ML20135B068
| ML20135B068 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/14/1996 |
| From: | Eselgroth P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | James Knubel GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20135B071 | List: |
| References | |
| NUDOCS 9612040155 | |
| Download: ML20135B068 (2) | |
See also: IR 05000289/1996006
Text
.if
Dc0
.
November. 14,1996
Mr. James Knubel
Vice President and Director, TMI'
. GPU Nuclear Corporation -
Three Mile Island Nuclear Station
Post Office Box 480-
Middletown, PA 17057-0191
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NO. 50-289/96-06 AND NOTICE
OF VIOLATION
Dear Mr. Knubel:
. On September 28,1996, the NRC completed an inspection 'at your Three Mile Island 1-
reactor facility. The enclosed report presents the results of that inspection.
The weekly component vibration monitoring program, not required by the IST program,
was an example of an excellent maintenance initiative to detect and correct safety related'-
equipment problems before the component fails or becomes inoperable.
The violation for the improper control of a posted high radiation area entrance is cited in
the enclosed Notice of Violation, and the circumstances surrounding the violation are
' described in detail in the enclosed report. This is a repeat problem involving ~ a lack of
worker sensitivity to plant rules and regulations. Management and supervision's continued
reinforcement of the plant standards is warranted to reverse the present trend. Please note
- that you are required to respond to this letter and should follow the~ instructions specified
in the enclosed Notice when preparing your response. The NRC will use your response, in
part, to determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
Original Signed By:
9612040155 961114
Peter W. Eselgroth, Chief
ADOCK 05000289
Projects Branch No. 7
C
'
Division of Reactor Projects
,
Docket No.:
50-289
License No.:
I
p
a .
.t
-
,.
Mr. James Knubel
2
Enclosures:
2. NRC Inspection Report No. 50-289/96-06
cc w/ encl:
E. L. Blake, Shaw, Pittman, Potts and Trowbridge (Legal Counsel for GPUN)
J. C. Fornicola,' Director, Licensing and Regulatory Affairs
M. J. Ross, Director, Operations and Maintenance
TMI-Alert (TMIA)
J. S. Wetmore, Manager, TMI Regulatory Affairs
Commonwealth of Pennsylvania
'
Distribution w/ encl:
Region i Docket Room (with concurrences)
1
Nuclear Safety Information Center (NSIC)
i
NRC Resident inspector
PUBLIC
D. Screnci, PAO
T. Kenny,DRS
P. Eselgroth, DRP
D. Haverkamp, DRP
C. O'Daniell, DRP.
Distribution w/ encl (VIA E-MAIL):
W. Dean, OEDO
Inspection Program Branch, NRR (IPAS)
R. Correia, NRR
R. Frahm, Jr., NRR
DOCUMENT NAME: G:\\ BRANCH 7\\TMi\\TMl9606. INS
Ta receive e copy of thle document. Indicate in the boa: "C" = Copy without ettechment/ enclosure
"E' = Copy with attechment/ enclosure
"N" = No copy
OFFICE
Rl/DRP ,
Rl/DRP
$
/
NAME
$ gap!!))p,
DATE
f11/dAHT6
11/WitF"
11/ /96
11/ /96
11/ /96
'
OFFICIAL P'cCORD COPY
.
I
,