Responds to to Chairman Jackson Expressing Concern About Discovery of Cut Wire in safety-related Circuitry Located in Control Room Area of Plant
ML20134Q093
Person / Time
Site: Maine Yankee
Issue date: 11/22/1996
From: Miraglia F
NRC (Affiliation Not Assigned)
To: Myers H
AFFILIATION NOT ASSIGNED
Shared Package
ML20134D183 List:
References
NUDOCS 9612020122
Download: ML20134Q093 (4)


Text

(

m f r,, y ; y,

b

  • .[;

/{> l p* 3Df 3

w Nodem6er(22,51996K",L_j:'<'f g

y,, \\ N KQ y

Q,

$q 4

. g, f, c.t 3, b,

$g " '

t i

'y A_q

< - Mf, i

4 s

Mr. Henry R.:Myers i

p t

1, Post Office Box 88 Np", f' " *. ~

%,, i s "'

  • (*

m ~.

Peaks Island, ME 04108 4"

(,

us

,o.

Dear Mr. Myersi Q'u

(,l 7 I am responding to your letter of September 16, 1996 to

' Jackson, in which you expressed concern about the discov; Chairman Shirley Ann ery of a cut wire in' safety-related circuitry located in the control room area'of the Maine Yankee.

Atomic Power Station. You also stated that this matter raises serious doubt as'to whether maintenance and testing procedures'were conducted in accordance with U.S. Nuclear Regulatory Commission (NRC) regulations.' Specifically, you requested that the NRC, considering:the findings of the NRC Independent Safety Assessment Team at Maine Yankee, address the eight questions that you presented in your letter.

The circumstances surrounding the discovery of the cut wire are currently under NRC. review. The licensee has implemented corrective actions to verify the ' proper operation of both the affected and other, similar circuits. The licensee also-has completed its root cause analysis specific to the cut wire, and that, too, is currently under NRC staff review. The NRC is in the process of determining what action, if any, is appropriate. Therefore, the questions you raise will be addressed in a forthcoming inspection report. This inspection report will be placed in the local public document room. The NRC'

' staff also will provide you with a copy of the inspection report when it is issued.

Sincerely, OrYgital signed by Frank J. Kiraglia Frank J. Miraglia, Jr.

Acting Director, Office of Nuclear Reactor Regulation DRPE:NRR DRPE:NRR AE00 OE ADPR DDorman*

SVarga*

Jordan

  • Lieberman* 'Zimmerman*

10/21/96 10/25/96 10/23/96 110/24/96 10/28/96 M(Q OGC NRR ED0 OCM c

JGoldberg*

FMiraglia*

JTaylor.

SJackson**

11/5/96 11/6/96 11/12/96-11/22/96 v

L L a,

(

  • See previous concurrence.

e J

    • Concurred with edits - See Attached "D

'4 4

s s

\\

7 C

4

.,,s x

y+

e

  • [

N,~)

d' 4

a v y

i 020018-

  • ;f ; ~

~;

gy 9612020122 961122 s ("*

PDR ADOCK 05000309 o

H PDR l

  • i'l' l!

~

pM%

4, t

UNITED STATES j

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 20666 4 001

\\..... j/

November 22, 1996 i

Mr. Henry R. Myers Post Office Box 88 4

Peaks Island, ME 04108

Dear Mr. Myers:

I am responding to your letter of September 16, 1996 to Chairman Shirley Ann Jackson, in which you expressed concern about the discovery of a cut wire in safety-related circuitry located in the control room area of the Maine Yankee Atomic Power Station. You also stated that this matter raises serious doubt as to whether maintenance and testing procedures were conducted in accordance with U.S. Nuclear Regulatory Commission (NRC) regulations. Specifically, you requested that the NRC, considering the findings of the NRC Independent Safety Assessment Team at Maine Yankee, address the eight questions that you presented in your letter.

The circumstances surrounding the discovery of the cut wire are currently under NRC review. The licensee has implemented corrective actions to verify the proper operation of both the affected and other, similar circuits. The licensee also has completed its root cause analysis specific to the cut wire, and that, too, is currently under NRC staff review.

The NRC is in the process of determining what action, if any, is appropriate.

Therefore, the questions you raise will be addressed in a forthcoming inspection report.

This inspection report will be placed in the local public document room.

The NRC staff also will provide you with a copy of the inspection report when it is issued.

Sincerely, 1

S g4

,A FrankJ.$"ragl'ia, r.

Acting Director, Office of Nuclear Reactor Regulation

\\

DISTRIBUTION:

1

' Docket File PUBLIC (w/ incoming) i EDO #96722 j

PDI-3 Reading (w/ incoming)

JTaylor JMilhoan l

HThompson 1

'JBlaha EJordan, AE00 FMiraglia/AThadani JLieberman RZimmerman TMartin, DRPM SVarga-JZwolinski EMerschoff, AE00 D0orman HMiller, RI RConte, RI i

JGoldberg, OGC PMilano N01 son OPA OCA i

NRR Mail' Room (ED0#96722 w/ incoming)

CNorsworthy i

EPeyton SECY (CRC-96-1016)-

KCyr, OGC

( -

ACTION j

4 i

e EDO Principal Correspondence Control

!FROM DUE: 10/07/96 EDO CONTROL: GT96722 i

DOC DT: 09/16/96 FINAL REPLY:

Hanry R. Myers

!TO:

].

Chairman Jackson jFOR.SIGNATUREOF

    • PRI CRC'NO: 96-1016 Chairman Jackson DESC ROUTING:

CUT. WIRE IN SAFETY-RELATED CIRCUITRY LOCATED IN Taylor THE MAINE YANKEE CONTROL ROOM AREA Milhoan j

Thompson Blaha i

HMiller, RI Jordan, AEOD I

DATE: 09/24/96 Cyr, OGC

.)

ASSIGNED TO:

CONTACT:

NRR Russell

.SPECIAL INSTRUCTIONS OR REMARKS:

j

~~

NRR ROUTING:

SEPTEMBER.24, 199d hCTION NRR ACTION:

DRPE:VARGA g((E TO ?iRR D RcCIOR'S UFhiE NRR ROUTING:

RUSSELL MIRAGLIA THADANI f

/d

~h I h_____ __ I i

ZIMMERMAN gy ~

~~0 T-MARTIN B0HRER i

l 1

i i