ML20134P309

From kanterella
Jump to navigation Jump to search
Amends 107 & 88 to Licenses DPR-53 & DPR-69,respectively, Clarifying & Increasing Flexibility for Determination of RCS Leakage
ML20134P309
Person / Time
Site: Calvert Cliffs  
Issue date: 08/26/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20134P312 List:
References
NUDOCS 8509060237
Download: ML20134P309 (14)


Text

I

}

d p uso g

f f4 UNITED STATES y

g NUCLEAR REGULATORY COMMISSION 5

j WASHINGTON, D. C 20555

%,...../

BALTIM0RE GAS AND ELECTRIC COMPANY DOCKET NO. 50-317 CALVERT CLIFFS NUCLEAR POWER PLANT UNIT N0. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.107 License No. DPR-53 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Baltimore Gas & Electric Company (the licensee) dated January 31, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to'the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

P'28scTgigggg, ed i

r 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-53 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.107, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY C0Pt11SSION

~<

Edward J. Butcher, Acting Chief Operating Reactors Branch #3 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: August 26, 1985 i

i l

I

ATTACHMENT TO LICENSE AMENDMENT NO. 107 FACILTIY OPERATING LICENSE NO. DPR-53 DOCKET NO. 50-317 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by amendment numb 2r and contain vertical lines indicating the areas of change. The corresponding overleaf pages are provided to maintain document completeness.

Remove Pages Insert Pages 3/4 4-13 3/4 4-13 3/4 4-14 3/4 4-14 3/4 4-15 3/4 4-15

REACTOR COOLANT SYSTEM 3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.6.1 The following Reactor Coolant System leakage detection systems shall be OPERABLE:

a.

A containment atmosphere particulate radioactivity monitoring

system, b.

. The containment sump level alarm system, and I

c.

A containment atmosphere gaseous radioactivity monitoring system.

1 APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

l a.

With only two of the above required leakage detection systems I

~

OPERABLE, operation may continue for up to 30 days provided grab samples of the containment atmosphere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when either the required gaseous or I

i particulate radioactivity monitoring system is inoperable; otherwise be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, i

b.

With only one of the above required leakage detection systems OPERABLE, operation may continue for up to 7 days provided that:

1.

Grab samples of the containment atmosphere are obtained and '

analyzad at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and 2.

The Reactor Coolant System water inventory balance of Surveillance Requirement 4.4.6.2.c is performed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

t Otherwise be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS i

4.4.6.1 The leakage detection systems shall be demonstrated OPERABLE by:

a.

Containment atmosphere gaseous and particulate monitoring systems-performance of CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST at the frequencies specified in Table 4.3-3, and b.

Containment sump level alarm system-performance of CHANNEL CALIBRATION at least once per 18 months.

i CALVERT CLIFFS - UNIT 1 3/4 4-13 Amendment No.107

}

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM LEAKAGE LIMITING CONDITION FOR OPERATION 3.4.6.2 Reactor Coolant System leakage shall be limited to:

a.

No PRESSURE B0UNDARY LEAKAGE, b.

1 GPM UNIDENTIFIED LEAKAGE, c.

1 GPM total primary-to-secondary leakage through steam generators, and d.

10 GPM IDENTIFIED LEAKAGE from the Reactor Coolant System.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

a.

With any PRESSURE BOUNDARY LEAKAGE, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With any Reactor Coolant System leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKAGE, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.6.2 Reactor Coolant System leakages shall be demonstrated to be within each of the above limits by:

a.

Either:

1.

Monitoring the containment atmosphere particulate or gaseous radioactivity at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, or 2.

With the gaseous and particulate monitors inoperable, conducting the containment atmosphere grab sample analysis in accordance with the ACTION requirements of T.S. 3.4.6.1.

b.

Monitoring the containment sump discharge frequency at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, when the containment sump level alarm system is

OPERABLE, CALVERT CLIFFS - UNIT 1 3/4 4-14 Amendment No. 107 l

REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued) c.

Performance of a Reactor Coolant System water inventory balance at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during steady state operation and at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when required by ACTION 3.4.6.1.b, except when operating in the shutdown cooling mode, and d.

Monitoring the reactor vessel head closure seal leakage detection system at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

r b

CALVERT CLIFFS - UNIT 1 3/4 4-15 Amendment No.107 m

I REACTOR COOLANT SYSTEM CHEMISTRY LIMITING CONDITION FOR OPERATION 3.4.7 The Reactor Coolant System chemistry shall be maintained within the limits specified in Table 3.4-1.

APPLICABILITY: At all times.

ACTION:

MODES 1, 2, 3 and 4 a.

With any one or more chemistry parameter in excess of its Steady State Limit but within its Transient Limit, restore the parameter to within its Steady State Limit within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With any one or more chemistry parameter in excess of its Transient Limit, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

MODES 5 and 6 With the concentration of either chloride or fluoride in the Reactor Coolant System in excess of its Steady State Limit for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or in excess of its Transient Limit, reduce the pressurizer pressure to < 500 psia, if applicable, and perform an engineering evaluation to determine the effects of the out-of-limit condition on the structural integrity of the Reactor Coolant System; determine that the Reactor Coolant System remains acceptable for continued operation prior to increasing the pressurizer pressure above 500 psia or prior to proceeding to MODE 4.

SURVEILLANCE REQUIREMENTS 1

4.4.7 The Reactor Coolant System chemistry shall be determined to be within the limits by analysis of those parameters at the frequencies specified in Table 4.4-3.

CALVERT CLIFFS - UNIT 1 3/4 4-16 l

i

r k-

[#

UNITED STATES t

NUCLEAR REGULATORY COMMISSION

,.g WASHINGTON. D. C. 20555

% y,,,+

BALTIMORE GAS AND ELECTRIC COMPANY DOCKET NO. 50-318 CALVERT CLIFFS NUCLEAR POWER PLANT UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 88 License No. DPR-69 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Baltimore Gas & Electric Company (the licensee) dated January 31, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter It B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

i

, 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.2 of Facility Operating License No. DPR-69 is hereby amended to read as follows:

2.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 88, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

l 3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Edward J. Butcher, Acting Chief Operating Reactors Branch #3 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: August 26, 1985 I

i l

l

ATTACHMENT TO LICENSE AMENDMENT NO.ng FACILTIY OPERATING LICENSE NO. DPR-69 DOCKET NO. 50-318 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change. The corresponding overleaf pages are provided to maintain document completeness.

Remove Pages Insert Pages 3/4 4-13 3/4 4-13 4

3/4 4-14 3/4 4-14 a

3/4 4-15 3/4 4-15 i

i i

i 6

b 1

l l

REACTOR COOLANT SYSTEM 3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.6.1 The following Reactor Coolant System leakage detection systems shall be OPERABLE:

a.

A containment atmosphere particulate radioactivity monitoring

system, b.

The containment sump level alarm system, and c.

A containment atmosphere gaseous radioactivity monitoring system.

APPLICABI'ITY: MODES 1, 2, 3 and 4.

L ACTION:

a.

With only two of the above required leakage detection systems l

OPERABLE, operation may continue for up to 30 days provided grab samples of the containment atmosphere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when either the required gaseous or l

particulate radioactivity monitoring system is inoperable; otherwise be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With only one of the above required leakage detection systems OPERABLE, operation may continue for up to 7 days provided that:

1.

Grab samples of the ccentainment atmosphere are )btained and analyzed at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and 2.

The Reactor Cc,olant System water inventory balance of Surveillance Requirement 4.4.5.2.c is performed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Otherwise be in at least HOT STANDBY within the next 6 nours and SURVEILLAN IRE N 4.4.6.1 The leakage detection systems shall be demonstrated OPERABLE by:

i a.

Containment atmosphere gaseous and particulate monitoring systems-performance of CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST at the frequencies specified in Table 4.3-3, and b.

Containment sump level alarm system-performance of CHANNEL CALIBRATION at least once per 18 months.

CALVERT CLIFFS - UNIT 2 3/4 4-13 Amendment No. 88 l

l l

i REACTOR COOLANT SYSTEM t

REACTOR COOLANT SYSTEM LEAKAGE LIMITING CONDITION FOR OPERATION 3.4.6.2 Reactor Coolant System leakage shall be limited to:

a.

No PRESSURE BOUNDARY LEAKAGE, b.

1 GPM UNIDENTIFIED LEAKAGE, c.

1 GPM total primary-to-secondary leakage through ste=m generators, and d.

10 GPM IDENTIFIED LEAKAGE from the Reactor Coolant System.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

a.

With any PRESSURE BOUNDARY LEAKAGE, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With any Reactor Coolant System leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKAGE, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.6.2 Reactor Coolant System leakages shall be demonstrated to be within each of the above limits by:

a.

Either:

1.

Monitoring the containment atmosphere particulate or gaseous radioactivity at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, or 2.

With the gaseous and particulate monitors inoperable, conducting the containment atmosphere grab sample analysis in accordance with the ACTION requirements of T.S. 3.4.6.1.

b.

Monitoring the containment sump discharge frequency at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, when the containment sump level alarm system is

OPERABLE, CALVERT CLIFFS - UNIT 2 3/4 4-14 Amendment No.88

REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued) c.

Performance of a Reactor Coolant System water inventory balance at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during steady state operation and at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when required by ACTION 3.4.6.1.b, except when operating in the shutdown cooling mode, and d.

Monitoring the reactor vessel head closure seal leakage detection system at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

CALVERT CLIFFS - UNIT 2 3/4 4-15 Amendment No. 88 i

l e

i REACTOR COOLANT SYSTEM CHEMISTRY LIMITING CONDITION FOR OPERATION 3.4.7 The Reactor Coolant System chemistry shall be maintained within the limits specified in Table 3.4-1.

APPLICABILITY: At all times.

ACTION:

1 l

MODES 1, 2, 3 and 4 a.

With any one or more chemistry parameter in excess of its Steady State Limit but within its Transient Limit, restore the parameter to within its Steady State Limit within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, b.

With any one or more chemistry parameter in excess of its Transient Limit, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

MODES 5 and 6 With the concentration of either chloride or fluoride in the Reactor Coolant System in excess of its Steady State Limit for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or in excess of its Transient Limit, reduce the pressurizer pressure to < 500 psia, if applicable, and perform an engineering i

evaluation to determine the effects of the out-of-limit condition l

on the structural integrity of the Reactor Coolant System; determine that the Reactor Coolant System remains acceptable for continued operation prior to increasing the pressurizer pressure above 500 psia or prior to proceeding to MODE 4.

J SURVEILLANCE REQUIREMENTS l

t 4.4.7 The Reactor Coolant System chemistry shall be determined to be j

within the limits by analysis of those parameters at the frequencies l

specified in Table 4.4-3.

9

,. CALVERT CLIFFS-UNIT 2 3/4 4-16 1

- -