ML20134P347

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-416/96-17 on 960929-1109 & Notice of Violation
ML20134P347
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/25/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hagan J
ENTERGY OPERATIONS, INC.
Shared Package
ML20134P349 List:
References
NUDOCS 9611290047
Download: ML20134P347 (6)


See also: IR 05000416/1996017

Text

_

_

. . . .-

_.

.

. _

-

__

_

_.

. _ . . _ _

. . . .

Y b $g

n

., iga McO ,k .

r

UNITED STATES

NUCLEAR REGULATORY COMMISSION

? i,ei ,s

- ~

c

REGloN tv

I*

611 RYAN PLAZA oRIVE, SulTE 400

%

~V

9

AR LINGToN. TE XAS 760118064

  • ...*

NOV 2 51996

J. J. Hagan, Vice President

Operations - Grand Gulf

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

SUBJECT: NRC INSPECTION REPORT 50-416/96-17 AND NOTICE OF VIOLATION

Dear Mr. Hagan:

i

An NRC inspection was conducted September 29 through November 9,1996, at your

Grand Gulf Nuclear Station reactor f acility. The enclosed report presents the scope and

,

results of that inspection.

During the 6-week period covered by this inspection period, your conduct of activities at

the Grand Gulf facility was generally characterized by safety-conscious operations, sound .

,

!

engineering and maintenance practices, and careful radiological work controls. We are

concerned, however, about two violations of NRC requirements that were identified.

The first violation is of concern because operators failed to perform Technical Specification

i

surveillance requirements because of an incorrect information tag which had not been peer

i

reviewed for accuracy. The second violation is of concern because an electrical

,

maintenance supervisor failed to revise a work package when the work scope changed.

This failure to revise the work package resulted in an electrician receiving an electrical

i

shock while working on a motor control center that was powered' from a temporary source,

i

l

- The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding the violations are described in detailin the enclosed report. Please note that

you are required to respond to this letter and should follow the instructions specified in the

i

l

enclosed Notice when preparing your response. The NRC will use your response, in part,

l

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

r

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

j

its enclosure (s), and your response will be placed in the NRC Public Document Room

(PDR). To the extent possible, your response should not include any personal privacy,

proprietary, or safeguards information so that it can be placed in the PDR without

redaction.

4

5

4

h

l

l

9611290047 961125

PDR

ADOCK 05000416

i

G

PDR

1

..

.

. - . .

. _ .

. - _ _ .

-

- - - ,

- . - . - ~ - - . . - - . _ . . - _ - -

. - - - .

-.-

' ' ' ,

.

,

Entergy Operations, Inc.

-2-

r

!

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

'{

'

.

J.

. Dyer, Director

Division of Reactor Projects

Docket No.: 50-416

I

License No.: NPF-29

Enclosures:

,

1. Notice of Violation

2. NRC Inspection Report

50-416/96-17

cc w/ enclosures:

Executive Vice President

'

and Chief Operating Officer

'

Entergy Operations, Inc.

'

P.O. Box 31995'

Jackson, Mississippi 39286-1995

i

,

!

Wise, Carter, Child & Caraway

'

P.O. Box 651

Jackson, Mississippi 39205

Winston & Strawn

"

l

1400 L Street, N.W. - 12th Floor

Washington, D.C. 20005-3502

Sam Mabry, Director

'

Division of Solid Waste Management

Mississippi Department of Natural

'

Resources

P.O. Box 10385

Jackson, Mississippi 39209

President

i

Claiborne County Board of Supervisors

j

Port Gibson, Mississippi 39150

'

I

i

!

I

_

. - . _ . . - .

.-

.

- _ - - . - .

_

I

,,v:,

Entergy Operations,- Inc.

-3-

{

l

h

Mr. Rod Rogers 68-7

I

Bechtel Power Corporation-

Nuclear Operating Plant Services

t

9801 Washington Boulevard

Gaithersburg, Maryland 20878-5356

,

General Manager

i

Grand Gulf Nuclear Station

~

Entergy Operations, Inc.

,

P.O. Box'756

+

Port Gibson, Mississippi 39150

The Honorable William J. Guste, Jr.

Attorney General

.

Department of Justice

State of Louisiana

P.O. Box 94005

Baton Rouge, Louisiana 70804-9005

Office of the Governor

State of Mississippi

i

' Jackson, Mississippi 39201

'

'!

Mike Moore, Attorney General

Frank Spencer, Asst. Attorney General

State of Mississippi

P.O. Box 22947

i

Jackson, Mississippi 39225

i

Dr. F. E. Thompson, Jr.

State Health Officer

State Board of Health

P.O. Box 1700

j

Jackson, Mississippi 39205

Eddie S. Fuente, Director

State Liaison Officer

Division of Radiation Health

Mississippi Department of Health

P.O. Box 1700

Jackson, Mississippi 39215 1700-

'

l

- .-.

.

O

Entergy Operations, Inc.

-4-

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Director, Nuclear Safety

and Regulatory Affairs

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

Vice President, Operations

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

1

!

l

l

1

.

I

--

.-

,* A

.

- NOV 2 51996

'

Entergy Operations, Inc.

-5-

,

'

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

j

E-Mail report to Richard Correia (RPC)

E-Mail report to Ronald Frahm, Jr. (RKF)

'sbcc to DMB (IE01]

.

bec distrib. by RIV:

.

L. J. Callan

Senior Resident inspectors (River Bend)

'

DRP Director

DRS-PSB

Branch Chief (DRP/D)

MIS System

-

Project Engineer (DRP/D)

RIV File

i

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident inspectors (Grand Gulf)

a

.i

j

,

)

-

!

2

I

4

i

l

5

.

i

DOCUMENT NAME: R:\\_GG\\GG617RP. JET

j

To receive copy of document. Indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures "N" = No copy

SRI

C:DRP/D

D:DRP

,

,

m

,

i

JETed

PHHarr

JEDyer

i

.

11/ h. /96

11/l4496b

11/26/96

OFFICIAL RECORD COPY

\\

\\

290007

..

_-_ _ . _ _ _ . . _

. . - _

_ . _ _ . _ . _ _ _ _ _ - - _ _ -

_ _ _ _

- 2

,

4

I

NOV 251996

l

Entergy Operations, Inc.

-5-

,

1

I

"

,

4

E-Mail report to D. Nelson (DJN)

'

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail teport to Richard Correia (RPC)

-l

4

E-Mail report to Ronald Frahm, Jr. (RKF)

i

l

bec to DMB (IE01)

!

bec distrib. by RIV:

,

}

L. J. Callan

Senior Resident inspectors (River B::nd)

DRP Director

DRS-PSB

.

Branch Chief (DRP/D)

MIS System

i

Project Engineer (DRP/D)

RIV File

I-

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

j

Resident inspectors (Grand Gulf)

i

I

e

i

i

!

u

1

i

'

!

.

i

i

i

I

D JUMENT NAME: R:\\_GG\\GG617RP. JET

To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

)

SRI

C:DRP/D j,

D:DRP

m

,

JETed

PHHarr

>

JEDyer

f

!

11/ h /96

11/M496%

11/25/96

l

OFFICIAL RECORD COPY

i

s

J,

-

-.