ML20134P125

From kanterella
Jump to navigation Jump to search
Discusses Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118 & Nov.Nrc Concerned About Failure to Have Properly Calibrated Test Gauges During Performance of Required Surveillance Test
Date released: 05/27/2020 Download: ML20134P125


Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support
ML20134P155
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/14/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
Download: ML20134P155 (25)
Notice of Violation from Insp on 961208-970118.Violation Noted:On 961212,licensee Measures Failed to Assure That Unit 2 RHR Discharge Pressure Gauges Properly Calibr During Performance of Periodic Test
ML20134P136
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/14/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
Download: ML20134P136 (2)
Discusses Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118 & Nov.Nrc Concerned About Failure to Have Properly Calibrated Test Gauges During Performance of Required Surveillance Test
ML20134P121
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/14/1997
From: Shymlock M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: CAMPBELL W R
CAROLINA POWER & LIGHT CO.
References
Download: ML20134P121 (5)