Forwards Safety Insp Repts 50-440/85-55 & 50-441/85-20 on 850805-09 & 12-16.No Violations Noted
ML20134P187
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 08/30/1985
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20134P189 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8509060183
Download: ML20134P187 (2)


See also: IR 05000440/1985055

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ .

__

- -

,b

.

August 30, 1985

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine safety inspection conducted by Mr. C. H. Scheibelhut

of this office on August 5-9 and 12-16, 1985, of activities at the Perry

Nuclear Power plant authorized by NRC Construction Permit No. CPPR-148 and

CPPR-149 and to the discussion of our findings with Messrs. Lyster, Stead,

Waldron and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

j

No violations of NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

l

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

l

eso9060183 850s30

g[fd8I$ttCd by.!1. F. Wrnick"

--

ADOCK o

o

gDR

_

  • R. F. Warnick, Chief

Projects Branch 1

Enclosure: -Inspection Report No.

50-440/85055(DRP)and50-441/

85020(DRP)

cc w/ enclosure: See Distribution

fit).

'i$

McCormick-Barger/rl

Knop

arnick

8/30/85

8/30/85

8/30/85

/

k

_

-..

,

.

.

l

Cleveland Electric Illuminating

2

Company

Distribution:

J. J. Waldron, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State _ of Ohio

Robert H. Quillin, Ohio

Department of Health

!

(-

l