ML20134P914

From kanterella
Jump to navigation Jump to search

Proposed Tech Spec,Amplifying Surveillance Requirements for Component Cooling Water Sys Valves.Certificate of Svc Encl
ML20134P914
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/03/1985
From:
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20134P902 List:
References
TAC-60017, NUDOCS 8509090096
Download: ML20134P914 (2)


Text

'

  • LCA 127 Attachment 1 Page 1 of 1 <

PLANT SYSTEMS 3/4.7.3 COMPONENT COOLING WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.3.1 At least two independent component cooling water loops shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With only one component cooling water loop OPERABLE, restore at least two loops to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in COLD SHUTDOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

SURVEILLANCE REOUIREMENTS 4.7.3.1 At least two component cooling water loops shall be demonstrated OPERABLE:

a. At least once per 31 days by verifying that each valve (manual, power operated or automatic) servicing safety related equipment that is not locked, sealed, or otherwise secured in position, is in its correct position.
b. By verifying that each component cooling water pump is OPERABLE when tested pursuant to Specification 4.0.5.
c. At least once per 18 months, during shutdown, by verifying that each automatic valve servicing safety related equip-ment actuates to its correct position on one or more of the following signals, as appropriate:
1. A Containment isolation signal,
2. A Containment isolation signal coincident with a low CCW surge tank level, or
3. A high-high Containment pressure signal.
d. By verifying that each power operated (excluding automatic) valve is OPERABLE when tested pursuant to Specification 4.0.5.

8509090096 850903 PDR ADOCK 05000344 P PDR TROJAN-UNIT 1 3/4 7-13 Amendment No. 74

1 l

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

PORTLAND GENERAL ELECTRIC COMPANY, ) Docket 50-344 THE CITY OF EUGENE, OREGON, AND ) Operating License NPF-1 PACIFIC POWER & LIGHT COMPANY )

)

(TROJAN NUCLEAR PLANT) )

i l

CERTIFICATE OF SERVICE I hereby certify that copies of License Change Application 127 to the Operating License for Trojan Nuclear Plant, dated September 3,1985, have been served on the following by hand delivery or by deposit in the United States mail, first class, this 3rd day of September 1985:

Mr. Lyr.. Frank, Director State or Oregon Department of Energy Labor & Industries Blds, Rm 102 Salem OR 97310 Mr. Robert L. King Chairman of County Commissioners Columbia County Courthouse St. Helens OR 97051

,w__- _

r Gt A. Zimmerman, Manager Nu lear Regulation Branch Nuc ear Safety & Regulation Cubscribed and sworn to before me this 3rd day of September 1985.

d2 d Y NotaryPublicofOregn

~

My Commission Expires: Mrs # N /f[f ,

l / '

l i

. - , , , _ _ . - . - . . - . , - - - . . . . - . . . . . - . _ . . .