Text
. _
i
~
l*a l
{
Florida Power CORPORATION 01~7a=*
November 27, 1996 3F1196-26 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555-0001
Subject:
Crystal River Unit 3 - Management Corrective Action Plan Phase II (MCAP II)
Dear Sir:
During the meeting between Florida Power Corporation (FPC) and the U.S. Nuclear Regulatory Commission on November 14, 1996, FPC committed to docket Revision 1 to the Crystal River Unit 3 Management Corrective Action Plan (MCAP), Phase II.
Attached herewith is the Crystal River Unit 3 MCAP II dated November 22, 1996.
Sincerely, l
Larry C. Ke le, Director Nuclear Operations Site Support I
LCK/FF Attachment xc:
Regional Administrator, Region II
. Dg ' g NRR Project Manager Senior Resident Inspector 9612060048 961127 DR ADOCK 0500 2
CRYSTAL RIVER cNERGY COMPLEX: 15760 W Power uno St. Crystal River, Florids 3442&6708 (352) 795 6486 A Fkwida Progress Cwnpany r
=
__m__..__
._.m
.._...m__.
_. _, ~,,
C*
e k
i l
1 l
CRYSTAL RIVER UNIT 3 MANAGEMENT CORRECTIVE i
l ACTION PLAN PHASE II (MCAP ll)
Rev.1 Nov. 22,1996
.