ML20134P399
| ML20134P399 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 11/19/1996 |
| From: | Bordine T CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20134P403 | List: |
| References | |
| NUDOCS 9611290070 | |
| Download: ML20134P399 (1) | |
Text
a Consumers
,m OI Thomas C.Bordine Manager; Licensing SMM M Palisades Nuclear Plant. 27780 Blue Star Memorial Highway, Covert, MI 49043 November 19, 1996 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR FALISADES PLANT REVISION 16 TO THE PALISADES SUITAz'N_ITY, TRAINING AND QUALIFICATION PLAN Q
Attached are one original and three copies of Revision 16 to the Palisades Suitability, Training and Qualification Plan. The attachment includes a description of, and the justification for, the changes included in Revision 16.
Consumers Power Company has determined that the changes contained in this revision do not degrade the safeguards effectiveness of the Plan. Accordingly, this revision is submitted under the provisions of 10 CFR 50.54(p)(2).
SUMMARY
OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.
l
- gT 6
[+L Thomas C. Bordine Manager, Licensing CC Administrator, Region lil, USNRC (2)
Project Manager, NRR, USNRC NRC Resident inspector - Palisades of, O
^ttecn m eat 9611290070 94.1119 PDR ADOCK 05000255 Eivvvs A CKSEM6"RGYCOMPANY
-