~Mr. Ge:rge'A. Hunger, Jr.
Director-Licansing, MC 62A-1 February 19, 1997 PECO Energy Company-1 Nuclear Group Headquarters
[
>l
[
Correspondence' Control Desk 3
P.O.~' Box No. 195 a+
l Wayne, PA 19087-0195 f
SUBJECT:
CONTROL ROD DRIVE CHARGING. WATER PRESSURE TECHNICAbSPECIFICATIONS, PEACH BOTTOM ATOMIC POWER STATION; UNITSi2 AND 3 (TAC,NOS. M96576 i
AND M96577)
+
j 1.
e i
e
(
.i
Dear Mr. Hunger:
i The Commission has issued 'the enclose'd Amendments Nos.218' and'221 to 4
Facility Operating Licensu Nos. DPR-44 and DPR-56'for,the Peach Bottom Atomic Power Station, Units 2 and 3.
These, amendments consist of changes to the Technical Specifications (TS) in response to your_, application dated August 27, 1996.
C'5 l
These amendments change the minimum allowable charging water header pressure-from a value of 955 psig to a.value;of 940 psig in TS 3.10.8, " Shutdown Margin
{
.(SDM) Test-Refueling."
You are requested to inform the staff.when you ~have implemented the provisions i-of these amendments.
A copy of the Safety Evaluation is also enclosed. ' Notice of Issuance will be included in the Commission's Bi-Weekly Federal Reaister Notice.
4-Sincerely, Original signed by I
Joseph W. Shea, Project Manager
)
l, Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277/278
Enclosures:
1.
Amendment No. 218 to DPR-44 2.
Amendment No. 221 to DPR-56 3.
Safety Evaluation gg g gg $h cc w/encls:
See next.page DISTRIBUTION:
Docket File M0'Brien CGrimes PUBLIC JShea JLyons PDI-2 Reading OGC ACRS SVarga
~
GHill(4)
WPasciak, RGN-I JStolz
- Previous Concurrence d
0FFICE Pdd2/CA PDI-b OGC
/'
SRXB/C PDI+2/D 3
NAME MOkrib JShe
[
JLyons JStolh DATE
\\/I/97
\\ /thh
> /3 #/97' I I/07/97
()l//f/97 0FFICIAL RECOR] COPY DOCUMENI NAME: G:\\SHEA\\ PEACH \\PB96576.AMD 280044 J.
1 4
.',.i
- 9703030022 9702F PDR ADOCK 05000277 P
PDR i.
~
s
~
Mr. Ge3rge A. Hunger, Jr.
Director-Licensing, MC 62A-1 February 19, 1997 i
PECO Energy Company Nuclear Group Headquarters l
Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195
SUBJECT:
CONTROL ROD DRIVE CHARGING WATER PRESSURE TECHNICAL SPECIFICATIONS, PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC NOS. M96576 AND M96577)
Dear Mr. Hunger:
The Commission has issued the enclosed Amendments Nos.218 and 221 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station, Units 2 and 3.
These amendments consist of changes to the Technical Specifications (TS) in response to your application dated August 27, 1996.
These amendments change the minimum allowable charging water header pressure from a value of 955 psig to a value of 940 psig in TS 3.10.8, " Shutdown Margin l
(SDM) Test-Refueling."
You are requested to inform the staff when you have implemented the provisions j
of these amendments.
A copy of the Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's Bi-Weekly Federal Reaister Notice.
Sincerely, Original signed by Joseph W. Shea, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II i
Office of Nuclear Reactor Regulation Docket Nos. 50-277/278
Enclosures:
1.
Amendment No. 218 to DPR-44 2.
Amendment No. 221 to DPR-56 3.
Safety Evaluation cc w/encls: See next page DISTRIBUTION:
Docket File M0'Brien CGrimes PUBLIC JShea JLyons PDI-2 Reading OGC ACRS SVarga GHill(4)
WPasciak, RGN-I JStolz
- Previous Concurrence d
0FFICE PD$2/CA PDI-b OGCo [
SRXB/C PD[-2/D NAME kNrtN '
JShah
[
JLyons
- JStok DATE
'I ((/97
) /1 k7 i /f /97 1/07/97 Ol//f/97 0FFICIAL RECORD COPY DOCUMENT NAME: G:\\SHEA\\ PEACH \\PB96576.AMD
i pa n o e
4 UNITED STATES f
E NUCLEAR REGULATORY COMMISSION E
f 3
WASHINGTON, D.C. 206:5 0001 8
i
\\,.. * * + p February 19, 1997 Mr. George A. Hunger, Jr.
Director-Licensing, MC 62A-1 PECO Energy Company i
Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195
SUBJECT:
CONTROL ROD DRIVE CHARGING WATER PRESSURE TECHNICAL SPECIFICATIO PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC NOS. M96576 AND M96577)
Dear Mr. Hunger:
The Commission has issued the enclosed Amendments Nos.218 and 221 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station, Units 2 and 3.
These amendments consist of changes to the Technical Specifications (TS) in response to your application dated August 27, 1996.
These amendments change the minimum allowable charging water header pressure from a value of 955 psig to a value of 940 psig in TS 3.10.8, " Shutdown Margin (SDM) Test-Refueling."
You are requested to inform the staff when you have implemented the provisions of these amendments.
A copy of the Safety Evaluation is also enclosed.
Notice of Issuance will be included in the Commission's Bi-Weekly Federal Reoister Notice.
Sinc r'ly, 4
i
^
se[tDirectorateI-2V. Shea, Project Manage Jo Pr )jyc Di/ision of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Hos. 50-277/278 l
Enclosures:
1.
Amendment No. 218 to DPR-44 2.
Amendment No. 221 to DPR-56 3.
Safety Evaluation l
cc w/encls: See next page i
I
_. ~. - _. _. __
_ ~. _ _ _. _....
l Mr. George A. Hunger, Jr.
Peach Bottom Atomic Power Station,
)
PECO Energy Company Units 2 and 3 i
1 cc:
j i
J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety I
Sr. V.P. & General Counsel PA Dept. of
)
l PEC0 Energy Company Environmental Resources j
l-2301-Market Street, S26-1 P.O. Box 8469 j
l Philadelphia, PA 19101 Harrisburg, PA 17105-8469 4
l PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Botton Atomic Power Station Peach Bottom Township 1848 Lay Road R. D. #1 i
Delta, PA 17314 Delta, PA 17314 l
PECO Energy Company Public Service Commission of Maryland -
ATTN: Regulatory Engineer, A4-5S Engineering Division 4
Peach Bottom Atomic Power Station Chief Engineer i
Route 1, Box 208 6 St. Paul Centre Delta, PA' 17314 Baltimore, MD 21202-6806 1
)
Resident Inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building i
Annapolis, MD 21401
)
Regional Administrator, Region I U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Manager-Business & Co-owner Affairs Baltimore, MD 21201 Public Service Electric and Gas Company P.O. Box 236 A. F. Kirby, III Hancocks Bridge, NJ 08038-0236 External Operations - Nuclear Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Botton Atomic Power Station P.O. Box No. 195 Route 1, Bcx 208 Wayne, PA 19087-0195 Delta, PA 17314