the release of radioactive materials in effluents during normal operations so as to meet the performance objectives of S60,111(a)." The design should ordinarily be sufficient to provide reasonable assurance of meeting Part 20 not only during normal operations, but even for events that are likely to occur moderately frequently or one or more times before permanent closure of the geologic repository (i.e., all Category 1 design basis events). Deleting the phrase "during normal operations," broadens the scope of this provision to reflect the Commission's intent more accurately.

The amendment of S60.132 adopted in this final rule differs from the amendment of S60.132 in the proposed rule in that the phrase "in effluents" in the proposed rule was changed to "in effluents during Category 1 design basis events" in the final rule. The rationale for this change was discussed in the

" Response to Public Comments on the Proposed Rule."

Section 60.133. Additional desian criteria for the undercround facility.

As in the case of the changes to 10 CFR 60,131, a reference to design basis events is substituted for the less precise

" normal operations and ... accident conditions."

38

l l l

Section 60.136. Preclosure controlled area.

l i l The final rule adopts the petitioner's concept of a preclosure control area under the name "preclosure controlled  ;

area." The term delimits an area over which the licensee l

l exercises control of activities to meet regulatory requirements, l

Control would include the ability to exclude members of the t

public, if necessary. The zone, and related dose limits, would also be used to analyze and identify structures, systems, and components that are important to safety under unusual conditions that have heretofore been characterized as Category 2 design basis events - credible, yet not likely to occur during the period of operations. The issue that is presented concerns the dose limits to ensure that :he consequences of any events which i occur present no unreasonable risk to the health and safety of i

l the public. (Releases resulting from Category 1 design basis events would not be permitted to cause doses exceeding the limits of Part 20.) The Commission adopts the basic provisions of Part 72 - namely, a 0.05 SV (5 rem) dose limit, on or beyond the preclosure controlled area boundary - as modified to reflect the Part 20 system of dose limits (see S20.1201[a]). In addition to providing for separate dose limits for individual organs and  ;

tissue, the lens of the eye, and the skin, the use of " total effective dose equivalent" (TEDE) in Part 20 explicitly accounts I

for exposures via the ingestion and inhalation dose pathways.

39 I

Modification of the 0.05 Sv (5 rem) dose limit, to reflect the Part 20 system of dose limits, results in a family of dose limits: a TEDE of 0.05 Sv (5 rem); or the sum of the deep-dose equivalent and the committed dose equivalent to any individual organ or tissue (other than the lens of the eye) of 0.5 Sv l (50 rem); an eye dose equivalent of 0.15 Sv (15 rem); and a l shallow dose equivalent, to skin, of 0.5 Sv (50 rem).2 The eye and skin dose limits are adequate to ensure that no observable effects (e.g., induction of cataracts in the lens of the eye) will occur as a result of any accidental radiation exposure. In implementing this provision, dose calculations should be made solely with roterence to the consequence of the specific Category 2 design basis event, not cumulatively with other design basis events. To clarify this matter further, the analysis of a specific Category 2 design basis event would require an analysis which includes an initiating event (e.g., an earthquake) and the associated combinations of repository system or component failures that can potentially lead to exposure of the public to radiation. An example design basis event is a postulated earthquake (the initiating event) which results in: (1) the failure of a crane lifting a spent fuel waste package inside a waste handling building, (2) damage to the building ventilation filtration system, (3) the drop and breach of the waste package, (4) damage to the spent fuel, (5) partitioning.of a fraction of 2

Radiation exposure terminology is as used in Part 20 (56 FR 23360; May 21, 1991).

40

4 the radionuclide inventory to the building atmosphere, (6) release of some radioactive material through the damaged ventilation filtration system, and (7) public exposure to the released radioactive material. It should be noted that it is not necessary to assume multiple failures of safety-related systems unless these multiple failures are credible consequences of the initiating event. An analysis of a specific event for a real ,

repository would be dependent on the particular features of the facility design and related operating procedures. In general, credit for the proper functioning of repository structures, I

systems, and components in an analysis would be commensurate with ,

the merits of the design. In the example cited above, a waste package designated "important to safety" would not necessarily be i  !

l assumed to breach in a drop event if the maximum hypothetical i l

drop falls within the design parameters of the waste package to withstand such an event. Similarly, repository ventilation ,

filtration systems would be analyzed for their capability to withstand natural phenomena (e.g., earthquakes) and detect, isolate, or filter radioactive material in ventilation flow.

l The only other noteworthy deviation from Part 72 is to refer

! in S60.136 to doses attributable to any " category 2 design basis I

l event" whereas the corresponding section (i.e., 10 CFR 72.106) in l

Part 72 refers to doses attributable to any " design basis accident." The term " design basis event" is used because it is a defined term in Part 60. The change in terminology is not i

2 41 l

l

intended to be one of substance as Category 2 design basis events would generally be considered as accidents.

The 0.05 SV (5 rem) dose limit is being adopted by the Commission as the apptvpriate design basis for protection of public health and safety from Category 2 design basis events at a 1 i

GROA and will harmonize Part 60 with Part 72. In this regard, the commission notes that Part 72 applies to those facilities (MRS installations) most similar to the surface facilities of a ,

repository and for which the kinds of design basis events are also expected to be similar. Further, the dose limit is

{

consistent with dose values (0.06 Sv [6 rem) to the whole body) ,

I established as guidance for both fuel-handling accidents and spent-fuel cask-drop accidents at nuclear power plants.' {

Moreover, the dose limit is consistent with the accident-dose l value (0.05 Sv [5 rem) effective dose equivalent) proposed by DOE l in its PRM.

However, while consistency between the proposed 0.05 Sv (5 rem) dose limit for Part 60 and other Commission rules or guidance documents is important, consistency alone does not necessarily ensure that there would be no unreasonable risk to ,

the health and safety of the public associated with the proposed limit. As such, a perspective is provided on the risks l

l 3 NUREG-0800, " Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants," June 1987. l

)

42 l

l l

i 2

l associated with an operational repository and the appropriateness of the proposed 0.05 Sv (5 rem) dose limit as the design basis for protection of public health and safety from Category 2' design I hasis events. l Based on estimates provided by the National Council on ,

Radiation Protection and Measurements', the lifetime risk to individuals in the general population is 0.05 fatal cancers per Sv of exposure. Therefore, the lifetime risk of fatal cancer from an assumed 0.05 SV (5 rem) exposure resulting from a 2.5 x  :

postulated Category 2 design basis event is 0.0025 (i.e., '

10'3) per individual exposed. While this assessment provides perspective on the risk associated with a hypothetical exposure of a 0.05 Sv (5 rem) dose, it does not provide perspective on the l I

estimated actual risk associated with the spectrum of possible Category 2 design basis events at a repository during its operational lifetime (estimated to be about 100 years).

Perspective on actual risk must include consideration of the frequencies (i.e., probabilities) of occurrence of these events, as well as their consequences, as " risk" is defined as "the With respect to l

probability of an event times its consequences."

the the range of probabilities of Category 2 design basis events, 1

l ,

' National Council on Radiation Protection and Measurements, " Risk i

' Estimates for Radiation Protection," NCRP Report No. 115, December 31, 1993.

43 ,

I

upper bound is roughly 1 x 10-2 per year (i.e., events with probabilities of occurrence greater than 1 x 10-2 per year would generally be considered to be Category 1 events). Accordingly, assuming event consequences equivalent to the 0.05 Sv (5 rem) dose limit for Part 60, the hypothetical upper bound on individual risk is 2.5 x 10 4 fatal cancers per year. To put j i

this risk in perspective, the International Commission on Radiological Protections notes that, based on a review of information related to risks regularly accepted in everyday life a

for stochastic phenomena, a fatal cancer risk in the range of 1 x 10~' to 1 x 10 4 per year from exposure to radiation would 1 I

likely be acceptable to individual members of the public. Thus, while the risk associated with the consequences of a repository event at the dose limit and upper bound probability of occurrence l

exceeds this range by a small factor, and is at a level that the f Commission considers safe for occupational exposures, the Commission believes this result significantly overestimates the actual risk of an operating repository. Similarly, the Commission considers that the lower bound of category 2 design basis events is on the order of 1 x 10 per year (i.e., events with probabilities of occurrence less than 1 x 10-6 per year would generally be screened from further consideration due to ,

their negligible contribution to overall risk). In the proposed rule (March 22, 1995; 60 FR 15180), the Commission had considered l l

5 Recommendations of the International Commission on Radiological Protection. ICRP Publication 26, January 1977.

l 44

- ._ _ - _.. . . - . _ ~ - . . ~ . - . . - - - .

o' t

a probability of occurrence of 1 x 10 ' per year as an appropriate lower bound. However, upon further analysis as discussed below, the Commission considers that a lower bound of j

! 1 x 10" per year is too low and unjustified, and that a lower bound of 1 x 10 4 per year is appropriate. Screening out events 1

with probabilities of less than 1 x 10-' is expected to provide conservative estimates of risk. A higher screening criterion could probably be justified given the magnitude of the consequences and risks from this facility, but this criterion is not expected to cause an excessive analytical burden for 4

demonstating compliance with S60.136, consistent with the 3

- Commission's guidance on the application of probability risk k assessment methods in licensing. It is important to note that the arguments advanced for this screening criterion apply solely  ;

I to the period of repository operations before permanent closure.

l Assuming bounding repository event consequences of roughly  !

0.2 SV (20 rem), a lifetime risk to individuals in the general i population of 0.05 fatal cancers per sv of exposure, and a lower bound of 1 x 10 4 per year for the probability of occurrence of a

Category 2 design basis events, the estimated risk of cancer f atality from these low probability events would be 1 x 10-8

> per year. Events which result in risks at or below this l level do not contribute significantly to repository risk to an

^

45 k i d

individual and, as such, can be neglected in the overall risk assessment.

l Perspective on actual repository risk can be obtained by developing an understanding of the spectrum of potential Category 2 design basis events and estimating the consequences of these sequences, as well as their probabilities of occurrence.

In this regard, the Commission recognizes that there is no  :

l high-level waste repository operating experience, and that only  !

l conceptual designs have been developed for these facilities.

1

\

Nonetheless, some perspective can be gained from the preliminary l

risk assessment by DOE' of a conceptual design for a repository at Yucca Mountain, Nevada, as well as from consideration of risk l assessments of selected U.S. nuclear power plants.7 l

l Consistent with risk assessments for nuclear power plants,  !

l the spectrum of possible repository design basis events includes i

both internally and externally initiated events. Internally initiated events would include waste transporter collisions, crane failures or other types of fuel assembly, waste package or cask drop events, building or facility exhaust filter fires, and exhaust filter bypass or failure. Externally initiated events l

U.S. Department of Energy, " Site Characterization Plan, Yucca l Mountain Site, Nevada Research and Development Area, Nevada,"

00E/RW-0199, December 1988.

7 NUREG-1150, " Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants," December 1990.

46 I

l l

\

would include those resulting from earthquakes, tornados, and flooding. Regardless of the type or nature of the initiating event, the commission believes that, for several reasons, both the variety of credible events and the resulting potential consequences to members of the public will be somewhat limited at repository facilities. First, in comparison with a nuclear power plant, an operating repository is a relatively simple facility in  !

i which the primary activities are waste receipt, handling,  !

storage, and emplacement. A repository does not require the variety and complexity of active systems necessary to support an operating nuclear power plant. Further, the conditions are not present at a repository to generate a radioactive source term of  ;

a magnitude that, however unlikely, is potentially capable at a ,

nuclear power plant (e.g., from a postulated loss of coolant event). As such, the estimated consequences resulting from M

limited source term generation at a repository would be  !

correspondingly limited. This conclusion is consistent with the results of the aforementioned preliminary risk assessment by DOE l l

of a conceptual repository design at Yucca Mountain, Nevada. In l

that assessment, DOE considered 149 events for a variety of internally and externally initiated events. Of the 149 events, only 7 resulted in offsite doses in excess of 0.005 SV (0.5 rem) to the critical organs of a maximally exposed individual and also had associated probabilities of occurrence greater than 1 x 10 4 per year. The highest estimated offsite dose from the DOE risk 47

\

assessment was 0.021 SV (2.1 rem) with an associated probability of occurrence of 5 x 10-7 per year.

The dose estimates of the DOE risk assessment are only 1 I

reflective of a conceptual design for a repository at Yucca f Mountain, Nevada. Nonetheless, the Commission believes they provide perspective on the magnitude of the estimated consequences to members of the public from postulated Category 2 design basis events, and that variations in repository design or  !

l site selection would not likely vary these estimates by more than l l'

an order of magnitude. The results of the DOE risk assessment also provide some perspective on the estimated probabilities of l occurrence of the postulated repository design basis events and, as such, perspective on actual risk from an operating repository.

In general, the Commission would expect the potential higher consequence events to have correspondingly lower probabilities of occurrence. This expectation is consistent with the results of the DOE risk assessment as the estimated probabilities of occurrence for the seven events which resulted in offsite doses in excess of 0.005 Sv (0.5 rem) vary from 1 x 10-' to 5 x 10-6 per year. The corollary to this is the expectation that higher frequency events would have correspondingly lower offsite consequences, and perspective on actual risk from an operating repository necessitates consideration of these events, as well as lower frequency events. Review of the DOE risk assessment 48

1 indicates that some higher frequency, but lower consequence, 4

events are just as important to actual risk as the lower frequency, but higher consequence, events. With respect to .

l

, actual risk from the broad spectrum of all events considered in 5

the DOE risk assessment, the estimated actual risk of an j l

operating repositary is roughly two to three orders of magnitude i l lower than the range of fatal cancer risks that would likely be ,

1 acceptable to members of the public (i.e., a fatal cancer risk of 1

l 1 x 10 to 1 x 10-5 per year as noted in ICRP Publication 26).  ;

1

, l With respect to the appropriateness of the proposed 0.05 SV (5 rem) dose limit for Part 60 as the design basis for protection of public health and safety from Category 2 design basis events, the DOE risk assessment indicates the potential for events with i

I offsite consequences on the order of several hundredths to several tenths of Sv (several rem to several tens of rem),

depending on design and siting factors. The event consequences in this range, coupled with the estimated event probabilities of occurrence, result in estimated risks that would likely be l l

acceptable to members of the public. However, given the lack of repository design, siting and operating experience and the '

l supporting data base for probabilistic risk assessment, the Commission believes there is considerable uncertainty in the 1

estimates of both the consequences and the probabilities of  ;

occurrence of postulated Category 2 design basis events. As 1

such, the Commission believes that establishing a dose limit in i 1

1 49 l i

l l

Part 60 to the 0.05 SV (5 rem) value would provide an adequate l

margin of safety and an appropriate design basis for protection of members of the public from unlikely, but credible events.

Further, the Commission believes that a single dose limit is appropriate for the uroad range of possible event frequencies, l given the limited potential for offsite consequences at repository facilities. ,

l Lastly, the amendments of S60.136 adopted in this final rule )

i differ slightly from the amendments of S60.136 proposed in the ,

l proposed rule (60 FD 15180) in that the phrase "on or beyond the i

nearest boundary" in the proposed rule was changed to "on or

]

beyond any point on the boundary" in the final rule and the )

phrase "may not exceed" in the proposed rule was changed to "shall not exceed" in the final rule. The rationale for the )

i latter change is to improve clarity and the rationale for the former change was discussed earlier in the " Response to Public Comments on the Proposed Rule."

Section 60.183. Criminal Denalties.

In the proposed rule, a conforming change was made to this section to include $60.136 (pertaining to the preclosure controlled area) among the regulations that are not issued under Sections 161b, 1611, or 161o of the Atomic Energy Act, for purposes of Section 223 of the Act. On reconsideration, the s

50

l o Commission.has decided not to revise this section (i.e., criminal- )

I penalties are authorized for violations of 560.136). q

'l l

Small Business Regulatory Enforcement Fairness Act )

i In accordance with the Small' Business Regulatory Enforcement  :

Fairness Act of 1996, the NRC has determined that this action is f not a major rule and has verified this determination with the Office of Information and Regulatory Affairs of OMB. f Environmental Impact: Categorical Exclusion l i

The NRC has determined that this .agulation is the type of'  !

i action described in 10 CFR 51.22 (c) (2) , pertaining to the  !

I promulgation of technical requirements and criteria that the  !

Commission will apply in approving or disapproving applications under Part 60. Therefore, neither'an environmental impact. j statement nor an environmental assessment has been prepared for i i

this final rule. .

e i

Paperwr4x Reduction Act Statement l

This final rule does not contain a new or amended j information collection requirement subject to the Paperwork l

Reduction Act of 1995 (44 U.S.C. 3501, et sea.). Existing j t

requirements'were approved by OMB, approval number 3150-0127. j 51 l

1

. 3 i

l Public Protection Notification The NRC may not conduct or sponsor, and a persr5 is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Regulatory Analysis The Commission has prepared a regulatory analysis on this final rule. The analysis examines the costs and benefits of the alternatives considered by the Commission. The analysis is I available for inspection in the NRC Public Document Room, 2120 L Street NW (Lower Level), Washington, DC. Single copies of the .aalysis may be obtained from Dr. Richard A. Weller, U.S.

Nuclear Regulatory Commission, Office of Nuclear Material Safety and Safeguards, Division of Waste Management, Washington, DC 20555, Telephone (301) 415-7287.

Regulatory Flexibility Certification  !

l l

l As required by the Regulatory Flexibility Act of 1980,  !

l 5 U.S.C. 605(b), the Commission certifies that this rule will not l

have a significant economic impact on a substantial number of small entities. The only entity subject to regulation under this rule is DOE.

52

Backfit Analysis The NRC has determined that the backfit rule, 10 JFR 50.109, i does not apply to this final rule and, therefore, that a backfit analysis is not required for this final rule, because these amendments do not involve any provisions that would impose backfits as defined in 10 CFR 50.109 (a) (1) .

List of Subjects in 10 CFR Part 60 i

Criminal penalties, High-level waste, Nuclear power plants and reactors, Nuclear materials, Reporting and record-keeping requirements, and Waste treatment and disposal.

For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; the Nuclear Waste Policy Act of 1982, as amended; and 5 U.S.C. 552 and 553, the NRC is adopting the following amendments to Part 60.

53

s' PART 60 - DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES i

1. The authority citation for Part 60 is amended to read as follows.:

Authority: Secs. 51, 53, 62, 63, 65, 81, 161, 182, 183, ,

68 Stat. 929, 930, 932, 933, 935, 948, 953, 954, as amended (42 U.S.C. 2071, 2073, 2092, 2093, 2095, 2111, 2201, 2232, 2233);

secs. 202, 206, 88 Stat. 1244, 1246 (42 U.S.C. 5842, 5846);

secs. 10 and 14, Pub. L.95-601, 92 Stat. 2951 (42 U.S.C. 2021a 1 and 5851); sec. 102, Pub. L.91-190, 83 Stat. 853 (42 U.S.C.

4332); secs. 114, 121, Pub. L.97-425, 96 Stat. 2213g, 2228, as amended (42 U.S.C. 10134, 10141), and Pub. L. 102-486, sec. 2902, 106 Stat. 3123 (42 U.S.C. 5851).

2. Section 60.2 is amended by adding definitions of " Design bases," " Design basis events," and "Preclosure controlled area,"

revising the definitions of " Accessible environment," " Disturbed l

zone," "Important to safety," and " Site," revising the name of the defined term " Controlled area" to "Postclosure controlled area" and presenting this renamed term without change for the convenience of the user, and alphsbetizing the definitions to read as follows:

i 1

, 54

_ __ - ~.

I 560.2. Definitions.

Accessible environment means (1)' The atmosphere; '

(2) The land surface;

]

(3) Surface water; I

, (4) Oceans; and ,

(5) The portion of the lithosphere that is outside the ).

postclosure controlled area.

)

]

Desian bases means that information that identifies the l

[ specific functions to be performed by a structure, system, or i

i component of a facility and the specific values or ranges of l

values chosen for controlling parameters as reference bounds for l

design. These values may be restraints derived from generally  ;

( accepted " state-of-the-art" practices for achieving functional l

l goals or requirements derived from analysis (based on calculation or experiments) of the effects of a postulated event under which l

a structure, system, or component must meet its functional goals.

The values for controlling parameters for external events l

. include:

(1) Estimates of severe natural events to be used for deriving design bases that will be based on consideration of historical data on the associated parameters, physical data, or analysis of upper limits of the physical processes involved; and

. 55 i

i i

h

J l (2) Estimates of severe external man-induced events, to be used for deriving design bases, that will be based on analysis of human activity in the region, taking into account the site i

characteristics and the risks associated with the event. l Desian basis events means:

(1) (1) Those natural and human-induced events that are reasonably likely to occur regularly, moderately frequently, or one or more times before permanent closure of the geologic repository operations area; and I

(ii) Other natural and man-induced events that are considered unlikely, but sufficiently credible to warrant consideration, taking into account the potential for significant radiological impacts on public health and safety.

(2) The events described in paragraph (1) (i) of this definition are referred to as " Category la design basis events.

The events described in paragraph (1) (11) of this definition are referred to as " Category 2" design basis events.

Disturbed zone means that portion of the postclosure controlled area, the physical or chemical properties of which have changed as a result of underground facility construction or as a result of heat generated by the emplaced radioactive wastes, such that the resultant change of properties may have a significant effect on the performance of the geologic repository.

56

Imoortant to safety, with reference to structures, systems, and components, means those engineered features of the repository whose function is:

(1) To provide reasonable assurance that high-level waste can be received, handled, packaged, stored, emplaced, and retrieved without exceeding the requirements of $60.111(a) for-Category 1 design basis events; or (2) To prevent or mitigate category 2 design basis events that could result in doses equal to or greater than the values specified in S60.136 to any individual located on or beyond any point on the boundary of the preclosure controlled area.

  • * * *
  • l Postclosure controlled area means a surface location, to be ,

marked by suitable monuments, extending horizontally no more than 10 kilometers in any direction from the outer boundary of the underground facility, and the underlying subsurface, which area i has been committed to use as a geologic repository and from which incompatible activities would be restricted following permanent ,

I closure.

Preclosure controlled area means that surface area surrounding the geologic repository operations area for which the licensee exercises authority over its use, in accordance with the 57

o' provisions of this part, until permanent closure has been completed.

1

, i Restricted arga means an area, access to which is limited by l l I the licensee for the purpose of protecting individuals against undue risks from exposure to radiation and radioactive materials.

Restricted area does not include areas used as residential i

j quarters, but separate rcoms in a residential building may be set aside as a restricted area.

Site means the location of the preclosure controlled area,  ;

I or of the postclosure controlled area, or both.  ;

i j

Unrestricted area means an area, access to which is neither 1

limited nor controlled by the licensee.

i t * * * *

  • i

+

1 l 3. Section 60.8 is revised to read as follows:

i  !

$60.8 Information Collection Requirements: Approval.

I (a) The Nuclear Regulatory Commission has submitted the  !

l information collection requirements of general applicability l 4-

]

l' contained in this part to the Office of Management and Budget for

\

approval as required by the Paperwork Reduction Act of 1995 i

, (44 U.S.C. 3501, et sec.). The Office of Management and Budget 58 l

l

l E

has approved the information collection requirements. contained in this part under control number 3150-0127.

l i

i (b) The approved information collection requirements contained in this part appear in SS60.62, 60.63, and 60.65.

I

4. In $60.21, paragraphs (c) (1) (1) , (c) (1) (ii) (B) , (c) ( 3 ) , ;

and (c) (8) are revised to read as follows: ,

S60.21. content of application.

(c) * * *

(1) *

(i) The description of the site shall also include the ,

i following information regarding subsurface conditions. . This description shall, in all cases, include this information with ,

respect to the postclosure controlled area. In addition, where 4 i

subsurface conditions outside the postclosure controlled area may l

affect isolation within the postclosure controlled area, the i description shall include information with respect to subsurface conditions outside the postclosure controlled area to the extent the information is relevant and material. The detailed information referred to in this paragraph shall include:

(A) The orientation, distribution, aperture in-filling and origin of fractures, discontinuities, and heterogeneities; 59

(B) The presence and characteristics of other potential pathways such as solution features, breccia pipes, or other potentially permeable features; (C) The geomechanical properties and conditions, including pore pressure and ambient stress conditions; (D) The hydrogeologic properties and conditions; r

(E) The geochemical properties; and (F) The anticipated response of the geomechanical, hydrogeologic, and geochemical systems to the maximum design thermal loading, given the pattern of fractures and other discontinuities and the heat transfer properties of the rock mass and groundwater. .

1 1

(ii) * * *

(B) Analyses to determine the degree to which each of the favorable and potentially adverse conditions, if present, has J been characterized, and the extent to which it contributes to or detracts from isolation. For the purpose of determining the presence of the potentially adverse conditions, investigations shall extend from the surface to a depth sufficient to determine critical pathways for radionuclide migration from the underground facility to the accessible environment. Potentially adverse 60

conditions shall be investigated outside of the postclosure controlled area if they affect isolation within the postclosure controlled area.

(3) A description and analysis of the design and performance requirements for structures, systems, and components of the gcologic repository that are important to safety. The analysis must include a demonstration that --

(i) The requirements of S60.111(a) will be met, assuming occurrence of Category 1 design basis events; and j (ii) The requirements of $60.136 will be met, assuming j occurrence of Category 2 design basis events.

(8) A description of the controls that the applicant will 1

apply to restrict access and to regulate land use at the site and adjacent areas, including a conceptual design of monuments which would be used to identify the postclosure controlled area after permanent closure.

S60.43 [ Amended) I l

5. In S60. 4 3 (b) (5) , the term " controlled area" is revised to read "postclosure controlled area."

S60.46 [ Amended]

61

4 o'

6. In S60.46(a) (3) , the term " controlled area" is revised to read "postclosure controlled area."

S60.51 (Amended]

7. In S60.51(a) (2) (1) and (a) (2 ) (ii) , the term " controlled area" is revised to read "postclosure controlled area."

S60.102 [ Amended]

8. In $60.102(c), the term " controlled area" is revised to read "postclosure controlled area."
9. In 560.111, paragraph (a) is revised to read as follows:

560.111. Performance of the geologic repository operations area through permanent closure.

(a) Protection acainst radiation exposures and releases of radioactive material. The geologic repository operations area shall be designed so that until permanent closure has been completed, radiation exposures and radiation levels, and releases of radioactive materials to unrestricted areas, will be maintained within the limits specified in Part 20 of this chapter and such generally applicable environmental standards for 62

4 radioactivity as may have been established by Environmental Protection Agency.

$60.121 [ Amended)

10. In S60,121(a) and (b), the term " controlled area" is revised to read "postclosure controlled area."

S60.122 [ Amended)

11. In S60.122 (b) (6) and (c), the term " controlled area" is revised to read "postclosure controlled area."

w * * * *

12. Section 60.130 is revised to read as follows:

560.130 General considerations.

Pursuant to the provisions of S60.21(c) (2) (i) , an application to receive, possess, store, and dispose of high-level i

radioactive waste in the geologic repository operations area must  !

l include the principal design criteria for a proposed facility.  !

The principal design criteria establish the necessary design, l fabrication, construction, testing, maintenance, and performance requirements for structures, systems, and components important to safety and/or important to waste isolation. Sections 60.131 through 60.134 specify minimum requirements for the principal 63

e 1

design criteria for the geologic repository operations area.
These design criteria are not intended to be exhaustive.

i However, omissions in SS60.131 through 60.134 do not relieve DOE from any obligation to provide such features in a specific facility needed to achieve the performance objectives.

13. In S60.131, paragraph (b) is revised, and paragraphs (c) through (k) are added to read as follows:

560.131. General design criteria for the geologic repository 5 operations area.

1 (b) Protection acainst desian basis events. The structures, systems, and components important to safety shall be designed so j that they will perform their necessary safety functions, assuming occurrence of design basis events.

ll (c) Protection aaainst dynamic effects of eculoment failure and similar events. The structures, systems, and components important to safety shall be designed to withstand dynamic effects such as missile impacts, that could result from equipment failure, and similar events and conditions that could lead to loss of their safety functions.

(d) Protection aaainst fires and explosjons.

64 ,

(1) The structures, systems, and components important to l l

, safety shall be designed to perform their safety functions during i and after credible fires or explosions in the geologic repository i

operations area. l l

l (2) To the extent practicable, the geologic repository operations area shall be designed to incorporate the use of noncombustible and heat resistant materials.

i i

(3) The geologic repository operations area shall be designed to include explosion and fire detection alarm systems and appropriate suppression systems with sufficient capacity and 1

capability to reduce the adverse effects of fires and explosions  ;

on structures, systems, and components important to safety.

(4) The geologic repository operations area shall be designed to include means to protect systems, structures, and components important to safety against the adverse effects of either the operation or tailure of the fire suppression systems.

I 1

(e) Emeroency caoability.

l l

1 (1) The structures, systems, and components important to safety shall be designed to maintain control of radioactive waste and radioactive effluents, and permit prompt termination of operations and evacuation of personnel during an emergency.

65

l

(2) The geologic repository operations area shall be i ,

designed to include onsite facilities and services that ensure a safe and timely response to emergency conditions and that facilitate the use of available offsite services (such as fire, police, medical, and ambulance service) that may aid in recovery l from emergencies.

(f) Utility services.

(1) Each utility service system that is important to safety shall be designed so that esser,tial safety functions can be performed, assuming occurrence of the design basis events.

(2) The utility services important to safety shall include redundant systems to the extent necessary to maintain, with adequate capacity, the ability to perform their safety functions.

(3) Provisions shall be made so that, if there is a loss of the primary electric power source or circuit, reliable and timely emergency power.can be provided to instruments, utility service sy>tems, and operating systems, includihg alarm systems, important to safety.

(g) Inspection, testina. and maintenance. The structures, systems, and components important to safety shall be designed to i 66

permit periodic inspection, testing, and maintenance, as necessary, to ensure their continued functioning and readiness. [

(h) Criticality control. All systems for processing, transporting, handling, storage, retrieval, emplacement, and i isolation of radioactive waste shall be designed to ensure that nuclear criticality is not possible unless at least two unlikely, independent, and concurrent or sequential changes have occurred in the conditions essential to nuclear criticality safety. Each system must be designed for criticality safety assuming occurrence of design basis events. The calculated effective multiplication factor (k.rr) must be sufficiently below unity to show at least a 5 percent margin, after allowance for the bias in the method of calculation and the uncertainty in the experiments  ;

i used to validate the method of calculation.

I i

l (i) Instrumentation and control systems. The design shall include provisions for instrumentation and control systems to )

monitor and control the behavior of systems important to safety,  !

assuming occurrence of design basis events.

(j) Comoliance with minina reaulations. To the extent that DOE is not subject to the Federal Mine Safety and Health Act of 1977, as to the construction and operation of the geologic 1

repository operations area, the design of the geologic repository I operations area shall nevertheless include provisions for worker 67

e' protection necessary to provide reasonable assurance that all structures, systems, and components important to safety can perform their intended functions. Any deviation from relevant design requirements in 30 CFR, Chapter I, Subchapters D, E, and N will give rise to a rebuttable presumption that this requirement has not been met.  ;

I (k) Shaft convevances used in radioactive waste handlina.

i (1) Hoists important to safety shall be designed to preclude cage free fall.

(2) Hoists important to safety shall be designed with a reliable cage location system.

i l

(3) Loading and unloading systems for hoists important to j l

safety shall be designed with a reliable system of interlocks l that will fail safely upon malfunction. l l

l (4) Hoists important to safety shall be designed to include two independent indicators to indicate when waste packages are in place and ready for transfer.

i l

14. In S60.132, paragraph (c) (1) is revised to read as follows:

1 1

68 1

l l

ce

i .

~

i S60.132. Additional design criteria for surface facilities in j the geologic repository operations area.

i l

s * * *

  • l (c) Radiation control and monitorina - (1) Effluent control.

The surface facilities shall be designed to control the release of radioactive materials in effluents during Category 1 design basis' events so as to meet the performance objectives of

$60.111(a).

15. In $60.133, the introductory texts of paragraph (g) and paragraph (g) (2) are revised to read as follows:

l S60.133 Additional design criteria for the underground facility.

(g) Underaround facility ventilation. The ventilation system shall be designed to:

(2) Assure the ability to perform essential safety functions assuming occurrence of design basis events.

16. A new undesignated center heading and S60.136 are added to read as follows:

Preclosure Controlled Area 69

w c

560.136 Preclosure controlled area.

^ l (a) A preclosure controlled area must be established for the geologic repository operations area.

s (b) The geologic repository operations area shall be designed so that, for Category 2 design basis events, no individual located on or beyond any point on the boundary of the i

preclosure controlled area will receive the more limiting of a total effective dose equivalent of 0.05 Sv (5 rem), or the sum of 1

2 the deep-dose equivalent and the committed dose equivalent to any L

individual organ or tissue (other than the lens of the eye) of  ;

i 0.5 SV (50 rem). The eye dose equivalent shall not exceed 0.15 Sv (15 rem), and the shallow dose equivalent to skin shall not exceed 0.5 Sv (50 rem) . The minimum distance from the surface facilities in the geologic repository operations area to I i the boundary of the preclosure controlled area must be at least l 100 meters. $

i I

(c) The preclosure controlled area may be traversed by a

)

highway, railroad, or waterway, so long as appropriate and effective arrangements are made to control traffic and to protect public health and safety. l 1

70 l 1

I

so M'

Dated in Rockville, Maryland, this day of , 1996.

For the Nuclear Regulatory Commission.

John C. Hoyle, Secretary of the Commission.

71 1

i