_...
PETED E. K4rz Bahimore Uas and Electric Company Plant General Manager Calvert Cliffs Nuclear Power Plant Calvett Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 February 21,1997 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 1996 Steam Generator Tube Insnection Results Reoort
REFERENCE:
(a)
Calvert Cliffs Units 1 and 2 Technical Specifications 4.4.5.5.b Reference (a) requires that we report, on an annual basis, the results of the steam gen:rator tube inservice inspection conducted in the past year. This report includes the number and extent of tubes examined, imperfections noted, and the identity of tubes plugged. Attached please find the report of steam generator tube examinations conducted on the Unit I steam generators in April 1996. The Unit I steam generator tube inspection results required 340 total tubes to be plugged in No.11 Steam Generator and 500 total tubes to be plugged in No.12 Steam Generator. The number of circumferential flaws detected were 58 in No.11 Steam Generator and 38 in No.12 Steam Generator. No similar inspections were conducted on the Unit 2 steam generators in 1996.
Should you have questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours, 9702270273 970221
?
i gDR ADOCK 05000317; P. E. Katz
-Q f PDR i Plant General Manager I
PEK/RCG/bjd Attachment
.n._.
. :. -.#. npw. f. -.--
1 Document Control Desk February 21,1997 Page 2 cc:
A. W. Dromerick, NRC H. J. Miller, NRC Resident Inspector,NRC R. I. McLean, DNR J. H. Walter, PSC (Without Attachment)
D. A. Brune, Esq iire J. E. Silberg, Esquire Director, Project Directorate I-1, NRC I