Monthly Operating Rept for June 1985
ML20135B430
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/30/1985
From: Smith P, Vandenberg D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8509110052
Download: ML20135B430 (4)


Text

...

OPERATING D4TA REPORT O

i DOCIET NO 50-255 DATE 07-08-85 1

COMPLETED BY PA5miti TELEPHONE (616)764-8913 OPERATING STATUS NOTES

'1.

Unit Name: Palisades 2.

Reporting Period:

850601-850630 3.

Licensed 'Aermal Power (MWt):

4.

Nameplate Rating (Gross MWe): __

2530 811.7 5.

Design Electrical Rating (Not MWe): _

805 6.

Maximum Dependable Capacity (Gross HWe): *675 7.

Maximus Dependable Capacity (Net NWe):

  • 635 8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9.

Power Level to Which Restricted, if any (Net MWe):

10.

Reasons for Restrictions, if any: __

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720
12. Number of Hours Reactor Was critical 720 4.343 118.622 4.343 65.152.7
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 720 4.317.7 61.932.6 15.

Unit Reserve Shutdown Hours 16.

Gross Thermal Energy Generated (MWE) 1.708.032 10.380.552 128.463.504

17. Gross Electrical Energy Generated (MWH) 540.570 3.324.960 39.942.750
18. Net Electrical Energy Generated (MWR) 512.013 3.154.074 37.593.637
19. Unit Service Factor 100.0 99.4 52.2
20. Unit Availability Factor 100.0 99.4 52.2
21. Unit Capacity Factor (Using MDC Net) 112.0-114.4 49.9 22.

Unit Capacity Factor (Using DER Net) as.3 90.2 39.4

23. Unit Forced Outage Rate 0

0.6 31.9 24.

Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):

Refuelina Outane scheduled to commence December 1.1985 j

25.

If Shut Down at End of Report Period, Estimated Date of Start Up:

26. Units in Test $tstus (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C0t9fERCIAL OPERATION

  • Based on condenser backpressure b

8509110052 850630 Y

OC0185-00015-OP03 PDR ADOCK 05000255

\\

R PDR l

m _

S murr ND.

50-155 INIT emenmarl AS MEgg ansrrrfMEL WIT EtM Palfa=ame at2E G7-08-85 CWWEEIID.W Manith REN RI MNrII June 1985 TE N (616)-766-991.3 no.

Bete Type Durattom n=====

Method of Licenses Q

e.

Comme & corrective I

(Bouro) h eting h

M M

Mhw 5

{

3, Damn anector ampert e Free t mecurrence l

4 850628 8

0 5

4 Peuer seemetica to add ett to primary eseisme pump P-See and to perform siscels -

meta m activittee.

1.

2 3.

4 5.

F: Fbeced Reasear Ruthods Ishibit C - 1eetractions Ruhibit I - Some Source Sa m iaa A-Eysipumat Philure (Emplais) 1-Mmumm1 for Preparettee of Data D-lent-er Test 2-as,==at Ser m Ehtry %sete for Licensee C-Refueling 3-h ea==ric Ser m Bwent Report (IER) File D-amplatory Beatrictise 4-Other (Empleta)

(IEEEG-0161) l E-Operater Training & License n===t== tion F-W aistrative O W iesel Error (Emplaim)

(9/77)

E-Other (Baylata) 1 OCOL85-0001D-Ore 3

o AVERAGE DAILY UNIT POWER LEVEL 8

DOCERT No 50-255 UNIT Palisades DATE 07-08-85 COMPLETED BY PA8mith TELEPHONE (616)?64-8913 NONTH June 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Net)

(MWe-Net) 1 746 17 747 2

748 18 752 3

750 19 751 4

755 20 752 5'

754 21 737 6

751 22 738 O

7 748 23 735 8

717 24 745 9

740 25 744 10 747 26 737 11 753 27 737 12 758 28 741 i

13 758 29 246 14 756 30 188 15 751 16 751 INSTRUCTIONS:

On this format, list the average daily unit power level in NWe-Net for each m

day in the reporting month.

Compute to the nestest whole megawatt.

i OC0185-0001C-0P03

f);[?n EI UJA 6'

SUMMARY

OF OPERATING EXPERIENCE FOR JUNE 1985 The Plant operated at approximately 98 percent power until June 8 at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> when power reduction began to perform turbine valve testing. The Plant was again at approximately 98 percent power 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> later.

Power remained essentially at this level until June 28 at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> when a scheduled power reduction to 25 percent power commenced to perform miscellaneous maintenance activities.

At the end of the reporting period, the plant was at 48 percent power and escalation to 98 percent power was in progress.

O m

OC0185-0001E-0P03 Era

- __ _ _ >Airca -

_ _ in reenatswt________ __ _.

mxcest mvmeat

ConSumtf8 l

^

Power company

,.n.u.. u..i,

217.o si.. si.,u..,,.i,.

.c.o u,..o.3 July 8, 1985 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 i

l LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Sumnary of Operating Experience for the Palisades Nuclear Pinnt for the month of June 1985.

  1. ewey. VanDenBars Reactor Engineer CC: KMEass, Palisades GHGoralski, Palisades JGreppler, USNRC JRSchepers, Palisades DJVandeWalle, P24-614B RAFenech, Palisades Resident Inspector, Palisades DLHackett, P11-228B LABrown, P21-317 GWBruckmann, Div of Radiological Henith Services, Lansing, Michigan SMierzwa, Michigan Dept of Labor l

RCallen, Michigan Public Service Cosmission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades EWRaciborski, P26-204A Document Control, 950*22*35*10/L GHG85*024 m

\\\\

i un enm twoomaaw

>