3F1196-26, Forwards Crystal River Unit 3,Corrective Action Plan Phase II (Mcap)

From kanterella
(Redirected from 3F1196-26)
Jump to navigation Jump to search
Forwards Crystal River Unit 3,Corrective Action Plan Phase II (Mcap)
ML20135B805
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/27/1996
From: Kelley L
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135B807 List:
References
3F1196-26, NUDOCS 9612060048
Download: ML20135B805 (2)


Text

. _

i

~

l*a l

{

Florida Power CORPORATION 01~7a=*

November 27, 1996 3F1196-26 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555-0001

Subject:

Crystal River Unit 3 - Management Corrective Action Plan Phase II (MCAP II)

Dear Sir:

During the meeting between Florida Power Corporation (FPC) and the U.S. Nuclear Regulatory Commission on November 14, 1996, FPC committed to docket Revision 1 to the Crystal River Unit 3 Management Corrective Action Plan (MCAP), Phase II.

Attached herewith is the Crystal River Unit 3 MCAP II dated November 22, 1996.

Sincerely, l

Larry C. Ke le, Director Nuclear Operations Site Support I

LCK/FF Attachment xc:

Regional Administrator, Region II

. Dg ' g NRR Project Manager Senior Resident Inspector 9612060048 961127 DR ADOCK 0500 2

CRYSTAL RIVER cNERGY COMPLEX: 15760 W Power uno St. Crystal River, Florids 3442&6708 (352) 795 6486 A Fkwida Progress Cwnpany r

=

__m__..__

._.m

.._...m__.

_. _, ~,,

C*

e k

i l

1 l

CRYSTAL RIVER UNIT 3 MANAGEMENT CORRECTIVE i

l ACTION PLAN PHASE II (MCAP ll)

Rev.1 Nov. 22,1996

.