3F1196-26, Forwards Crystal River Unit 3,Corrective Action Plan Phase II (Mcap)

From kanterella
(Redirected from ML20135B805)
Jump to navigation Jump to search
Forwards Crystal River Unit 3,Corrective Action Plan Phase II (Mcap)
ML20135B805
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/27/1996
From: Kelley L
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135B807 List:
References
3F1196-26, NUDOCS 9612060048
Download: ML20135B805 (2)


Text

. _

i

~

l*a l

{

Florida Power CORPORATION 01~7a=*

November 27, 1996 3F1196-26 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555-0001

Subject:

Crystal River Unit 3 - Management Corrective Action Plan Phase II (MCAP II)

Dear Sir:

During the meeting between Florida Power Corporation (FPC) and the U.S. Nuclear Regulatory Commission on November 14, 1996, FPC committed to docket Revision 1 to the Crystal River Unit 3 Management Corrective Action Plan (MCAP), Phase II.

Attached herewith is the Crystal River Unit 3 MCAP II dated November 22, 1996.

Sincerely, l

Larry C. Ke le, Director Nuclear Operations Site Support I

LCK/FF Attachment xc:

Regional Administrator, Region II

. Dg ' g NRR Project Manager Senior Resident Inspector 9612060048 961127 DR ADOCK 0500 2

CRYSTAL RIVER cNERGY COMPLEX: 15760 W Power uno St. Crystal River, Florids 3442&6708 (352) 795 6486 A Fkwida Progress Cwnpany r

=

__m__..__

._.m

.._...m__.

_. _, ~,,

C*

e k

i l

1 l

CRYSTAL RIVER UNIT 3 MANAGEMENT CORRECTIVE i

l ACTION PLAN PHASE II (MCAP ll)

Rev.1 Nov. 22,1996

.