Similar Documents at Cook |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17335A5621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 2.With 991012 Ltr ML17335A5631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 1.With 991012 Ltr ML17326A1201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr ML17326A1211999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr ML17326A0861999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr ML17326A0871999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr ML17326A0511999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr ML17326A0501999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 1.With 990709 Ltr ML17326A0071999-05-31031 May 1999 Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr ML17326A0061999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr ML17335A5301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr ML17335A5291999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 2.With 990508 Ltr ML17325B5441999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant,Unit 1.With 990408 Ltr ML17325B5491999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr ML17325B4631999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr ML17325B4621999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Plant,Unit 1.With 990308 Ltr ML17335A5201999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Dccnp Unit 1.With 990208 Ltr ML17335A5191999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Dccnp,Unit 2.With 990208 Ltr ML17335A4831998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 2.With 990108 Ltr ML17335A4841998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 1.With 990108 Ltr ML17335A3951998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for DC Cook Nuclear Plant,Unit 2.With 981207 Ltr ML17335A3941998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for DC Cook Nuclear Plant,Unit 1.With 981207 Ltr ML17335A3331998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Plant,Unit 1.With 981105 Ltr ML17335A3381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Power,Unit 2.With 981105 Ltr ML17335A2931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for DC Cook Nuclear Plant,Unit 2.With 981005 Ltr ML17335A2941998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for DC Cook Nuclear Plant,Unit 1.With 981005 Ltr ML17335A2131998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DC Cook Nuclear Plant,Unit 2.W/980903 Ltr ML17335A2151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DC Cook Nuclear Plant,Unit 1.W/980903 Ltr ML17335A1741998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 2.W/980806 Ltr ML17335A1731998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 1.W/980806 Ltr ML17334B8171998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DC Cook Nuclear Plant Unit 2.W/980706 Ltr ML17334B8131998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DC Cook Nuclear Station,Unit 1.W/980706 Ltr ML17334A7511998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DC Cook Nuclear Plant,Unit 2.W/980609 ML17334A7521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DC Cook Nuclear Plant,Unit 1.W/980609 Ltr ML17334B7921998-04-30030 April 1998 Addendum to Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Station,Unit 2 ML17334B7721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Plant,Unit 1.W/980506 Ltr ML17334B7911998-03-31031 March 1998 Addendum to Monthly Operating Rept for Mar 1998 for DC Cook Nuclear Plant,Unit 2 ML17334B7171998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980407 Ltr ML17334B7181998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980407 Ltr ML17334A6831998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980309 Ltr ML17334A6811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980309 Ltr ML17334B7901998-02-28028 February 1998 Addendum to Monthly Operating Rept for Feb 1998 for DC Cook Nuclear Plant,Unit 2 ML17334A6481998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2.W/980209 Ltr ML17334B7891998-01-31031 January 1998 Addendum to Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2 ML17334A6051997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 2 ML17334A6021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 1.W/980108 Ltr ML17334B6711997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 2.W/971208 Ltr ML17334A6061997-11-30030 November 1997 Revised Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Station,Unit 2 ML17334B6651997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 1.W/971208 Ltr ML17333B1421997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Donald C Cook Nuclear Plant,Unit 1.W/971110 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17335A5641999-10-18018 October 1999 LER 99-024-00:on 990708,literal TS Requirements Were Not Met by Accumlator Valve Surveillance.Caused by Misjudgement Made in Conversion from Initial DC Cook TS to W Std Ts.Submitted License Amend Request.With 991018 Ltr ML17335A5531999-10-0707 October 1999 LER 99-023-00:on 990907,inadequate TS Surveillance Testing of ESW Pump ESF Response Time Noted.Caused by Inadequate Understanding of Plant Design Basis.Surveillance Tests Will Be Revised & Implemented ML17335A5631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 1.With 991012 Ltr ML17335A5621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 2.With 991012 Ltr ML17335A5481999-09-30030 September 1999 Non-proprietary DC Cook Nuclear Plant Units 1 & 2 Mods to Containment Sys W SE (Secl 99-076,Rev 3). ML17335A5451999-09-28028 September 1999 Rev 1 to Containment Sump Level Design Condition & Failure Effects Analysis for Potential Draindown Scenarios. ML17326A1291999-09-17017 September 1999 LER 99-022-00:on 990609,electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads,Was Discovered. Caused by Lack of Understanding of Design of Plant.No Immediate Corrective Actions Necessary ML17326A1481999-09-17017 September 1999 Independent Review of Control Rod Insertion Following Cold Leg Lbloca,Dc Cook,Units 1 & 2. ML17326A1211999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr ML17326A1201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr ML17326A1121999-08-27027 August 1999 LER 99-021-00:on 990728,determined That GL 96-01 Test Requirements Were Not Met in Surveillance Tests.Caused by Failure to Understand Full Extent of GL Requirements. Surveillance Procedures Will Be Revised or Developed ML17326A1011999-08-26026 August 1999 LER 99-020-00:on 990727,EDGs Were Declared Inoperable.Caused by Inadequate Protection of Air Intake,Exhaust & Room Ventilation Structures from Tornado Missile Hazards. Implemented Compensatory Measures in Form of ACs ML17326A0911999-08-16016 August 1999 LER 99-019-00:on 990716,noted Victoreen Containment Hrrms Not Environmentally Qualified to Withstand post-LOCA Conditions.Caused by Inadequate Design Control.Reviewing Options to Support Hrrms Operability in Modes 1-4 ML17326A0771999-08-0404 August 1999 LER 98-029-01:on 980422,noted That Fuel Handling Area Ventilation Sys Was Inoperable.Caused by Original Design Deficiency.Radiological Analysis for Spent Fuel Handling Accidents in Auxiliary Bldg Will Be Redone by 990830 ML17335A5461999-08-0202 August 1999 Rev 0 to Evaluation of Cook Recirculation Sump Level for Reduced Pump Flow Rates. ML17326A0871999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr ML17326A0861999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr ML17326A0741999-07-29029 July 1999 LER 99-018-00:on 990629,determined That Valve Yokes May Yield Under Combined Stress of Seismic Event & Static,Valve Closed,Stem Thrust.Caused by Inadequate Design of Associated Movs.Operability Determinations Were Performed for Valves ML17326A0661999-07-26026 July 1999 LER 99-017-00:on 990625,noted That Improperly Installed Fuel Oil Return Relief Valve Rendered EDG Inoperable.Caused by Personnel Error.Fuel Oil Return Valve Was Replaced with Valve in Correct Orientation.With 990722 Ltr ML17326A0651999-07-22022 July 1999 LER 98-014-03:on 980310,noted That Response to high-high Containment Pressure Procedure Was Not Consistent with Analysis of Record.Caused by Inadequate Interface with W. FRZ-1 Will Be Revised to Be Consistent with New Analysis ML17326A0491999-07-13013 July 1999 LER 99-016-00:on 990615,TS Requirements for Source Range Neutron Flux Monitors Not Met.Caused by Failure to Understand Design Basis of Plant.Procedures Revised.With 990713 Ltr ML17326A0331999-07-0101 July 1999 LER 99-004-01:on 971030,failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed Was Noted.Caused by Ineffective Mgt of Tss.Chemistry Personnel Have Been Instructed on Requirement to Follow TS as Written ML17326A0511999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr ML17326A0501999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 1.With 990709 Ltr ML17326A0151999-06-18018 June 1999 LER 99-014-00:on 990521,determined That Boron Injection Tank Manway Bolts Were Not Included in ISI Program,Creating Missed Exam for Previous ISI Interval.Caused by Programmatic Weakness.Isi Program & Associated ISI Database Modified ML17325B6421999-06-0101 June 1999 LER 99-013-00:on 990327,safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Have Led to ECCS Pump Failure.Caused by Inadequate Original Design Application of Si.Throttle Valves Will Be Developed ML17325B6311999-06-0101 June 1999 LER 99-S03-00:on 990430,vital Area Barrier Degradation Was Noted.Caused by Inadequate Insp & Maint of Vital Area Barrier.Repairs & Mods Were Made to Barriers to Eliminate Degraded & Nonconforming Conditions ML17326A0061999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr ML17326A0071999-05-31031 May 1999 Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr ML17325B6351999-05-28028 May 1999 LER 99-S02-00:on 990428,vulnerability in Safeguard Sys That Could Allow Unauthorized Access to Protected Area Was Noted. Caused by Inadequate Original Plant Design.Mods Were Made to Wall Opening to Eliminate Nonconforming Conditions ML17265A8231999-05-24024 May 1999 LER 98-037-01:on 990422,determined That Ice Condenser Bypass Leakage Exceeds Design Basis Limit.Caused by Pressure Seal Required by Revised W Design Not Incorporated Into Aep Design.Numerous Matl Condition Walkdowns & Assessments Made ML17325B6001999-05-20020 May 1999 LER 99-012-00:on 990420,concluded That Auxiliary Bldg ESF Ventilation Sys Not Capable of Maintaining ESF Room Temps post-accident.Caused by Inadequate Control of Sys Design Inputs.Comprehensive Action Plan Being Developed ML17325B5861999-05-10010 May 1999 LER 99-002-00:on 990415,discovered That TS 4.0.5 Requirements Were Not Met Due to Improperly Performed Test. Caused by Incorrect Interpretation of ASME Code.App J Testing Will Be Completed & Procedures Will Be Revised ML17325B5811999-05-0404 May 1999 LER 99-011-00:on 990407,air Sys for EDG Will Not Support Long Operability.Caused by Original Design Error.Temporary Mod to Supply Makeup Air Capability in Modes 5 & 6 Was Prepared ML17325B5771999-05-0303 May 1999 LER 99-010-00:on 990401,RCS Leak Detection Sys Sensitivity Not in Accordance with Design Requirements Occurred.Caused by Inadequate Original Design of Containment Sump Level. Evaluation Will Be Performed to Clearly Define Design ML17335A5301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr ML17335A5291999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 2.With 990508 Ltr ML17325B5581999-04-16016 April 1999 LER 99-006-00:on 990115,personnel Identified Discrepancy Between TS 3.9.7 Impact Energy Limit & Procedure 12 Ohp 4030.STP.046.Caused by Lack of Design Basis Control.Placed Procedure 12 Ohp 4030.STP.046 on Administrative Hold ML17325B5471999-04-12012 April 1999 LER 99-009-00:on 990304,as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit Occurred.Cause Investigation for Condition Has Not Been Completed.Update to LER Will Be Submitted,Upon Completion of Investigation ML17325B5321999-04-0707 April 1999 LER 99-S01-00:on 990308,discovered That Lock for Vital Gate Leading to Plant 4KV Switchgear Area Was Nonconforming & Vulnerable to Unauthorized Access.Caused by Inadequate Gate Design & Inadequate Procedures.Mods Are Being Made to Gate ML17325B5161999-04-0101 April 1999 LER 99-007-00:on 981020,calculations Showed That Divider Barrier Between Upper & Lower Containment Vols Were Overstressed.Engineers Are Currently Working on Analyses of Loads & Stress on Enclosures ML17325B5491999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr ML17325B5441999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant,Unit 1.With 990408 Ltr ML17325B5221999-03-29029 March 1999 LER 99-001-00:on 960610,degraded Component Cooling Water Flow to Containment Main Steam Line Penetrations,Identified on 990226.Caused by Inadequate Understanding of Design Basis.Additional Investigations Ongoing ML17325B4801999-03-18018 March 1999 LER 99-004-00:on 971030,failure to Perform TS Surveillance Analyses of Rc Chemistry with Fuel Removed Was Noted.Cause of Event Is Under Investigation.Corrected Written Job Order Activities Used to Control SD Chemistry Sampling ML17325B4741999-03-18018 March 1999 LER 99-005-00:on 940512,determined That Rt Breaker Manual Actuations During Rod Drop Testing Were Not Previously Reported.Caused by Lack of Training.Addl Corrective Actions,Including Preventative Actions May Be Developed ML17325B5671999-03-0202 March 1999 Summary of Unit 1 Steam Generator Layup Chemistry from 980101 to 990218. ML17325B4631999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr ML17325B4621999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Plant,Unit 1.With 990308 Ltr ML17325B4571999-02-24024 February 1999 LER 99-003-00:on 990107,CR Pressurization Sys Surveillance Test Did Not Test Sys in Normal Operating Condition.Caused by Failure to Recognize Door 12DR-AUX415 as Part of CR Pressure Boundary.Performed Walkdown of Other Doors 1999-09-30
[Table view] |
Text
-.. _ . .. _ _ _ _ . ._ _ _ - . ._ ._ . _ . . _
-l 3
t.?. .. 0FE-;."IHS M TR E *Un T ,
2 Dro rT M O. -' 1 3 m:r 1 .<_.
.,I,
.i -
',,.m.
' :g f* ';3.:J 1,d 3 a,[ s r i
~ELEF rCT M h -4 i M+ '
OE'EF AT D'3 9TATUii
- 1. Unit N ar.w D. C. Cmu i to"' 2 i
- 2. Reper t i n;; Per i o !- JUNE 'M :notn 4 ; . Li .enwd ' Thur N Mn r 'M: 341'. l
- 4 Nmre Flate P s t ; n a. ':r m :t ; O < 7
'L 'it NtN i j '.0 I 6,
Drmion Hectrtri. ' ' _a t i n .a dauimum u ecenaa,c,e .al.. 1. 7 y:.c. -m ,
.L, -t > :.,.'.,.'
i ~ 7. ' Ma -: i mt t.T. DependAbite C m a *_. : i. - 'Nct M%r LCs---------- -- -
, S . I. F Changes. O c cw- to wac i i. R a '. : w= :Itens no. ~ th ottgh 7 '- 3ina
- Lan Repar t Gi va hwan ._ .._. , _ . . . _ _ . . . _ __.._ . . . . _ . _ _ . _ . _ . _ _ . _
. . - _ ~ . . . . _ ~ . . .
i .___&_____.-_ .. _ _ _ . . . . _ . . . . . _ . _ -
I 9. Power Lewil To bhich Re s t: r i d. -3.3 . If Ar.y ' At !Nel _ _ . . . . . _ _ _ . .
i 10. Reasonn For Ear.t 1 diccs. If 'nv _
i . _ , . . . _ _ . _ _ _
~. . . . - _ . _ . _ _ _ _ . .
Thi! Mo. Yr. to Date Curnm.
, .w om ... - *w j p .e s
.t l . yicur s in issoper e t n .. q_
e g
r er i. ad < v.o a a.0a
- 4. _w v.n 1 1.0 4
1,,. . No. af Hr: e . Km.c t or %, , .
r 2 t c a; 7 ,d,> . v w u.O 371 u .O _ i
- 13. Reactor Reser ' e Shutdown ' tot rw i: ,0 0.v - 0. 0 14; Hour, Ger.erator on Line 70.0 4033.5 46032.1
- 15. Unit Feserve Gh it down Houre O.' O.O O.O
- 16. Grosu Therm. En er a v, Gen, W H'* 24516.~' 13527671 14(,603732 WW
- 17. Gross Elect. En +5 ray Ge.
707840 4439430 49225360 18.-Net El act. : Er ergy Gen. (t % 755377 4287769 46'503503
- 19. Unit Service Factcr !00.o 92.9 -72.C
'20. Unit Avail abili ty Factoi~ (00.0 92.9 72.9 i
12 1. Unit Capacity Factor (MDC Net) 99.0 93.1- 69.5
<- 21 Unit. Capacity Factoi- (DER Net > 05.4 99.8 60.O. ,
- 23. Unit-Ferced 'utat;a. R ath 0.0 S.B 't2 24 Chutdowns 5thodulud overwNext Si'- Mon t 'v. T /ue O.E t o , md U.rationi ,
4 19_8_5_ Refuel,ing _0utage , scheduled _to s, tart _,0ctob_er,1_985, _ Estimated _durat_ ion,, _
i 10_0.da.s. ..-.J--._... - ._ ... - . - ..
... ._ _ . .... . . . . _ - . . . _ . ~ - - . .
C5. If Shut Ear: At;End cF Report Periodi S timatec: Date of (? t a r t u p :
1 . _ . . ~ . ._ _
- . _ - . _ - . .---.__..r__-___._.._. _ . _ _ _ _ _ _ _ _ _ .
> 2A. '.ini is -i n Test - Statuq -(Pr i or t a Ccm:m:trci a7 Cp er ,t i. cc t : - l
~~c ,r m e t. A :h t <vc d
< INITI AL CRIi U,A.I T' 1 INITIAL. ELEi.TE' CITY CGMMERCIf.L ;FERATION h
f F
k t
t 1 9'1 e , .
. Ii,o
t o
' 8.
' ( L, . * . . j y' '
'l k k *
, , fd. . g - ,- , , , 8t.
,* s - 1; Tl *O.
) .' *
. g a gv j4,l ,
- w.
~
'. 217't f F E9.D bV
~
l ' .1 '71[P ,
F! ' riiotJE :1> in5 7,701
- rr
,s - r, ,s
- ! ,. . .. I ; .-
-$ .' ' ' ". s " ' f t . # ' 8"i .
, .17 s'i4 'M , OS I ', .
. ' O h ! i~%,'E !
D it POWffi4 f..E* !Ct .
D fa v I
'.) ~t f [ s, 1 ' t u in 1 C 8
'.' 10:37 t066 .7 1 n1 6
.: 05.j
".'. 1+: 4 I
. t v 2-5 21 .10 O a
17 l')32 b lob 3 1061 2' 1024 7 , , , b. ) ,m,., .D
,, e
.--. .,3s' .4 Ab 9 O'i3 - ~.; U 1018
,e /, 4- cc.s
} 1,,1 :
-; c.-- .(
,q 7 Id 4 11 k b,Er - 4'.~ /
'j f3 [ Q 4,7
'C } O'/ 4 i; L Op 27 1056 14 IO6C 30 1059 1 tim 31 -o l's d '. k h .' b e
e
e 50-316 .'.
DOCKEl NO.
llNIT SilullHlWNS ANil POWEN HEDilri1ONS D.C. Cook, Unit 2 UNIT NAblE IIATE 7-6-85 COMPl ETED BY B.A. Svensson June, 1985 Ht'PO RT M ONill TELEPilONE 616/465-5901 "t. -
-, ,y g 'h h" I iccusee E .e,, fa, Cause A Causcclive No. llate Q gg j{ ) s a: !! vent E? gb3 Aui.no to Peevens Heciusence t-oE gE j@g Hep ni e vi O g
55 There were no Unit shutdowns or sig-nificant power reductions during the month. The Unit operated at a ca-pacity factor of 99.0% (MDC).
1 I 2 .I 4 I:: 1 in ceil Heason: McIlnul: Eminbit G -lusisucli wis S: Solicilutc.I A I?.psipincies 1:ailuie (1 nplain)
. 1-Manual fin l'acpasatiini of Data is Maintenance us Teil 2 Manual Scsans. Entsy Slicces fue 1.icenwe C.Hefueling .1 Autunutic Ssain. livens Hegawa il l'HI1 de INilH1'G-D Hegulainiy Mcsinictions Oslace (limplain t UlfilI l
ILOpesalus I~saining a licenw 1:mandnation I? Asinduistsalive 5 G Opesaniwul tienn Elisplain) 1hinbit 1 - Saane S.unce 19//7) ll Ollies ilisplain)
u.W.a.. u _ . . .. .- ._....o _ , . . . . . n -
i s .
UNITSHUTDOWNS AND POWER REDUCTIONS INSTRUCTIONS This report shou!d descnbe all plant shutdowns during te in accordance with the tacle appearms on the report form.
. report penod. In addition. it should be the source of explan. If category 4 must be used, supply brief comments.
anon of sigmacant dips m average power levels. Each signi.
Scant reducuon in power level (greater than 20", reductica LICENSEE EVENT REPORT =. Reference the applicable m average daily power level for the preceding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) uponsole occurance pertaming to se outage or power should be noted, even though de urut may not have been reducuen. Enter the Ers: four pans (event year. sequennai shut down completelyl . For such reduchons in power level. mport numcer, occurrence code and report type) of the tive the duranon should be listed as :ero, the method of reduction part designation.as descnbed in item 17 of Instruccons for should be listed as 4 (Other). and me Cause and Cor:ecuve Preparanon of Data Entry Sheets for L:censee Event Report Acnon to Prevent Recunence column shculd explain. The (LER) File (NUREG.0161). Th:s informanon may not be Cause and Correcuve Acuan to Prevent Recurrence column immediately evident for all such shutdowns, uicourse, smce should be used to provide any needed explanation to fully turther mvesugauon may be required to ascertam whether ur 4
. desenbe the circumstances of the outage or power reduction. not a uponable occurrence was involved.) If the outage or power reduction wtll not result in a reportaole occurrence.
NUMBER. This column should indicate the sequennal num. the postuve mtcation of th:s lack of correlat:on should be her asagned to each shutdown or sigmdcant reducticra s.1 power noted as not applicable (N/A).
for that salvedar year. When a shutdown or sigmacant power SYSTEM CODE. The system in which the outage or power reducnon begms m one report period and encs trt another. g g gg g
, , g ,, .
an entry should be made tot both report penods to be sure si! shutdowns or sig:udcant power reduedons are reported. xNMt G . Instrucuens for Paparauon of Data Enuy Sheets Unul a urut has sch:eved 1:s Erst power generation, no num. for Licensee Event Report (LER) Fi!e (NUREC4151).
ber should be assiped to each entry. Systems that do not Gt any exist:ng code should be designs.
ted XX. The code ZZ should be used for those events where DATE. This column should ;ndicate the date of the start a system is not appucable, of each shutdown or ugmilcant power reduccon. Report cs year. =enth and day. August ia.19'r7 would be reported COMPONENT CODE. Select de most appropriate ;amponent as C814. -When a shutdown or s:grufIcant power reducuen from Exhibit I . Instruccons for Preparanon of Data E::tr)
!, begins m one repcrt per:od and ends m another, an entry should Sheets for Licensee Event Report (LER) Fde(NUREG.0161).
be made for both report penods to be sure all shutdowns usms the followmg entiena:
or sgmEcant power reduccons are reported.
TYPE. Use -F" or "S" to indicate either " Forced" or "Sene.
I duled." respeedveiy, for each shurcown or sigmScant power 8. If not a component fas!ure, use the related component:
reducuan. Forums shutdowns inciude those required to be e.g.. wrong valve operated through error: list valve as l intuated by no hter than the weekend following discovery component.
of an off. normal condition. It is recoptzed that some judg.
ment is required in categonzmg shutdowns in this way. In C. If a cham of failures occurs. the first cornponent to mai.
pneral a forced shutdown is one that would not have been function should be listed. The secuence of events, melud.
completed in the absence of the condition for which correcuve ing the other components wluch faal, should be descnbed i
acton was taken.
l onder the Cause and Correcuve Acuan to Prevent Recur.
rence colurna.
l DURATION, Self. explanatory. When a shutdown extends beyond the end or a report penoa, count only the time to the Components that do not ilt any exasung code snould be de.
! end or the report pened and pick us the ensuing down tune signated XXXXXX. The code ZZZZZZ should be used for in te followmg recort pericds. Report dueanon of outays events where a component despacion is not appticaole.
, rounded to ute nearest tenen of an hout to facditate summanon.
- The sum of the total outage hours plus the hours the pnera. C4USE & CORRECTIVE ACTION TO PREVENT RECUR.
RENCE. Use the column in a narrat:ve fashion to ampitfy or l tor was on line snould equal the gross hours tn the reportag penod. expiam the circumstances of me shutdown orpcwer recucuan.
l The column should include the soectile cause for each shut.
REASON. Categonze by tetter deugnation in accordance down or sap Heant pnwer reduchon and the immediate anc l
- with the raele aposurmg vn the report form. If category H contemplated long term correcuve scuon taken. if appropn.
j must he used.supciy brter eumments. su. TMs column mould also be used for a ducnodon of me maior safety.reisted correct 2ve mamtenance performed dunna METHOD OF SHUTTING DOWN THE REACTOR OR the outage or power reducuan me!uding an idennilcation of REDUCLNG POWER. Categonze by number desgnauen 'h' # **I l
E**" "'" Y *"" * "P* " #' *"Y "#!I' ''*** #
radioactmty or imple radisuon exposure spee:ttesily ::sce:.
I Nue that this difiers from the Edison Electne losuture . ateo with the outage which accounts for more thn 10 sen.ent
! t EEI) denmuons of -Ferced Parnal Outare" and "Sene. of ta' 2ilowso;e annual values.
t Juled Part:al Outage." For these tenni. eel uses . shange of For long textual reports sont:nue narrative on separcte ; sper p 30 MW as the break pumt. Fur larger power reactuts.30 MW and rererense :he shutdown or power redu tivn u tn:.
- .
- s t.u > mall a .hany to warrant esptananon, narranve.
p --
~ * '~
a ' + - ~ ~ - n - . .n y-- - - . - - , , . . , , . , ,,
w , ,e g- y ,m,
Docket No.: 50-316
-' Unit Nam 3 D.C. Cook Unit 2 Completed By: A. S. Puplis Telephone: (616) 465-5901 Date: July 8, 1985 Page: 1 of 2 MONTHLY OPERATING ACTIVITIES - JUNE, 1985 HIGHLIGHTS:
The reporting period began and ended with-the Unit at 100% rated power.
Gross electrical generation for the month of June was 782,840 :
MWH.
l
SUMMARY
6-01-85 'At 2310, 2W-Essential Service Water Pump auto started due to an inadvertant safety injection on Unit 1.
6-04-85 At 0600, a power reduction to 98% to perform surveillance testing was initiated. Reactor power reached 98% at 0734.
At 1428, a power increase to 100% was started. Reactor power reached 100% at 1529.
6-11-85 At 0602, a power. reduction to 98% to perform surveillance testing was initiated. Reactor power reached 98% at 0632.
At 1525, a power increase to 100% was started as a i
result of completion of surveillance testing. Reactor j power reached 100% at 1625. j 6-18-85 At 0605, a-power reduction to 98% to perform surveillance testing was initiated. Reactor-power reached 98% at 0650.
At 1502, a power increase to 100% as.the result of completion of surveillance testing. ' Reactor power-reached 100% at 1559.-
L
/5 * # ^ Docket No.: 50-316
, Unit Nam 2s D.C. Cook Unit 2 Completed By: A. S. Puplis Telephone: (616) 465-5901 Date: July 8, 1985 Page: 2 of 2 1
6-24-85 At.0030, the "E" Containment Spray Pump was declared
. inoperable due to a weld leak on the discharge pressure gauge (IPI-210) tap. The pump was declared operable at 1200 on 6-25-85.
6-25-85 At 0601, a. power reduction to 98% to perform surveillance. testing was initiated. Reactor power reached-98% at 0655.
6-25-85 At 2200, a power increase to 100% was started. Reactor power reached 100%.
The Control Room Cable Vault Halon System remains inoperable as of 1707 on 4-14-83. The backup CO 2 System for the Control Room Cable Vault' remains' operable.
~
- ;q
.g.
DOCKET NO. 50 - 316 UNIT NAME D. C. Cook - Unit.No. 2 DATE 7-6-85 COMPLETED BY B. A. Svensson
' MAJOR SAFETY-RELATED MAINTENANCE
- JUNE, 1985 4
There ' vere:no major safety-related maintenance items during the month of June,-1985.
J
^ <
8 m g 7 4
a
.d.~.
t
. _ ,f-4 v
i
~ '
.J
-t.-
vst ,. IN044NA & St/CHIGAN ELECIRlC.COAfEAMX Donald C. Cook Nuclear Plant P.O. Scu 458, Bridgman, Mchgan 49106 July 6, 1985 Director, Office Of Management Information and Program Control U.~S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.6, the attached Monthly Operating Report for the Month of June,1985 is submitted.
Sincerely, CO W. G. Smith, J .
Plant. Manager WGS:ab Attachments cc: J. E. Dolan M. P. Alexich R. W. Jurgensen NRC Region III
~B. L. Jorgensen R. O. Bruggee R. C. Callen S. J. Mierzwa F. S. VanPelt, Jr.
P. D. Rennix D. R..Hahn Z. Cordero J. J. Markowsky S. R. Khalil J. F. Stietzel
- PNSRC File
- j. INPO Records Center l AN1 Nuclear Engineering Department i
l A
y ,\
,