ML20135A149

From kanterella
Jump to navigation Jump to search
Confirms as-built Team Insp on 850909-20,per 850827 Discussion.Insp Will Examine Selected Fluid,Electrical, Instrumentation & HVAC Sys as Stated in FSAR
ML20135A149
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/29/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8509100021
Download: ML20135A149 (2)


Text

,

AUG 2 91985 Docket No.

50-423 Northeast Nuclear Energy Company ATTN: Mr. J. F. Opeka Senior Vice President - Nuclear Engineering and Operations Group P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:

Subject:

As-Built Team Inspection by NRC at Millstone Unit 3 This letter is to confirm the NRC Region I intent to perform an As-Built Team Inspection at the Millstone Unit 3 site during the September 9 - 20, 1985 pericd. These plans were originally discussed by Mr. James T. Wiggins of this office, with Mr. D. O. Nordquist, of your staff, on August 27, 1985.

The inspection will examine the installed conditions of selected fluid, electrical, instrumentation and HVAC systems to verify that these systems implement the design intent reflected in the FSAR.

Further details have been provided to Mr. L. Nadeau of your staff. A team of six Region I inspectors and 1 section chief will conduct the inspection.

Your staff will be informed of any significant findings on a daily basis to facilitate resolution or prompt corrective actions. An exit interview will be held on September 20, 1985, and the final report will be issued through our normal correspondence process.

If you have any further questions regarding this planned inspection, contact James T. Wiggins of my staff (215) 337-5198.

M t

Ebneter, Director Division of Reactor Safety cc:

V. Papadopoli, Construction Quality Assurance Supervisor E. R. Foster, Director of Generation Construction E. J. Mroczka, Vice President, Nuclear Operations D. O. Nordquist, Manager of Quality Assurance R. T. Laudenat, Manager, Generation Facilities Licensing W. D. Romberg, Station Superintendent Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear-Safety Information Center (NSIC)

NRC Senior Resident Inspector State of Connecticut t

h.Q \\

0FFICIAL RECORD COPY WIGGINc9/28/85 - 0001.0.0 f.

f509100021 850829 08/28A i

'ko PDR ADOCK 05000423 1

0 PDR

.~.

L Northeast Nuclear Energy Company 2

1 i

bcc:

Region I Docket Room (with concurrences)

DRP Section Chief G. Walton, SRI, Beaver Valley Unit 2 RI:DRS:

RI:DRS Wiggins/cgl.

D

f. -

s\\<

4u hr OFFICIAL ~ RECORD COPY-WIGGINS8/28/85 - 0002.0.0 08/28/85 rr

+-

y gwpp-g-g y,y-i-v g-,me

  • evc-g>m-+,

,. =, - +g