. . --_ . .. = - -- . .-

Docket Nos.: 50-443 SEP 3 1985

.. 50-444 MEMORANDUM FOR: George W. Knighton, Chief

l. Licensing Branch No. 3 Division of Licensing FROM: V. Nerses, Project flanager i Licensing Branch No. 3 Division of Licensing l

SUBJECT:

FORTHCOMING SEABROOK SITE VISIT DATE'& TIME: September 18, 19, and 20, 1985 LOCATION: Seabrook Station Seabrook, New Hampshire 7

PURPOSE: To inspect completion of Power System Branch confirmatory items;(see agenda)

PARTICIPANTS: Public Service Company of New Hampshire 4 G. Psouderos, B. Sanchez, et. al i NRC Staff

0. Chopra, V. Nerses

[

Victor Nerses, Project Manager Licensing Branch No. 3 *

> Division of Licensing

Enclosure:

As stated

! cc: See next page Note: NRC neetings are open to interested mcmbers of the public to attend as observers. Members of the public who wish to attend this meeting must contactV.Nerses(301)492-7238) no later-than 3:45 p.m. September 16, 1985.

(The NRC generally does not have access authority to allow men.bers of the public to attend the station tour portion of the meeting. This authority resides with PSNH who has responsibility to maintain physical security and i proprietary information. Therefore, admission of the public to the Seabrook construction site is at the discretion of PSNH. For further information i

about access to the site tour, contact the site representative, Mr. Sanchez,

, at (603) 474-95 1, Extention 2487.)

L 's / BL3/DL VNerses:mk Knighton

9/3 /85 9/ 3 /85 4

j 8509060209 850903 "

DR ADOCM 05000443

, PDR

Mr. Robert J. Harrison

. Public Service Company of New Hampshire Seabrook Nuclear Power Station cc:

Thomas Dignan, Esq. E. Tupper Kinder, Esq.

John A. Ritscher, Esq. G. Dana Bisbee, Esq.

Ropes and Gray Assistant Attorney General 225 Franklin Street Office of Attorney General Boston, Massachusetts 02110 208 State Hosue Annex i

Concord, New Hampshire 03301 l Mr. Bruce B. Beckley, Project Manager i Public Service Company of New Hampshire Resident Inspector Post Office Box 330 Seabrook Nuclear Power Station Manchester, New Hampshire 03105 c/o US Nuclear Regulatory Comission Post Office Box 700 Dr. Mauray Tye, President Seabrook, New Hampshire 03874 Sun Valley Association 209 Sumer Street Mr. John DeVincentis, Director Haverhill, Massachusetts 01839 Engineering and Licensing Yankee Atomic Electric Company Robert A. Backus, Esq. 1671 Worchester Road O'Neil, Backus and Spielman Framingham, Massachusetts 01701 116 Lowell Street Manchester, New Hampshire 03105 Mr. A. M. Ebner, Project Manager United Engineers & Constructors Ms. Beverly A. Hollingworth 30 South 17th Street 7 A Street Post Office Box 8223 Hampton Beach, New Hampshire 03842 Philadelphia, Pennsylvania 19101 William S. Jordan, III Mr. Philip Ahrens, Esq.

Diane Curran Assistant Attorney General Harmon, Weiss & Jordan State House, Station #6 20001 S Street, NW Augusta, Maine 04333 Suite 430 Washington, DC 20009 Mr. Warren Hall Jo Ann Shotwell, Esq. Public Service Company of Office of the Assistant Attorney General New Hampshire Environmental Protection Division Post Office Box 330 One Ashburton Place Seabrook, New Hampshire 03874 Boston, Massachusetts 02108 Seacoast Anti-Pollution League D. Pierre G. Cameron, Jr., Esq. Ms. Jane Doughty General Counsel 5 Market Street Public Service Company of New Hampshire Portsmogth, New Hampshire 03801 Post Office Box 330 Manchester, New Hampshire 03105 Mr. Diana P. Randall 70 Collins Street Regional Administrator, Region I Seabrook, New Hampshire 03874 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

e Public Service Company of Seabrook Nuclear Power Station

. New Hampshire cc:

Mr. Calvin A. Canney, City Manager Mr. Alfred V. Sargent, City Hall Chairman 126 Daniel Street Board of Selectmen Portsmouth, New Hampshire 03801 Town of Salisbury, MA 01950 1

Ms. Letty I'ett Senator Gordon J. Humphrey Town of Brentwood U. S. Senate RFD Dalton Road Washington, DC 20510 Brentwood, New Hampshire 03833 (Attn: TomBurack)

Ms. Roberta C. Pevear Senator Gordan J. Humphrey Town of Hampton Falls, New Hampshire 1 Pillsbury Street Drinkwater Road Concord, New Hampshire 03301 Hampton Falls, New Hampshire 03844 (Attn: Herb Boynton)

Ms. Sandra Gavutis Mr. Owen B. Durgin, Chairman Town of Kensington, New Hampshire Durham Board of Selectmen RDF 1 Town of Durham East Kingstun, New Hampshire 03827 Durham, New Hampshire 03824 Charles Cross, Esq.

Chairman, Board of Selectmen Shaines, Mardrigan and Town Hall McEaschern South Hampton, New Hampshire 03827 25 Maplewood Avenue Post Office Box 366 Mr. Angie Machiros, Chairman Portsmouth, NH 03801 Board of Selectmer.

for the Town of Newbury Newbury, Massachusetts 01950 Mr. Guy Chichester, Chaiman Rye Nuclear Intervention Ms. Cashman, Chairman Committee Board of Selectmen c/o Rye Town Hall Town of Amesbury 10 Central Road Town Hall Rye, New Hampshire 03870 Amesbury, Massachusetts 01913 Jane Spector Honorable Richard E. Sullivan Federal Energy Regulatory Mayor, City of Newburyport Commission Office of the Mayor 825 North Capital Street, NE City Hall Room 8105 Newburyport, Massachusetts 01950 Washington, D. C. 20426 Mr. Donald E. Chick, Town Manager Mr. R. Sweeney Town of Exeter New Hampshire-Yankee Division 10 Front Street Public Service of New Hampshire Exeter, New Hampshire 03823 Company 7910 Woodmont Avenue Mr. William B. Derrickson Bethesda, Maryland 20814 Senior Vice President Public Service Company of New Hampshire Post Office' Box 700, Route 1 Seabrook, New Hampshire 03874

SEABROOK AGENDA FOR SITE VISIT AND DRAWING REVIEW ,

1. Unresolved Items Discussion of unresolved items
2. Control Room
a. Diesel control board, D/G ipoperable status alarm
b. Annunciator panel
c. D.C. system monitoring and alarm
3. Cable Runs and Cable Spreading
a. Degree of separation
b. Penetrations and cable terminations
c. Identification of cables and race.ays
4. Switchgear Rooms
a. General layout
b. Physical and electrical separation of redundant units
5. Battery and Charger Installations ,
a. General layout
b. Physical and electrical separation
c. Ventilation independence
d. Monitoring instrumentation ar.d alarms
6. Diesel Generator
a. Physical and electrical separation of redundant units
b. D/G local control panels, instruments and controls
7. Switchyard
a. General layout
b. Physical and electrical separation of transmission lines, buses, breakers
c. Relay house
d. Control power supplies (AC and DC)

F 1

8. Reactor Building
a. General layout
b. Separation of piping and cabling to redundant equipment
9. Shutdown Outside Control Room
a. Remote shutdown panel arrangcnent, separation and layout
b. Identification of control and monitoring equipment
10. ESF Systens and Pump Rooms
a. General layout
b. Physical and electrical separation of redundant equipment
c. Identification of cables, raceways and equipment
11. Vital Instrumentation Power Supply Installation
a. General layout
b. Physical and electrical separation
c. Monitoring instrumentation
d. Identification of cables, raceways and equipment
12. System Drawings
a. As built D/G control drawings showing (1) bypassing of protective trips on SIAS and (2) SIAS overrides test niode to permit response to SIAS signal
b. Sample as built schematics showing power lockout to active and passive valves - redundant valve indication
c. Sample as built schematic shcwing automatic disconnection of non-safety loads from the safety buses on a safety injection signal
d. Sample as built schematics showing electrical penetration overload protection
13. Verification of design items identified in the analysis of electrical inter-connections between redundant divisions (SER 8.3.1.8) l l
14. Verification of cable routing for RHR system from switchgear all the way to the RHR pumps

SEP 3 IS$5 MEETING NOTICE DISTRIBUTION:

Docket <No(s)ie50-4432 50 444 NRC PARTICIPANTS NRC POR Local PDR 0. Chopra TIC V. Nerses NSIC PRC System LB3 Reading H. Denton/D. Eisenhut H. Thompson /F. Miraglia T. Novak J. Youngblood W. Butler E. Adensam M. Virgilio D. Crutchfield C. Grimes, G. Holahan C. Thomas G. Lainas S. Varga D. Vassallo J. Miller J. Stelz F. Row:ome W. Johr.ston J. P. Knight, Acting Dir., DE R. Bernero R. Bonsak,/ ting, AD/CSE, DE L. Rubenstein W. Houston D. Muller T. Spets F. Schroeder W. T. Russell, Acting Dir., DHFS ACRS (16)

Attorney, OELD J. Partlow B. Grimes E. L. Jordan F. Ingram, PA Receptionist (Only if meeting is held in Bethesda)

Project Manager v u.....

J. Lee bec: Applicant & Service List

. . . ._ _