MONTHLY OPERATING REPORT DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE July 8, 1985 COMPLs1su BI R. R Goodenow TELEPHONE (114) 676-8460 PART A OPERATIONS
SUMMARY
JUNE 1985 Callaway operated at 100% power for the month of June except for a Reactor Trip on June 7, a load reduction on June 15 and 16 for secondary plant equipment maintenance, and a Reactor Trip on June 20.
(See Part E).
Restart from the Reactor Trip on June 20 was delaved due to maintenance while shutdown.
Q PART B PORV AND SAFETY VALVE
SUMMARY
NONE d
D CA-#804 05/09/84 100483 850630 QDP-ZZ-04204 3
ADOCK O p g.1 og 4 s/i
Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.
UNIT Callaway DATE Julv 8. 1985 COMPLETED BY R. R. Goodenow (314) 676-8460 TELEPHONE MONTH JUNE 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL e
(MWe Net)
(MWe Net) 1 977 17
'1109 1093 1111 2
gg 3
IIII 19 1091 1002 350 4
3 1108 0
5 21 1114 18
~
4 22 1050 474 y
23 0
1009 8
24 321 1055 to 955 3
1032 11 1108 27 1095 III9 1108 12 3
1121 1108 93 3
1103 1105 14 y
729 15 33 944 to 0 [h84 Page 2 of 4 QDP-ZZ-04204
Part D OPERATING DATA REPORT 50-483 DOCKET NO.
UNIT Callaway July 8. 1985 DATE j
R. R. Goodenow COMPLETED BY
}
(314) 676-8460 TELEPHONE i
OPERATING STATUS
)
- 1. mEPontiNG PEmioo:
JUNE 1985 GnosE Moums IN REPORTING PEmiOO:
720 3411 1120
- 2. cummENTLY AuTMonizEo PoWEm LEVELiuwo:
uax. oEPENo. cAPAciTV imme.Neo:
ossaGN ELEctmicAL MATING tune.Neo:
1171*
At stretch reactor power icvel which
- 3. POWEm LEVEL TO WHICM mESTaicTED ttP ANY) iMWeg, Ioperating license.
is not currentiv authorized under t o
- 4. mEASONE Pom mESTmictiON taf ANYl:
)
TMiS MONTM Ym TO DATE CuuuLAfivE 659.9 3901.0 4203.5
- 5. NumeEn op wouns mEActom wAs em TicAL 0
0 0
- s. meAcrom mEstavE swuToowN woums 645.4 3814.1 4116.6
- 7. wouns GENER Atom ON UNE 3
0 0
0 E. um T mesenvE sMuToown wouns
- 1.990.891 11.735.562 12.737.087
- 9. gross TwEmMAL ENEmGY GENER ATED (MWHI 671.559 3.973.273 4 11' 453 to. Gmoss ELECTmicAL ENEmGY GENEmATEn tuWMt..
636.424 3.766.759 A nRo 782 1t. NET ELECTalCAL ENEmGY GENER ATED (WWMI i
91.7%
89.8%
90,st
- 12. mEAcTom sEnvict FActon 91.7%
89.8%
90.57
- 13. REACTom AvAiLAssury P Actom 89.6%
37.8%
88.6Y
- 14. unit sEnvict FACTom.
89.6%
87.8%
RR 6Y ts. uwsT AvAiLAsiuTY PACTom 78.9%
77.4%
7R 6Y to. uNif cAPActTY P AcTom au.ng uaci t 7. uNif CAPACITY 8 ACTOm (uong Doogn WWel...
75.57d 74.Ir*
75.2%_*
10.4%
5.7%
5.1%
- 18. uNif PomCE0 0uTAGE RATE
- 19. SMuTDOWNE ScMEDULED OVEm NEXY $ MONTMS ITYPt. DATE. AND OumATION OP EACMI:
- 20. IP SMUT DOWN AT END OP REPORT PEmlOO ESTIMATED OATE OF STARTUP:
l Page 3 of 4 QDP-ZZ-04204 i
o i
Part E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway QATE July 8, 1985 R. R. Goodenow COMPLETED BY JUNE 1985 TELEPHONE (314) 676-8460 REPORT MONTil METHOO OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDutED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTWNTS 10 850607 Forced 20.4 A
3 Reactor Trip from 100% power due to high negative flux rate.
LER 85-026-00 11 850615 Scheduled 0
B 1
Load reduced for secondary plant equipment maintenance.
12 850620 Forced 54.2 G
1 Reactor trip from 100% power due to Lo-Lo steam generator level.
LER 85-031-00 SUANdARY:
CA-f804 e'
' 05/09/84 Page 4 of 4 QDP-ZZ-04204
7 2-4 UNION EtecTnic COMPANY CALLAWAY PLANT mAsLmo Acomass:
P O. BOM SEO FULTON. MO. 6 5 3 51 July 9, 1985 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1132
Dear Sir:
DOCKET NUlBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JUNE 1985 The enclosed Monthly Operating Report for June 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
AE/Lkt S. E. Miltenberger Manager, Callaway Plant Y$
NET /WRC/RRG/drs Enclosure cc: Distribution attached 0
}V[\\
b
i '.
cc distribution for ULNRC-1132 with enclosures-l Mr. James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt. Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S.. Nuclear. Regulatory Commission Washington, DC. 20555 NRC Resident Inspector 4
}
i I
e i
).
t i
l
. O k
+
'O bec distribution for ULNRC-1132 1
with enclosures Records Center Institute of Nuclear Power Operations Suite 1500 1100 circle 75 Parkway Atlanta, CA 30339 American Nuclear. Insurers Library c/o Dottie Sherman The Exchange Suite 245 1
270 Farmington Avenue Farmington, CT 06032 d
Lonnie Benson Callaway Project Manager Westinghouse Electric Corp.
P. O.. Box 355 5
Pittsburgh, PA 15230 D. F. Schnell 4
J. F. McLaughlin J. E. Davis (Z40MOR)
R. L. Powers D. W. Capone A. C. Passwater/D. E. Shafer/D. J. Walker G. A. Hughes W. R. Campbell M. E. Taylor W. R. Robinson (QA Record)
R. R. Goodenow L. K. Robertson (NSRB)
K. R. Bryant W. L. Reuler (MC 048)
R. J. Irwin/J. M. Brown (MC 470)
.i SEM Chrono 3456-0021.6 Z40ULNRC G56.37 N. Date e
j f
i 1
.