Forwards Page from DPC Signifying Implementation of Operating License Amends 155 & 147 on 961226
ML20135B218
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/02/1996
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-M94276, TAC-M94277, NUDOCS 9612040213
Download: ML20135B218 (2)


Text

1 cf wt UNITED STATES

'y g

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON D.C. 20666-0001

...../

December 2, 1996

)

i

\\

1 MEMORANDUM FOR:g: Docket: File '~

FROM:-

Peter S. Tam, Senior Project Manager Project Directorate 11-2 i

Division of Reactor Projects - I/II i

Office of Nuclear Reactor Regulation i

SUBJECT:

. CATAWBA UNITS 1 AND 2 - IMPLEMENTATION OF AMENDMENTS 155 AND 147 TO OPERATING LICENSES (TAC M94276 AND M94277)'

l The attached page, transmitted by fax from Duke Power Company, signifies the

i i

implementation of operating license Amendments 155 (for Unit 1) and 147 (for l

Unit 2) on November 26, 1996.

f Docket Numbers 50-413 and 50-414 l

f Distribution Docket file l

PUBLIC i

H. Berkow

'l I

.h QWY)fD 1

I l

040041 9612040213 961202 PDR ADOCK 05000413 l

P PDR i

i

l'.,

Compliance Functional Area Manual 3.3 FOI/r5 Rev. 2 Page1 of2 FACILITY OPERATING LICENSEfrECHNICAL SPECIFICATION CIIANGE IMPLEMENTATION SHEET f

kCNS O MNS O ONS UNIT NO.kl M 2 0 3 75NO.3 I.l.l s 3 I I.L DATE RECEIVED ll h f 94' AMENDMENT. NO. (4 ) [5$ th l47srTE PLAN NO(5).

rVIA i

1.

IMPLEMENTATION DATES l

A.

NRC EFFECTIVE DATE (From NRC letter): _

lo/ 30/ %

B.

STATION IMPLEMENTATION (Grace Period - 2 WEEKS):

/ // 29 l%,

2.

PLANT NOTIFICATION initiah aiuto A.

x/g Via E-Mail Distribution; Include Site Technical Contacts B,

/

Pre-implementationItems 3.

RGC TECHNICAL CONTENT REVIEW CRITERIA A.

All Discrepancies Have Been Resolved Via NRC Interface.

V, B.

No Inmivertent Changes Were Made To TS Sheets involved QC./nlu, S Change WasIssued As equested ByDPC.

T W

f AC

//- E 9 [e TECHNICAL REVTFWER:

(List Discrepancies On A ed Page)

Date CHECKED BY:

M-GLIo J f f'lf%

(List Digrepancies On Attached Pap) w, mg Date k

ALL CORRECTIVE ACTIONS FROM ASSIGNED PIP COMPLETED OW 4.

_i' b

VERIFIED BY:

m Regulatory Compliance Date 5.

FINALIMPLEMENTATION APPROVAL NW

ulwhc, Manager, Regulatory Cdnpliance Date Df ll-2(o-9t.,