s e.
February 14, 1997 4
Mr. Robert W. Sharkey, Manager Regulatory Compliance Combustion Engineering, Inc.
3300 State Road P Hematite, MO 63047
SUBJECT:
CRITICALITY SAFETY PROGRAM UPDATE (TAC NO. L30937)
Dear Mr. Sharkey:
This acknowledges receipt of your letter of December 20, 1996, transmitting a copy of the first quarterly status report of Combustion Engineering's (CE)
Criticality Safety Program Update (CSPU).
CE's CSPU plan was submitted on September 20, 1996, and is designed to formalize and strengthen CE's nuclear criticality safety program at the Hematite, Missouri site.
In that plan, you committed to submit a progress report of the implementation of the CSPU on a quarterly basis.
We are pleased to know from your December letter that the progress on the CSPV is essentially on schedule.
Your cooperation in keeping us informed of the progress of the CSPU is appreciated.
Sincerely, j
2 Original signed by:
g%
Michael F. Weber, Chief gg % h Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-36 License SNM-33 Distribution (Control No. 630S)
I {'f.
Docket 70-36 PUBLIC NRC File Center FCSS R/F
\\
Region III FCLB R/F TSherr, FRIB PTing, FCOB GShear, RIII NMSS R/F Schotoo
[celtr2.ss]
0FC FCLB C
FCLB b FCLB[h FCLB D
NAME SSoong6)
PShea
[)u?S GPangburn MWeber M DATE 2/ /@/97 2//8/97' 2/ / 7/97 2/ ///97 i
^
9702260365 970214 PDR ADOCK 07000036 C
f g&* * *# Q'o 4
. p 1
-4 UNITED JTATES g
j NUCLEAR REGULATORY COMMISSION e
R WASHINGTON, D.C. 2056M001 o
',*****ad
+
February 14, 1997 i
i k
Mr. Robert W. Sharkey, Manager Regulatory Compliance Combustion Engineering, Inc.
3300 State Road P i
Hematite, MO 63047 i
SUBJECT:
CRITICALITY SAFETY PROGRAM UPDATE (TAC NO. L30937)
Dear Mr. Sharkey:
This acknowledges receipt of your letter of December 20, 1996, transmitting a copy of the first quarterly status report of Combustion Engineering's (CE)
Criticality, Safety Program Update (CSPU).
2 CE's CSPU plan was submitted on September 20, 1996, and is designed to formalize and strengthen CE's nuclear criticality safety program at the Hematite, Missouri site.
In that plan, you committed to submit a progress report of the implementation of the CSPU or a quarterly basis, We are pleased to know from your December letter that the progress on the CSPU l
is essentially on schedule.
Your cooperation in keeping us informed of the progress of the CSPU is appreciated.
Sincerely, W.aff&