ML20135B218

From kanterella
Jump to navigation Jump to search

Forwards Page from DPC Signifying Implementation of Operating License Amends 155 & 147 on 961226
ML20135B218
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/02/1996
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-M94276, TAC-M94277, NUDOCS 9612040213
Download: ML20135B218 (2)


Text

1

  • . cf ,

'y wt UNITED STATES g j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON D.C. 20666-0001

...../

December 2, 1996 ),

i

\

1 MEMORANDUM FOR:g: Docket: File '~

FROM:- Peter S. Tam, Senior Project Manager Project Directorate 11-2 i Division of Reactor Projects - I/II i Office of Nuclear Reactor Regulation i

SUBJECT:

. CATAWBA UNITS 1 AND 2 - IMPLEMENTATION OF AMENDMENTS 155 AND 147 TO OPERATING LICENSES (TAC M94276 AND M94277)' l The attached page, transmitted by fax from Duke Power Company, signifies the :i i

implementation of operating license Amendments 155 (for Unit 1) and 147 (for l

Unit 2) on November 26, 1996.

f Docket Numbers 50-413 and 50-414 l l

Distribution , f Docket file l PUBLIC i H. Berkow 'l I .h QWY)fD 1  ;

I l 040041 ,

9612040213 961202 -

PDR ADOCK 05000413 l P PDR i i

l'., .:

Compliance Functional Area Manual 3.3 FOI/r5 Rev. 2 l Enclosure 5 Page1 of2 FACILITY OPERATING LICENSEfrECHNICAL SPECIFICATION CIIANGE IMPLEMENTATION SHEET f

kCNS O MNS O ONS UNIT NO.kl M 2 0 3 75NO.3 I.l.l s 3 I I.L DATE RECEIVED ll h f 94' AMENDMENT. NO. (4 ) [5$ th l47srTE PLAN NO(5). rVIA i 1. IMPLEMENTATION DATES l

A. NRC EFFECTIVE DATE (From NRC letter): _ lo/ 30/ %

B. STATION IMPLEMENTATION (Grace Period - 2 WEEKS): / // 29 l%,

2. PLANT NOTIFICATION initiah aiuto A. x/g Via E-Mail Distribution; Include Site Technical Contacts B, / '

Pre-implementationItems

3. RGC TECHNICAL CONTENT REVIEW CRITERIA A. All Discrepancies Have Been Resolved Via NRC Interface.

V, B. No Inmivertent Changes Were Made To TS Sheets involved QC./nlu, T W S Change WasIssued As equested ByDPC.  !

f TECHNICAL REVTFWER: -

., AC //- E 9 [e (List Discrepancies On A ed Page) Date CHECKED BY: M-GLIo J f f'lf%

(List Digrepancies On Attached Pap) w, mg Date 4.

k ALL CORRECTIVE ACTIONS FROM ASSIGNED PIP COMPLETED OW VERIFIED BY:

Regulatory Compliance m _i' b Date  !

5. FINALIMPLEMENTATION APPROVAL NW Manager, Regulatory Cdnpliance ulwhc, Date Df Manager, Safety Assurance ll-2(o-9t.,

Date goo @ 3XVI'IdK03 IE01Y'I.193H T6TCICSC09 IY3 91:1T NOK 96/CO/ET